Port of Nome Modification Phase 1 Nome, AK

Agency: Fairbanks Daily News-Miner
State: Alaska
Level of Government: State & Local
Category:
  • 19 - Ships, Small Craft, Pontoons, and Floating Docks
  • C - Architect and Engineering Services - Construction
  • J - Maintenance, Repair, and Rebuilding of Equipment
Opps ID: NBD16887710816481648
Posted Date: Apr 24, 2024
Due Date: May 29, 2024
Source: Members Only
Details for 00074598 Kiewit is soliciting subcontractor bids and material quotes from

Updated 15 hrs ago

00074598

Kiewit is soliciting subcontractor bids and

material quotes from subcontractors and suppliers, including all types of qualified Small Business and Disadvantaged Business Enterprises concerns for the following project:

Port of Nome

Modification Phase 1

Nome, AK

U.S. Army Engineer District, AK

Quotes Due:

May 22, 2024

@ 5:00 PM (AKDT)

Bid Date:

May 29, 2024

@ 2:00 PM (AKDT)

KIEWIT INFRASTRUCTURE WEST CO.

2000 W Intl Airport Rd, Ste C6

Anchorage, AK 99502

Contacts:

Scott Fowlds:

PH (907) 222-9350

FAX (907) 222-9380

Kara Gwin:

PH (360) 693-1478

FAX (360) 693-5582

Email: NW.Estimating@

Kiewit.com

This project will expand the Port of Nome and extend the West Causeway by approximately 3,500 linear feet into the Deep-Water Basin. The work includes 2000 feet of Open Cell Sheet Pile (OCSP) dock face, fender piles combined with floating fendering along the dock face, construction of fuel, water, sewer, electrical, and telecommunications system upgrades, and incidental related work. FAR 52.222-33 Applies to this project: Offerors are required to negotiate or become a party to a Project Labor Agreement and subcontractors are required to become a party to the resulting project labor agreement.

Plans and Specifications are available from the PIEE Solicitation Module website at:

https://piee.eb.mil/sol/xhtml/unauth/index.xhtml via Solicitation Number Search W911KB24R0010.

Services and supplies being solicited include: Bollards, Cathodic

Protection, Camp

Operations, Cement, Concrete, Concrete

Aggregates, Crushing/

Surfacing, Electrical/

Communication, Fencing, Fenders, Fuel, Fuel System upgrade, Naval Architect, Marine Mammal Monitoring,

Rebar, Sheet/Pipe Pile, Signs, Steel Fabrication, Survey, SWPPP, Traffic Control, Tug & Barge, Water/Sewer System upgrades.

In order to assist certified Small Business and Disadvantaged Business Enterprises contractors and suppliers, where feasible Kiewit will divide items of work into smaller tasks or quantities which will permit maximum practicable opportunity of Small and Disadvantaged Businesses.

All subcontractors and material suppliers are required to execute our standard “Subcontract Agreement” or “Material Contract”. We require 100% Performance and Payment, or Supply Bonds. If you have questions regarding these contract agreements, please contact us for a copy. Kiewit will assist in obtaining bonding and lines of credit as required.

We are an Equal

Opportunity Employer

Publish: 4-21, 4-24,

4-28, 5-1, 5-5, 5-8,

5-12, 5-15, 5-19-2024

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >