48--VALVE,BALL

Agency: DEPT OF DEFENSE
State: Federal
Level of Government: Federal
Category:
  • 48 - Valves
Opps ID: NBD00159108772654153
Posted Date: Nov 25, 2022
Due Date: Dec 23, 2022
Solicitation No: N0010422QZB94
Source: Members Only
Follow
48--VALVE,BALL
Active
Contract Opportunity
Notice ID
N0010422QZB94
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE NAVY
Major Command
NAVSUP
Sub Command
NAVSUP WEAPON SYSTEMS SUPPORT
Sub Command 2
NAVSUP WSS MECHANICSBURG
Office
NAVSUP WEAPON SYSTEMS SUPPORT MECH
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Nov 25, 2022 03:51 am EST
  • Original Published Date: Sep 15, 2022 04:05 am EDT
  • Updated Date Offers Due: Dec 23, 2022 03:30 pm EST
  • Original Date Offers Due: Oct 17, 2022 01:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Jan 07, 2023
  • Original Inactive Date: Nov 01, 2022
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 4820 - VALVES, NONPOWERED
  • NAICS Code:
    • 333998 - All Other Miscellaneous General Purpose Machinery Manufacturing
  • Place of Performance:
Description
CONTACT INFORMATION|4|N742.4|WV1|(717) 605-7562|amanda.a.swigonski.civ@us.navy.mil|
ITEM UNIQUE IDENTIFICATION AND VALUATION (MAR 2022)|19||||||||||||||||||||
HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT (NAVICP REVIEW FEB 1991)(FEB 1999)|1|See Section C & E|
INSPECTION OF SUPPLIES--FIXED-PRICE (AUG 1996)|2|||
INSPECTION AND ACCEPTANCE - SHORT VERSION|8|X||X||||||
INSPECTION/ACCEPTANCE POINT|6|||||||
TIME OF DELIVERY (JUNE 1997)|20|0001AA|2|600||||||||||||||||||
GENERAL INFORMATION-FOB-DESTINATION|1|B|
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)|16|stand-alone receiving report-certification combo-recieving report & invoice-material|inspection at destination and acceptance at other-certification inspection at source and acceptance at source-material|TBD|N0
0104|TBD|TBD|N50286|TBD|||N/A||||||
NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1||
EQUAL OPPORTUNITY (SEP 2016)|2|||
WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUNE 2003)|6|one year from delivery of item|one year from delivery of item|||||
WARRANTY OF DATA--BASIC (MAR 2014)|2|||
BUY AMERICAN --FREE TRADE AGREEMENTS--BALANCE OF PAYMENTS PROGRAM - BASIC(DEVIATION 2020-O0019) (MAR 2022))|3||||
NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (OCT 2020)(DEVIATION 2020-O0008)|1||
ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2020)|13||||||||||||||
BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE (DEVIATION 2020-O0019) (JUL 2020))|3||||
BUY AMERICAN-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (NOV 2014)|1||
ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2022)|13|332919|750||||||||||||
NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PERPARDENESS, AND ENRGY PROGAM USE (APRIL 2008))|2||X|
1. The Solicitation POC for this requirement has changed from Tammy Little
(Office Code N742.2) to Amanda Swigonski (Office Code N742.4).
2. This requirement requires access to classified drawings. These drawings are not required to submit a quote, however, in the event of an award, a facility clearance may be required in accordance with FAR 52.204-2.
3. The following proposed delivery schedule applies:
RADIOGRAPHIC SHOOTING SKETCHES (RSS) 45 DAYS AFTER CONTRACT AWARD PRIOR TOPERFORMING RADIOGRAPHY.
REVIEW (APPROVAL/DISAPPROVAL) MUST BE ACCOMPLISHED WITHIN 30 DAYS FROM DATE OF RECEIPT.
PRODUCTION RADIOGRAPHY (PR) 135 DAYS AFTER APPROVAL OF RADIOGRAPHIC SHOOTING
SKETCHES.
REVIEW (APPROVAL/DISAPPROVAL) MUST BE ACCOMPLISHED WITHIN 30 DAYS FROM DATE OF RECEIPT.
Submission of all certification data CDRLs will be on or before 20 days prior to delivery. PNSY review/acceptance of certification CDRLs shall be 6 working days after receipt of certification DD 1423 CDRLs.
Final delivery of material will be on or before 600 days after the effective date of the contract.
4. The following clauses has been added:
WSSTERMEZ04, WSSTERMEZ07, WSSTERMLZ02, 252.246-7001, 252.227-7037, 252.227-7013, 252.227-7030,52.204-2, 52.204-21, and 52.246-26
5. The language in the following clauses has been updated:
WSSTERMBA00, 252.203-7005, and 52.211-8.
6. The hour and date specified for receipt of offers has been extended to
4:30PM EST on 23 December 2022.
THE FOLLOWING IS HEREBY INCORPORATED:
CONTRACT CLAUSE FOR PROTECTION OF NAVAL NUCLEAR PROPULSION INFORMATION
During the performance of this contract Naval Nuclear Propulsion Information(NNPI (NOFORN)) may be developed or used. Naval Nuclear Propulsion Informationis defined as that information and/or hardware concerning the design,arrangement, development, manufacturing,
testing, operation, administration,training, maintenance, and repair of the propulsion plants of Naval NuclearPowered Ships, including the associated shipboard and shore-based nuclearsupport facilities.
Appropriate safeguards must be proposed by the contractor, and approved by theContracting Officer for Security for the safeguarding from actual, potential,or inadvertent release by the contractor, or any subcontractor, of any NNPI(NOFORN) in any form, classified
or unclassified. Such safeguards shall ensure that only governmental and contractor parties, including subcontractors that have an established need-to-know, have access in order to perform work under this contract, and then only under conditions which assure that
the
information is properly protected. Access by foreign nationals or immigrant
aliens is not permitted. A foreign national or immigrant alien is defined as aperson not a United States citizen or a United States national. United States citizens representing a foreign government, foreign private interestsor other foreign nationals, are
considered to be foreign nationals for industrial security purposes and the purpose of this restriction.
In addition, any and all issue or release of such information beyond suchnecessary parties, whether or not ordered through an administrative or
judicial tribunal, shall be brought to the attention of the Contracting
Officer for Security.
The Contracting Officer for Security shall be immediately notified of anylitigation, subpoenas, or requests which either seek or may result in therelease of NNPI (NOFORN).In the event that a court or administrative order makes immediate review by the Contracting
Officer for Security impractical, the contractor agrees to take all necessary steps to notify the court or
administrative body of the Navy's interest in controlling the release of such information through review and concurrence in any release.
The Contracting Agency reserves the right to audit contractor facilities forcompliance with the above restrictions.
Exceptions to these requirements may only be obtained with prior approval fromthe Commander, Naval Sea Systems Command (SEA 09B2). Additional guidance may be obtained from NAVSEA Instruction 5511.32
1.This requirement is pursuant to the Special Emergency Procurement Authority (SEPA).
2.All contractual documents (i.e. contracts, purchase orders, task orders, delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the Government when copies are either deposited in the mail, transmitted by
facsimile, or sent by other electronic commerce methods such as email. The Government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein.
3.Partial and early delivery of requirement is authorized and desired and is at no additional cost to either the vendor or the Government.
4.This award will be issued bilaterally, requiring the contractor's written acceptance prior to execution.
5.This is a rated order certified for national defense use and the Contractor will follow all requirements of the Defense Priorities and Allocations System Regulation (15 CFR 700).
1. SCOPE
1.1 The material covered in this contract/purchase order will be used in a crucial shipboard system. The use of incorrect or defective material would create a high probability of failure resulting in serious personnel injury, loss of life, loss of vital
shipboard systems, or loss of the ship itself. Therefore, the material has been designated as SPECIAL EMPHASIS material (Level I, Scope of Certification, or Quality Assured) and special control procedures are invoked to ensure receipt of correct material.
2. APPLICABLE DOCUMENTS
2.1 Order of Precedence - In the event of a conflict between the text of this contract/purchase order and the references and/or drawings cited herein, the text of this contract/purchase order must take precedence. Nothing in this contract/purchase order,
however, must supersede applicable laws and regulations unless a specific exemption has been obtained.
2.2 Applicable Documents - The document(s) listed below form a part of this contract/purchase order including modifications or exclusions.
2.2.1 Specification Revisions - The specification revisions listed under "Documents References" below are the preferred revision. Older and/or newer r evisions are acceptable when listed within Contract Support Library Reference Number CSD155 in ECDS (Electric
Contractor Data Submission) at: ht tps://register.nslc.navy.mil/. This is to allow Contractors to use certain acceptable older specification revisions to purge their existing stock of material certified to those older revisions or to use newer specification
revisions when material is certified to newly released revisions,without requiring the submittal of waiver/deviation requests for each specification revision on every contract. Revisions of specifications reflecting editorial and/or re-approval (e.g. E2009,
R2014, etc.) are considered inconsequential, but are acceptable when their revisions are listedwithin CSD155 or elsewhere within this contract.
2.3 Identification of Classified Documents - This contract/purchase order requires the Contractor to have authorized access to classified documents in accordance with the attached Contract Security Classification Specification (DD Form 254).
The classified documents and security level are: ;830-6404016 - CONFIDENTIAL;
2.3.1 "Document References" listed below must be obtained by the Contractor. Ordering information is included as an attachment to this contract/purchase order.
2.3.2 Documents, drawings, and publications supplied are listed under "Drawing Number". These items should be retained until an award is made.
DRAWING DATA=4384678 |80064| C| |D|0001 | C|49998|1136401
DRAWING DATA=4384678C01 |53711| C|DN |D|0001 | C|49998|0067532
DRAWING DATA=4384678C01 |53711| C|DN |D|0002 | C|49998|0045081
DRAWING DATA=4384678C01 |53711| C|DN |D|0003 | C|49998|0030946
DRAWING DATA=4384678C04 |53711| C|DN |D|0001 | C|49998|0040252
DRAWING DATA=4384678C05 |53711| C|DN |D|0001 | C|49998|0033942
DRAWING DATA=4385050 |53711| C| |D|0001 | C|49998|0227949
DRAWING DATA=4385050 |53711| C| |D|0002 | C|49998|0305552
DRAWING DATA=4385050 |53711| C| |D|0003 | C|49998|0401935
DRAWING DATA=4385050 |53711| C| |D|0004 | C|49998|0334168
DRAWING DATA=4385050 |53711| C| |D|0005 | C|49998|0350929
DRAWING DATA=4385050 |53711| C| |D|0006 | C|49998|0250462
DRAWING DATA=4385050 |53711| C| |D|0007 | C|49998|0191986
DRAWING DATA=4385050 |53711| C| |D|0008 | C|49998|0314531
DRAWING DATA=4385050 |53711| C| |D|0009 | C|49998|0265988
DRAWING DATA=4385050 |53711| C| |D|0010 | C|49998|0210216
DRAWING DATA=4385050 |53711| C| |D|0011 | C|49998|0253021
DRAWING DATA=4385050 |53711| C| |D|0012 | C|49998|0254114
DRAWING DATA=4385050 |53711| C| |D|0013 | C|49998|0197208
DRAWING DATA=4385050 |53711| C| |D|0014 | C|49998|0253167
DRAWING DATA=4385050 |53711| C| |D|0015 | C|49998|0204941
DRAWING DATA=4385050 |53711| C| |D|0016 | C|49998|0233116
DRAWING DATA=4385050 |53711| C| |D|0017 | C|49998|0238680
DRAWING DATA=4385050 |53711| C| |D|0018 | C|49998|0098849
DRAWING DATA=4385050-C1 |53711| -|1N |D|0001 | -|49998|0040946
DRAWING DATA=4385050-C2 |53711| -|1N |D|0001 | -|49998|0040858
DRAWING DATA=4385050-C6 |53711| -|1N |D|0001 | -|49998|0045492
DRAWING DATA=4385050-C6 |53711| -|1N |D|0002 | -|49998|0017033
DRAWING DATA=6404016 |53711| B| |F|0001 | B|00026|0000000
DRAWING DATA=6408529 |53711| C| |D|0001 | C|49998|0471414
DRAWING DATA=6408529 |53711| C| |D|0001.A | C|49998|0332904
DRAWING DATA=6408529 |53711| C| |D|0001.B | C|49998|0345072
DRAWING DATA=6408529 |53711| C| |D|0002 | C|49998|0298556
DRAWING DATA=6408529 |53711| C| |D|0002.A | C|49998|0303003
DRAWING DATA=6408529 |53711| C| |D|0002.B | C|49998|0319148
DRAWING DATA=6408529 |53711| C| |D|0002.C | C|49998|0235527
DRAWING DATA=6408529 |53711| C| |D|0002.D | B|49998|0276389
DRAWING DATA=6408529 |53711| C| |D|0002.E | B|49998|0260935
DRAWING DATA=6408529 |53711| C| |D|0002.F | B|49998|0243303
DRAWING DATA=6408529 |53711| C| |D|0003 | C|49998|0270451
DRAWING DATA=6408529 |53711| C| |D|0003.A | C|49998|0288663
DRAWING DATA=6408529 |53711| C| |D|0003.B | C|49998|0307445
DRAWING DATA=6408529 |53711| C| |D|0003.C | C|49998|0292708
DRAWING DATA=6408529 |53711| C| |D|0003.D | C|49998|0299361
DRAWING DATA=6408529 |53711| C| |D|0003.E | C|49998|0281233
DRAWING DATA=6408529 |53711| C| |D|0003.F | C|49998|0334124
DRAWING DATA=6408529 |53711| C| |D|0003.G | C|49998|0313284
DRAWING DATA=6408529 |53711| C| |D|0003.H | C|49998|0300646
DRAWING DATA=6408529 |53711| C| |D|0003.J | C|49998|0279814
DRAWING DATA=6408529 |53711| C| |D|0003.K | C|49998|0297569
DRAWING DATA=6408529 |53711| C| |D|0003.L | C|49998|0289795
DRAWING DATA=6408529 |53711| C| |D|0004 | C|49998|0238167
DRAWING DATA=6408529 |53711| C| |D|0005 | A|49998|0142890
DRAWING DATA=6408529 |53711| C| |D|0006 | B|49998|0198379
DRAWING DATA=6408529 |53711| C| |D|0007 | A|49998|0157342
DRAWING DATA=6408529 |53711| C| |D|0008 | A|49998|0166003
DRAWING DATA=6408529 |53711| C| |D|0009 | B|49998|0203178
DRAWING DATA=6408529 |53711| C| |D|0010 | A|49998|0107019
DRAWING DATA=6408529 |53711| C| |D|0011 | C|49998|0192483
DRAWING DATA=6408529 |53711| C| |D|0012 | A|49998|0104270
DRAWING DATA=6408529 |53711| C| |D|0013 | A|49998|0099090
DRAWING DATA=6408529 |53711| C| |D|0014 | A|49998|0107926
DRAWING DATA=6408529 |53711| C| |D|0015 | C|49998|0204749
DRAWING DATA=6408529 |53711| C| |D|0016 | C|49998|0152364
DRAWING DATA=6408529C01 |53711| A|DN |D|0001 | A|49998|0040402
DRAWING DATA=6408529C01 |53711| A|DN |D|0002 | A|49998|0026463
DRAWING DATA=6408529C01 |53711| A|DN |D|0003 | A|49998|0053211
DRAWING DATA=6408529C01 |53711| A|DN |D|0003.A | A|49998|0053543
DRAWING DATA=6408529C01 |53711| A|DN |D|0003.B | A|49998|0053795
DRAWING DATA=6408529C01 |53711| A|DN |D|0003.C | A|49998|0052790
DRAWING DATA=6408529C01 |53711| A|DN |D|0003.D | A|49998|0044392
DRAWING DATA=6408529C01 |53711| A|DN |D|0004 | A|49998|0031013
DRAWING DATA=6408529C01 |53711| A|DN |D|0005 | A|49998|0045596
DRAWING DATA=6408529C01 |53711| A|DN |D|0006 | A|49998|0046378
DRAWING DATA=6408529C01 |53711| A|DN |D|0007 | A|49998|0032299
DRAWING DATA=6408529C01 |53711| A|DN |D|0008 | A|49998|0019877
DRAWING DATA=6408529C01 |53711| A|DN |D|0009 | A|49998|0020676
DRAWING DATA=6408529C01 |53711| A|DN |D|0010 | A|49998|0020385
DRAWING DATA=6408529C01 |53711| A|DN |D|0011 | A|49998|0019488
DRAWING DATA=6408529C01 |53711| A|DN |D|0012 | A|49998|0025664
DOCUMENT REF DATA=FED-STD-H28 | | |B |190424|A| | |
DOCUMENT REF DATA=FED-STD-H28 |0020| |B |941221|A| |01|
DOCUMENT REF DATA=ANSI/ASQ Z1.4 | | | |080101|A| | |
DOCUMENT REF DATA=ASTM-B139 | | | |121001|A| | |
DOCUMENT REF DATA=QQ-N-281 | | |D |851023|A| 2| |
DOCUMENT REF DATA=QQ-N-286 | | |G |001207|A| | |
DOCUMENT REF DATA=ASTM-B367 | | | |130701|A| | |
DOCUMENT REF DATA=ASTM-B369 | | | |200401|A| | |
DOCUMENT REF DATA=MIL-STD-792 | | |F |060519|A| | |
DOCUMENT REF DATA=MIL-DTL-1222 | | |J |001208|A| | |
DOCUMENT REF DATA=ASTM-E1417 | | | |160615|A| | |
DOCUMENT REF DATA=ASTM-E1444 | | | |160601|A| | |
DOCUMENT REF DATA=MIL-STD-2035 | | |A |950515|A| | |
DOCUMENT REF DATA=SAE AMS 2631 | | |E |171201|A| | |
DOCUMENT REF DATA=ASTM-D4066 | | |A |010810|A| | |
DOCUMENT REF DATA=ASTM-D6456 | | | |100801|A| | |
DOCUMENT REF DATA=SAE AMS 6931 | | | |130701|A| | |
DOCUMENT REF DATA=SAE AMS 6931 | | |D |171201|A| | |
DOCUMENT REF DATA=ISO_9001 | | | |081115|A| | |
DOCUMENT REF DATA=ISO10012 | | | |030415|A| | |
DOCUMENT REF DATA=MIL-DTL-15024 | | |G |180303|A| | |
DOCUMENT REF DATA=ISO/IEC 17025 | | | |050515|A| | |
DOCUMENT REF DATA=MIL-N-25027 |0001| |A |990331|A| 1| |
DOCUMENT REF DATA=QPL 25027 | | |17 |000207|A| | |
DOCUMENT REF DATA=MIL-DTL-32258 | | | |210601|A|2 | |
DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| |
DOCUMENT REF DATA=MIL-STD-45662 | | |A |880801|A| | |
DOCUMENT REF DATA=A-A-50433 | | | |890815|A| | |
DOCUMENT REF DATA=A-A-59004 | | |A |950907|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.1 | | |B |181118|A| | |
DOCUMENT REF DATA=ANSI/NCSL Z540.3 | | | |130326|A| | |
DOCUMENT REF DATA=AIA/NAS NASM 25027 | | |1 |121221|A| | |
DOCUMENT REF DATA=S9074-AQ-GIB-010/248 | | |1 |191112|A| | |
DOCUMENT REF DATA=T9074-AS-GIB-010/271 | | |1 |140911|A| | |
DOCUMENT REF DATA=S9074-AR-GIB-010A/278 (CHG A) | | | |130214|A| | |
3. REQUIREMENTS
3.1 ;The complete 1 1/2 Inch Combination Hull and Backup Ball Valve must be in accordance with Naval Sea Systems Command drawing 6408529 Assembly 98 with DRN 6408529C01; Naval Ship Systems Command drawing 4385050 with DRNs 4385050-C1, 4385050-C2, and
4385050-C6; and Naval Ship Systems Command drawing 4384678 with DRNs 4384678C01, 4384678C04, and 4384678C05, except as amplified or modified herein. Less actuator, find 96 and hull fasteners, finds 69 and 70.;
3.1.1 ;Bolt holes on mounting flange(s) and dowel pin holes for actuator locating must not be drilled.;
3.1.2 ;All actuator associated mounting parts must be supplied in a bag attached to the valve.;
3.2 Material for Parts Requiring Certification - Quantitative chemical and mechanical analysis is required for the parts listed below unless specifically stated otherwise:
Part - ;Body, find 72-S1 and Tailpiece, find 76-S1;
Material - ;ASTM-B369, Alloy UNS 96400;
Part - ;Stems, find 14 and find 15;
Material - ;QQ-N-286, Alloy UNS N05500, Form 2, Hot Finished or Cold Drawn Annealed and Age Hardened;
Part - ;Continuous Threaded Studs, find 62;
Material - ;MIL-DTL-1222, Type IV, QQ-N-286, Alloy UNS N05500, Annealed and Age Hardened and Marked .K.;
PART - ;Self-locking Heavy Hex Nuts, find 43;
MATERIAL - QQ-N-281, Class A or B, with chemical composition in accordance with MIL-DTL-32258.
NOTE: All material must be the same Class.
SELF-LOCKING ELEMENT - For 250 degree nuts use ASTM-D6456, Type 1 or ASTM-D4066, Group 01, Class 1 or 2, Grade 1, 2, 3, 4, 5,or 6. For 450 degree nuts use ASTM-D6456, Type 1.
Part - ;Nuts, Stem Retaining find 10 and find 12;
Material - ;ASTM-B139 UNS C51000 Temper H04;
Part - ;Insert (Q3), find 68-S1;
Material - ;QQ-N-281, Class A, Form 1, Hot finished or Cold drawn, Annealed;
Part - ;Straight Ball, find 7 and Angle Ball, find 8;
Material - SAE-AMS-6931
OR
Centrifugally cast 6AL-4V, ASTM-B367, Grade C-5, with mechanical properties as listed in supplementary Requirement S6.
Note: Mechanical properties for bars, forgings and forging stock over 10" must be as specified in the applicable drawing. If the mechanical properties are not provided in the drawing, the mechanical properties specified in SAE-AMS-6931 Table 2 for material 6"
to 10", must be applied.
Part - ;Seats (Q3), find 9;
Material - MD71-GG Mearthane (Graphite Filled Urethane). Material must be manufactured by Mearthane Products Inc. Cranston, RI. (Properties Specified Below Only)
ITEM PROPERTY ASTM TEST METHOD VALUE
(A) Hardness D2240 70 +/- 5 Shore D
(B) Specific Gravity D792 1.18 +/- 0.02
(C) Tensile Strength D412 (DIEC) 5000 PSI MIN
(D) Compression-Defl D575 700 PSI MIN @ 2% DEF.
(E) Tensile Impact D1822 300 FT-LB/SQ IN
(Note 1) (TYPE L SPECIMEN)
(F) Water Absorption D570 1.5% MAX
(1 Week at R.T.)
Note 1: These values are minimum averages. Separate specimen values may not vary more than 25% under the specified minimum.
3.3 Testing Certification - Certifications are required for the following tests on the items listed below. Additional testing on other piece parts (if any) per applicable drawings is still required, but certifications are only required as listed below.
Test - ;Liquid Penetrant Inspection;
Item - ;Continuous Threaded Studs, find 62;
Performance - T9074-AS-GIB-010/271; Sampling must be per MIL-DTL-1222
Acceptance - MIL-DTL-1222
Test - ;Dye Penetrant Inspection for Non-Magnetic Grades;
Item - ;Nut, Heavy Hex, find 43;
Performance - T9074-AS-GIB-010/271 or ASTM-E1417/ASTM-E1444
(Method C solvent removal techniques must not be used on thread)
Acceptance - ;NASM25027 with sampling in accordance with MIL-DTL-32258;
Test - ;Ultrasonic Inspection on Starting Material;
Item - ;Straight Ball, find 7 and Angle Ball, find 8 (If Starting Material per SAE-AMS-6931);
Performance - ;SAE-AMS-6931 and SAE-AMS-2631;
Acceptance - ;SAE-AMS-2631;
Test - Weldability Test of ASTM-B369 material
Item - ;Body, find 72-S1 and Tailpiece, find 76-S1;
Performance - ASTM-B369
Acceptance - ASTM-B369
Test - ;Dye Penetrant Inspection;
Item - ;Tailpiece Weld Ends in final machined condition including 1/2" of base material;
Performance - ;T9074-AS-GIB-010/271;
Acceptance - ;S9074-AR-GIB-010/278;
Test - ;Production Test;
Item - ;Each Assembly;
Performance - ;General Note 18 of Drawing 6408529;
Acceptance - ;General Note 18 of Drawing 6408529;
Test - Quality Conformance Tests
Item - Self-Locking Nuts
Performance - ;NASM25027 and MIL-DTL-32258;
Acceptance - ;NASM25027 and MIL-DTL-32258;
Attribute - Certificate of Completion
Item - Self-Locking Nut Nonmetallic Insert
Performance - ;ASTM-D4066, Group 01, Class 1 or 2;
Attribute - Certificate of Compliance
Item - Self-Locking Nuts
Performance - This Certificate must state that self-locking nuts were manufactured by an approved source. Approved sources are those listed on QPL-25027 for the appropriate fastener. This QPL may also be considered as approved sources for Heavy Hex
self-locking nuts.
Attribute - Annealing and Age Hardening
Item - ;Stems, find 14 and find 15 and Continuous Threaded Studs, find 62;
Performance - QQ-N-286
3.4 Radiography is required on ;Body, find 72-S1 and Tailpiece, find 76-S1; .
3.5 Thread Inspection Requirements - All threads on threaded parts must be inspected using appropriate inspection methods, inspection systems, and inspection gages/instruments in accordance with FED-STD-H28 series. Substitution of thecommercial equivalent
inspection in accordance with ASME B1 series is acceptable.
3.5.1 System 21 of FED-STD-H28/20 must be used as a minimum inspection requirement for threads when the design drawing or design specification does not specify an inspection requirement.
3.5.2 For Navy and Shipyard drawings, system 21 of FED-STD-H28/20 may be substituted for System 22 without further Navy approval when the design drawing invokes System 22 and does not cite governing specifications that specifically require system 22. System 22
of FED-STD-H28/20 must be used when the drawing references other governing specifications that specifically require System 22, such as certain thread types of MIL-DTL-1222.
3.5.3 A written request for concurrence must be submitted when utilizing alternative measuring equipment or measuring systems not applicable to the specified inspection system.
3.6 Confidential Hydrostatic Test Pressures - When test pressures are confidential, certification must reference ;830-6404016, Rev B; and the item number to which the item was tested in lieu of the actual pressures. Any drawing requirement to mark the
working pressure on the item does not apply and is strictly prohibited.
3.7 Dupont Teflon Coating 850G-204 and 852G-201. Use of Dupont Teflon Coating 851N-204 and 852N-201 is acceptable until exhausted - Teflon coating of ball(s) must be in accordance with general note ;4.F.; of drawing ;803-4384678; .
3.7.1 ;Naval Ordinance Systems Command OD 10362 First Revision dated 15 Aug 1961 is provided by Contract Support Library Reference Number CSD018.;
3.7.2 CSD099 provides guidance for acceptance/rejection of teflon-coated valve balls after valve assembly production testing.
3.8 Contract Support Library - Additional requirements for this item are identified as Contract Support Library Reference Number ;CSD099, CSD018; in ECDS at https://register.nslc.navy.mil/
3.9 Lubrication:
For drawing 4384678, grease per CID A-A-50433 must be used in lieu of DOD-G-24508, MIL-G-24139 or MIL-PRF-24139.
3.10 Slow Strain Rate Tensile Test Laboratories - The Slow Strain Rate Tensile Test of QQ-N-286 must be performed by one of the following laboratories:
Huntington Alloys, a Special Metals Company
Attn: Bill Bolenr
3200 Riverside Drive
Huntington, WV 257059
Phone: (304) 526-5889
FAX: (304) 526-5973
Metallurgical Consultants, Inc.
Attn: W. M. Buehler
4820 Caroline
PO Box 88046
Houston, TX 77288-0046
Phone: (713) 526-6351
FAX: (713) 526-2964
Naval Surface Warfare Center, Carderock Division
Attn: Eric Focht Code 614
9500 Macarthur Blvd
West Bethesda, MD 20817-5700
Phone: (301) 227-5032
FAX: (301) 227-5576
Teledyne Allvac
Attn: Dr. W. D. Cao
2020 Ashcraft Ave.
Monroe, NC 28110
Phone: (704) 289-4511
FAX: (704) 289-4269
Westmoreland Mechanical Testing and Research Inc.
Attn: Andrew Wisniewski
P.O. Box 388
Youngstown, PA 15696-0388
Mannesmann Rohrenwerke
Mannesmann Forschungsinstitut (MFI)
Attn: Dr. Weiss
Postfach 251160
47251 Duisburg
Germany
Phone: 011-49-0203-9993194
FAX: 011-49-0203-9994415
ThyssenKrupp VDM USA, Inc.
Attn: D. C. Agarwal
11210 Steeplecrest Drive, Suite 120
Houston, TX 77065-4939
Phone: (281) 955-6683
3.11 Seat Stack Height Measurement - To ensure that each seat is within tolerance, check each seat singularly by measuring the seat height over the ball. This measurement is calculated by adding one-half ball diameter to the half stack height dimension on
the drawing. Limits are determined by the ball diameter tolerance and the half stack height tolerance. Check dimensions by measuring from the seat back face to top of ball. Manufacturers of seats that do not have a ball of the required size available will be
required to manufacture a dummy ball or segment of a ball with sufficient spherical surface to check the above dimension.
3.12 O-ring grooves and mating sealing surfaces must be inspected per the contractually invoked drawings or specifications. When the drawings or specifications do not provide specific defect criteria or state that no defects are allowed, the General
Acceptance Criteria (GAC) standard must be used for inspecting O-ring grooves and mating sealing surfaces only. Repairs to sealing surfaces and O-ring grooves with unacceptable defects may be accomplished within the limits of the size and tolerances provided
in the applicable drawing. Repairs thatwould exceed these limits require approval (including final dimensions). The data that is red lined (crossed out) is excluded from the GAC for this contract and is not to be used for acceptance or rejection criteria.
The GAC document is identified as Contract Support Library Reference Number CSD008 at https://register.nslc.navy.mil/
3.13 Specification Change - For QQ-N-281, Class B material:
1 - Footnote 9 to Table II of QQ-N-281 does not apply.
2 - When starting material is Round Bar greater than 3" dia,
the mechanical properties of Hex Bar apply.
3.14 K-MONEL Fasteners - Material must be heat treated per QQ-N-286.
3.14.1 Fasteners that have been hot or cold headed or roll threaded must be solution annealed followed by age hardening subsequent to all heading and thread rolling operations. The mechanical properties on certifications must be actual properties of the
annealed and age hardened material and must meet the requirements of QQ-N-286.
3.14.2 QQ-N-286 fasteners that have been headed and/or roll threaded must not beage hardened unless the material has been solution annealed subsequent to the heading and threading operations. Threads formed after the final age hardening heat treatment must be
cut or ground only.
3.15 K-MONEL Fasteners - K-MONEL externally threaded fasteners must have mechanical properties determined in accordance with MIL-DTL-1222. Test results must include Tensile, Yield, Elongation and Hardness as required by MIL-DTL-1222. (The Hardness tests must
be performed on a full size fastener.)
3.15.1 Studs require an Axial Tensile test in accordance with MIL-DTL-1222.
3.15.2 Headed fasteners require a Wedge Tensile test as specified elsewhere in this contract/purchase order.
3.16 Internal Threads - All internal threads must be formed by cutting. Cold forming of internal threads is not acceptable.
3.17 Thread Lubricant - Thread lubricants containing molybdenum disulfide must not be used on this material. Bacteria in water, especially seawater, causes molybdenum disulfide to break down. The by-products of the breakdown form compounds which attack the
fasteners. Anti-galling compound A-A-59004 must be used as a replacement when thread lubricant is required for assembly.
3.18 Component Identification Description (CID) - When applicable drawing(s) and/or specification(s) specify that a nameplate or identification plate is required, the CID number ( ;CID 884305963; ) must be added. When no plate is specified, an identification
plate in accordance with MIL-DTL-15024, Type "C" on brass or Type "H" on aluminum must be securely attached to each assembly showing the above CID number. No assembly must be shipped without the CID number attached.
3.19 Welding or Brazing - When welding, brazing, and allied processes are required, as invoked by Section C paragraph 3 requirements, they must be in accordance with S9074-AR-GIB-010A/278, (S9074-AQ-GIB-010/248 for brazing) by personnel and procedures
qualified under S9074-AQ-GIB-010/248 for all production and repair welding and brazing. Procedures and Qualification Data must be submitted for review and approval prior to performing any welding or brazing.
3.20 The pressure tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure tolerances are not provided by drawings, specifications or specified elsewhere in this contract, the
following must be used:
For pressure tests below 100 PSIG, the pressure tolerance must be +1 PSIG/-0PSIG.
For pressure tests at or above 100 PSIG up to and including 2500 PSIG, the pressure tolerance must be +2% / -0 PSIG rounded off to the nearest multiple of thesmallest graduation on an analog test pressure gauge, not to exceed 50 PSIG.
30 minutes / - 0 minutes. above 2500 PSIG, the pressure tolerance must be +2%/-0 PSIG, rounded off to the nearest multiple of the smallest graduation on an analog test pressure gauge, not to exceed 200 PSIG.
The pressure test time tolerance must be as specified in the assembly drawing, detail drawing, design specification or elsewhere in this contract. Where pressure test time tolerances are not provided by drawings, specifications or specified elsewhere in
this contract, the following must be used:
For a test duration up to and including 1 hour, the tolerance must be +5 minutes / - 0 minutes.
For a test duration of more than 1 hour up to and including 24 hours, the tolerance must be +30 minutes / - 0 minutes.
For a test duration of more than 24 hours, the tolerance must be + 60 minutes/- 0 minutes.
3.21 Configuration Control - The Contractor must maintain the total equipment baseline configuration. For items of proprietary design, Contractor drawings showing the latest assembly configuration must be provided to the Government in electronic (C4) format.
Definitions are provided elsewhere in the Contract/Purchase Order.
3.21.1 Waivers/Deviations - All waivers and deviations, regardless of significance or classification require review and approval by the Contracting Officer. Waivers and Deviations must be designated as Critical, Major, or Minor. The Contractor must provide
a copy of this request to the QAR. Requests must include the information listed below.
a. A complete description of the contract requirement affected
and the nature of the waiver/deviation (non-conformance),
including a classification of Critical, Major, or Minor.
b. Number of units (and serial/lot numbers) to be delivered in this
configuration.
c. Any impacts to logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel or impacts to the operational use of the product.
d. Information about remedial action being taken to prevent reoccurrence
of the non-conformance.
3.21.2 All requests for Waivers/Deviations on NAVSUP-WSS Contracts must be submitted using the ECDS (Electronic Contractor Data Submission) system at https://register.nslc.navy.mil/
3.21.3 ECPs - The Government will maintain configuration control and change authority for all modifications or changes affecting form, fit, function, or interface parameters of the Equipment and its sub-assemblies. The Contractor must submit an Engineering
Change Proposal (ECP) for any Class I or II changes that impact the Equipment covered by this contract. ECPs must be prepared in Contractor format, and must include the following information:
a. The change priority, change classification (Class I or Class II),
and change justification.
b. A complete description of the change to be made and the need for
that change.
c. A complete listing of other Configuration Items impacted by the
proposed change and a description of the impact on those CIs.
d. Proposed changes to documents controlled by the Government.
e. Proposed serial/lot number effectivities of units to be
produced in, or retrofitted to, the proposed configuration.
f. Recommendations about the way a retrofit should be accomplished.
g. Impacts to any logistics support elements (such as software,
manuals, spares, tools, and similar) being utilized by Government
personnel in support of the product.
h. Impacts to the operational use of the product.
i. Complete estimated life-cycle cost impact of the proposed change.
j. Milestones relating to the processing and implementation of the
engineering change.
3.22 Certificate of Compliance - (SPECIAL EMPHASIS MATERIAL) The Contractor must prepare and submit a certificate of compliance certifying that the items/components furnished under this contract comply with the requirements of the procurement document,
including any/all invoked specifications and drawings.
3.23 Mercury Free - Mercury and mercury containing compounds must not be intentionally added or come in direct contact with hardware or supplies furnished under this contract. Mercury contamination of the material will be cause for rejection.
3.24 NAVSEA 0948-LP-045-7010 - Any applicable requirements of NAVSHIPS 4410.17,NAVSEA 0948-LP-045-7010, or 0948-045-7010 which the contractor must meet are included in this contract/purchase order. The above documents are for GovernmentUse Only. Further
application of the above documents is prohibited.prohibited.
3.24.1 Marking of material with a Material Designator per the Drawing is also prohibited, with the exception of Fasteners. Fasteners must be marked with a Material Symbol/Designator as specified elsewhere in this contract.
^ QUALITY ASSURANCE REQUIREMENTS ^
3.25 See CDRL DI-MISC-80678 (Test Certification) - A statement of tests performed, listing the pieces tested must be furnished along with a copy of the test results. Certification must include the contractor's name, address and date, quantity inspected,
identified to the contract/purchase order and item number, and the Contractor's or authorized personnel's signature. Test certifications must reference the standard/specification, including the revision, to which the testing was performed and the acceptance
criteria used. Test procedure numbers may also be referenced on test reports. Test reports on weldments must be identified to weld joint and layer.
3.26 Welding Requirements - When production or repair welding is required, the applicable welding procedure(s) and qualification data must be submitted for review and approval. In addition, the CONSUMED WELD METAL C of C as defined below must be submitted as
part of the certification OQE package submitted by the Contractor.
Note: These requirements do not apply to tack/spot welds.
3.26.1 Approval of the Contractor's qualification data must be obtained prior to performing any welding (production or repair).
3.26.2 If the Contractors qualification data has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the procedures and qualification data report to expedite the approval process. The
approval letter must reference the applicable welding procedure and qualification data report identification/number. Prior approval does not guarantee acceptance for this or any future contracts. As far as practical, all procedures for the contract must be
submitted at the same time. Welding procedures and qualification data must be submitted in a commercially available electronic format such as Adobe Acrobat PDF. The contractor must state the applicability of each weld procedure and qualification data submitted,
citing the drawing number and pieces to be welded. (i.e. ''WP-123 and QD-123 are submitted for the weld joint between pieces 1 and 2 on drawing ABC'.' WP-456 and QD-456 are submitted for the hardfacing of piece 3 on drawing XYZ'')
3.26.3 The PCO's authorization for the use of weld procedure(s) and qualification data for the specific application as submitted does not mitigate the vendors responsibility to comply with the requirements of S9074-AQ-GIB-010, S9074-AR-GIB-010A/278,248d the
contract.
3.26.4 Authority for the repair of Special Repairs in castings, the repair of wrought material, or the repair of forged material must be obtained via request for waiver from the Procurement Contracting Officer. This request must describe the defect; including
size, depth, location, and a description of the proposed repair. Repairs deemed minor or nominal in accordance with S9074-AR-GIB-010/278 can be made at contractor discretion in accordance with S9074-AR-GIB-010/278 requirements; however, Weld Procedure
Specification (WPS) and Procedure Qualification Record (PQR) submittals are still required. This request for NAVSUP-WSS Contracts must be submitted via the Electronic Contractor Data Submission (ECDS) application.
3.26.5 Any new procedure qualification performed under this Contract will require the vendor to provide a minimum 72 hour notification to DCMA with an offer to observe the welding of the test assemblies. The 72 hour time limit may be modified upon mutual
agreement between the vendor and DCMA.
3.26.6 When drawings require hardfacing surface Iron or Nickel content not to exceed 5%, the contractor must verify surface Iron or Nickel content by performing chemical testing as defined by the applicable drawing. The chemical test results must be submitted
as part of the qualification data.
3.26.7 Additional qualification requirements for production hardfacing thickness less than 1/8-inch: Macro-etch (or legible photomacrographs clearly showing the fusion area) must be submitted for review and show consistent, minimized dilution. All essential
elements and any elements not listed in S9074-AQ-GIB-010/248 that influence dilution must be in the qualification data and weld procedure, with strict limits placed on each essential element.
3.26.8 Preparation and retention of weld records is required, as specified by paragraph 4.1.3 of S9074-AR-GIB-010A/278.
3.26.9 When production or repair welding is required on titanium materials, theapplicable fabrication plan, facilities procedure, training plan, and active welder qualification must also be submitted for review and approval.
3.26.10 If the contractor's fabrication plan, facilities procedure, training plan, or active welder qualification has previously been approved by the Navy for other contracts, a copy of the original approval letter may be submitted along with the applicable
documentation to expedite the approval process. The approval letter must reference the applicable documentation. Prior approval does not guarantee acceptance for this or any future contracts. The contractor's fabrication plan, facilities procedure, training
plan, and active welder qualification must be submitted at the same time as the applicable welding procedure(s) and weld procedure qualification data. All documentation must be submitted in a commercially available electronic format, such as Adobe Acrobat PDF.
3.26.11 A Certificate of Compliance is required for all weld filler metals used for production or repair welding, and must include the following:
a) Filler Metal LOT number(s)
b) Specification and Type
c) A positive statement that the vendor has obtained OQE and verified that each LOT of weld filler material conforms to specification requirements.
d) A positive statement verifying that the weld filler metals were the correct material type or grade prior to consumption.
3.26.12 When production welds or repair welds are performed by a subcontractor, the requirement for submission of all certification documentation required herein must be passed down to the subcontractor.
3.27 Radiography (RT) - Radiography must be performed in accordance with T9074-AS-GIB-010/271. RT acceptable criteria for castings to be criticality level I per the applicable table of S9074-AR-GIB-010A/278. RT acceptance criteria for weldments to be per the
applicable table of S9074-AR-GIB-010A/278 (P-1 piping) or MIL-STD-2035, class 1, as applicable.
3.27.1 See CDRL DI-MISC-80678 (RSS) - The Contractor or activity performing the radiography must be responsible for preparing the radiographic shooting sketches (RSS) in accordance with T9074-AS-GIB-010/271. Shooting sketch approval is not required for
radiography of weldments. The radiographic standard shooting sketches (RSSS) referenced on the applicable drawing may be used, however, since T9074-AS-GIB-010/271 permits a variety of processes, the RSSS may not be applicable as they will not necessarily depend
only on the coverage requirements, but also on the equipment and procedures of the particular radiographic facility. Approval of these shooting sketches or radiographic standard shooting sketches is required per S9074-AR-GIB-010A/278. If this data has been
previously approved by a Navy activity, the original approval letter must be submitted at the same time as RT film and reader sheet submittal.
3.27.2 All pieces radiographed must be permanently marked with "RT" and a unique RT serial number. (The unique RT serial number must be directly traceable to the RT film.)
3.27.3 See CDRL DI-MISC-80678 (Production Radiography) - Production Radiography requires final acceptance by the Navy. The items listed below must be submitted for final acceptance, cataloging, file, and retention. They must be submitted and approved prior to
shipment of the applicable hardware. However, when the source certification clause is invoked, they must be submitted a minimum of forty-five (45) working days prior to the date of source certification inspection.
(a) Film
(b) RSS/RSSS
(c) RS (Reader Sheets)
(d) Documentation record listing the part number, heat/lot traceability, and theunique RT serial number (which is traceable to the RT film and reader sheet)
3.28 Quality System Requirements - The Contractor furnishing items under this contract/purchase order must provide and maintain a quality system in accordance with ISO-9001 as amplified or modified herein, with the calibration system requirements of ISO-10012
or ANSI-Z540.3 with ISO-17025. A Quality System in accordance with MIL-I-45208, with the calibration system requirements of MIL-STD-45662, is acceptable as an alternate.
3.28.1 The Contractor's quality system and products supplied under the system are subject to evaluation, verification inspection, and acceptance/non-acceptance by the Government representative to determine the system's effectiveness in meeting the quality
requirements established in the Contract/Purchase Order.
3.28.2 The Contractor's quality system must be documented and must be available for review by the Contracting Officer or his representative prior to initiation of production and throughout the life of the contract. The Prime Contractor must, upon
notification, make his facilities available for audit by the contracting Officer or his authorized representative.
3.28.3 See CDRL DI-QCIC-81110 (Inspection System Procedures) - All suppliers of Level I/SUBSAFE (LI/SS) material are required to submit a copy of their current documented quality system procedures to the Procurement Contracting Officer (PCO) prior to award of
any contract/purchase order. Suppliers that have a copy of their current quality system procedures on file at the Procuring Activity may request the PCO waive this requirement.
3.28.4 This contract provides for the performance of Government Quality Assurance at source. The place or places of performance may not be changed without the authorization of the Procurement Contracting Officer. Upon receipt of this order, promptly
notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest Defense Contract Management Agency
(DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately.
3.28.5 Any changes made by the Contractor to a qualified quality system will require re-submittal to the PCO and concurrence by the Government Quality Assurance Representative prior to adoption.
3.29 Contractor Inspection Requirements - The Contractor must maintain adequate records of all inspections and tests. The records must indicate the nature and number of observations made, the number and type of deficiencies found, the quantities approved and
rejected and the nature of corrective action taken as appropriate. Inspection records must be traceable to the material inspected.
3.29.1 The supplier's gages, measuring and test equipment must be made available for use by the Government representative when required to determine conformance with Contract requirements. When conditions warrant, the supplier's personnel must be made
available for operations of such devices
and for verification of their accuracy and condition.
3.29.2 All documents and reference data applicable to this contract must be available for review by the Government representative. Copies of documents required for Government inspection purposes must be furnished in accordance with the instructions provided
by the Government representative.
3.30 Subcontractor Inspection Requirements - The Government has the right to inspect at source, any supplies or services that were not manufactured or performed within the contractor's facility. Such inspection can only be requested by or under authorization
of the Government representative. Any purchasing documents to a subcontractor must cite the applicable portions of the contractually invoked quality system (e.g. calibration requirements), plus any product requirements that apply to the supplies being
purchased. When the Government elects to perform source inspection at the subcontractor's facility, applicable purchase documents must be annotated with the following statement: "A Government inspection is required prior to shipment from your plant. Upon
receipt of this order, promptly notify the Government representative who normally services your plant so that appropriate planning for Government inspection can be accomplished. If you do not have an assigned Government representative, notify the nearest
Defense Contract Management Agency (DCMA) Office. In the event that a local Government representative or DCMA Office cannot be located, our purchasing agent should be notified immediately."
3.31 The prime contractor's program must include procedures to assess the capability of the prospective suppliers to produce the products or supply the services in accordance with the contract, prior to the issuance of any purchase document.
3.31.1 Each sub-tier supplier of material or services for items in Section 3 of this contract must be subjected to a periodic review or audit by the Prime to determine the continued capability of the supplier to control the quality of the products or services
specified in the purchase order or contract.
3.31.2 The prime contractor must ensure that the purchased product conforms to specified purchase requirements and this contract. The type and extent of control applied to the supplier and the purchased product must be dependent upon the effect of the
purchased product on the end item represented by this contract.
3.31.3 The prime contractor must evaluate the requirements of the contract and select suppliers based on their ability to supply the product in accordance with the prime contractor's requirements and the contract. Criteria for selection and evaluation must
be established. Records of this effort must be available for review by the government.
3.31.4 The prime contractor's supplier quality assurance program must provide for a review of purchase documents to assure applicable quality requirements are included or referenced in the documentation for compliance by the supplier.
3.32 Government Furnished Material and/or Equipment (GFM/GFE) - When material or equipment is furnished by the Government, the Contractor must develop documented control procedures that require at least the following:
3.32.1 Visual examination upon receipt to detect damage during transit.
3.32.2 Inspection for completeness and proper type.
3.32.3 Verification of material quality received.
3.32.4 Periodic inspection and precautions to assure adequate storage conditions and to guard against damage from handling and deterioration during storage.
3.32.5 Functional testing, either prior to or after installation, or both, as required by the Contract to determine satisfactory operation.
3.32.6 Identification and protection from improper use or disposition.
3.32.7 Reporting to the Government, any GFM or GFE property found damaged, malfunctioning, or otherwise unsuitable for use. In the event of damage or malfunction during or after installation, the supplier must determine and record probable cause and
necessity for withholding the material from use.
3.32.8 For GFE material, and as required by the terms of the bailment agreement, the supplier must establish procedures for adequate storage, maintenance, and inspection of bailed Government material. Records of all inspection and maintenance performed on
bailed property must be maintained.
3.32.9 Material returned to the contractor must be handled as GFM.
3.33 Traceability and Certification Requirements - To assure that correct materials are installed in Level I/SUBSAFE systems, it is imperative that traceability be maintained from the material to the material certification test report and other required
Objective Quality Evidence (OQE). The material certification report must completely and accurately reflect that the material supplied meets the specified requirements. Materials requiring Traceability and Certification Data are identified within Paragraph 3,
Section C of this contract/purchase order.
3.33.1 The following provides the minimum requirements for maintaining material traceability and supplements the requirements specified in DI-MISC-81020 and elsewhere in the contract/purchase order. The Contractor must develop written procedures that
implement the material control requirements stated herein.
3.34 Material Traceability - The certification data report must be identified through a unique traceability number, heat-lot number, or heat-treat number for metallic material or batch of non-metallic material, as applicable, which must also be marked on the
material. This traceability marking on the material must provide direct traceability to the material's chemical composition and mechanical properties certification data. For material produced by batch, continuous cast, or continuous pour processes, samples
must be taken no less than once in every eight hours of operation for the purpose of validating proper chemical composition and mechanical properties. Traceability must be maintained through all process operations including any subcontracted operations, to the
finished component.
3.34.1 Material Marking for Traceability and Identification - The following are the minimum marking requirements. Additional/alternate marking requirements, if applicable, will be specified elsewhere in the contract/purchase order. In addition to the
marking requirements on applicable drawings and/or specifications, marking for traceability is required. All traceability markings must be permanently applied in accordance with MIL-STD-792 (except as specified below). An alternate marking method is
permissible provided it is an available option in the contractually invoked specification or drawing, except in instances where the material has been modified by this contract/purchase order and differs from that specified in the specification or drawing.
3.34.2 Traceability markings for items with precision machined or plated surfaces, or material with suitable marking surface areas less than 3/8 inches square (either 3/8" x 3/8" or an area equal to 0.1406 inches square) must be applied to a durable tag and
the tag securely affixed to the material.
3.34.3 Permanent marking must be legible and must be located so as to not affect the form, fit, and function of the material. ;Marking area to be as shown on drawing. Self-Locking Hex Nuts to be marked on the hex flats. Ball must be marked in the waterway
and Seats to be marked on the outer cylindrical surface.;
3.34.4 Seat Marking - Each seat must be permanently marked in accordance with MIL-STD-792, type I and as stated below, except for Teflon seats, which must only be tagged. Type IX marking may be substituted for type I, provided the minimum character size
scribed by the marking tool must be approximately 3/32 inch high to insure legibility. Permanent marking is not permitted on Teflon seats.
Seat marking requirements must maintain complete traceability to certification OQE. Seat marking must be either heat/lot or batch number, a vendor traceability number/code, or a combination thereof and must be unique to the material certification.
3.34.5 Traceability markings must be maintained through assembly, and whenever possible must be visible after assembly. For items where the marking is not visible after assembly, a durable tag must be securely attached to the item identifying the part
number, piece number, traceability number, and the location of the permanent mark.
3.35 See CDRL-DI-MISC-81020 (Chemical and Mechanical) and CDRL DI-MISC-80678 (SEAT MATERIAL) - Material Certifications - The following material certification requirements apply:
3.35.1 Metallic Material - Quantitative chemical and mechanical analysis of material traceable to traceability markings is required. Material certification test reports must include the class, form, condition, grade, type, finish, and/or composition, as
applicable, of the material supplied.
3.35.2 Non-Metallic Material - The Contractor must furnish the applicable test reports for each heat/lot/batch of seat material. Material certification test reports must include, in addition to the specification, the class, form, grade, type, process, and/or
composition, as applicable, of the material supplied.
3.35.3 Re-identification and re-certification of metallic material is required when the material is subjected to a process which alters its properties. If the starting material or raw stock is processed in a manner that will not affect its chemical
composition or mechanical properties, the original certifications for the chemical composition and mechanical properties, as required by the material specification, are acceptable. Re-certification of the chemical or mechanical properties is required if a
process is used during fabrication that alters the original properties of the material (e.g. alloying, heat treating, or forming). In these instances, the properties of the material must be re-determined and documented to reflect the altered condition. The
altered material must be uniquely re-identified. The properties thus determined and documented, are required for final certification and must conform to the material specification or the contract/purchase order requirements. When only the mechanical properties
are altered, the original certification forchemical composition must be overstamped and annotated with the unique traceability marking used with the altered material and at a minimum contain the information below.
TRACEABILITY MARKING________________________________________________
(marking on finished item)
IS FABRICATED FROM RAW MATERIAL IDENTIFIED TO
HEAT/LOT NUMBER _______________ AND HEAT TREAT NUMBER ______________________
(when applicable)
_________________________________________ DATE _____________________ (name and signature of auth. co. rep.)
3.35.4 Material certification data forwarded by the manufacturer must contain a signed certification that the report results represent the actual attributes of the material furnished and indicate full compliance with all applicable specification and contract
requirements. Transcription of certification data is prohibited.
3.35.5 Statements on material certification documents must be positive and unqualified. Disclaimers such as "to the best of our knowledge" or "we believe the information contained herein is true" are not acceptable.
3.35.6 If material is received without the required certification papers or with incorrect/missing data on the certification papers, the material will be rejected.
3.36 Material Handling - The written material control process must include the following:
3.36.1 All raw materials must have traceability markings (except as specified below).
3.36.2 Stored raw materials requiring traceability must be segregated to preclude intermingling with materials not requiring traceability.
3.36.3 When traceability markings will be removed by a manufacturing or fabrication process, the marking must be recorded prior to removal and be immediately restored upon completion of the process. If this cannot be done or is impractical, an appropriate
material control procedure (such as a bag and tag, tagging, and/or tote box control) must be employed. The material control procedure must provide a method of positive control to preclude commingling of heats/lots or loss of traceability. The traceability
marking must be reapplied upon completion of the final manufacturing process.
3.36.4 Brazing or weld filler metals for strength welds forming or integral with pressure containing components or assemblies requiring traceability must be verified to be the correct material, and type or grade, as applicable, prior to consumption. At a
minimum, material verification must consist of inspection of material test reports for conformance to specified requirements. Control of welding and brazing filler metals must be maintained to the point of consumption to assure use of the correct type and
grade. Markings and traceability requirements do not apply to brazing and weld filler metals after consumption. It is the responsibility of the prime contractor to ensure conformance with the above requirements on welds performed by their subcontractors.
3.36.5 Purchase orders for raw material must specify that the material be traceable to material certification test reports by traceability markings on the material and identified on the test reports. The certification data requirements contained in
DI-MISC-81020 must be invoked by the prime contractor on all subcontractors supplying Level I material.
3.36.6 The material control process must include requirements for the maintenance of traceability for items sent out for subcontracted operations. If such operations would remove traceability markings, purchase or work orders must specify a method and
marking location for remarking. The contractor must also ensure that subcontractor production controls are adequate to preclude commingling of materials during processing.
3.37 Receiving Inspection
3.37.1 Products and services produced by sub-tier suppliers for incorporation in the contract end item must be subject to inspection or audit at the time of receipt by the prime prior to further processing within the prime contractor's plant or shipment to
another location.
3.37.2 Receiving Inspection must include as a minimum -
Verification that the traceability marking on the material agrees with that on the certification test reports.
Verification that certification test reports are legible and complete.
Verification that the contents of the certification test reports are in compliance with the contractually invoked specifications and requirements.
3.38 Discrepancy Reporting
3.38.1 Nonconforming products must be identified and processed in accordance with the prime contractor's procedures for controlling nonconforming products. The prime contractor must report the receipt of any nonconforming products to the responsible sub-tier
supplier in accordance with established procedures. Nonconforming material records will be maintained and available for review
Attachments/Links
Contact Information
Contracting Office Address
  • P O BOX 2020 5450 CARLISLE PIKE
  • MECHANICSBURG , PA 17050-0788
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Sep 15, 2022[Solicitation (Original)] 48--VALVE,BALL
Sep 20, 2022[Solicitation (Updated)] 48--VALVE,BALL
Nov 25, 2022[Presolicitation (Updated)] 48--VALVE,BALL
Nov 28, 2022[Solicitation (Updated)] 48--VALVE,BALL
Dec 23, 2022[Solicitation (Updated)] 48--VALVE,BALL
Dec 23, 2022[Presolicitation (Updated)] 48--VALVE,BALL
Jan 18, 2023[Presolicitation (Updated)] 48--VALVE,BALL
Jan 18, 2023[Solicitation (Updated)] 48--VALVE,BALL

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >