DTRA Bldg. 20676 Motion Detectors

Agency: Department of the Army
State: New Mexico
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159151688527263
Posted Date: Sep 28, 2017
Due Date:
Solicitation No: W912PP17T0104
Source: Members Only
Solicitation Number :
W912PP17T0104
Notice Type :
Award Notice
Contract Award Date :
September 26, 2017
Contract Award Number :
W912PP17P0097
Contract Award Dollar Amount :
$149088.43
Contract Line Item Number :
0001
Contractor Awarded Name :
Unified Contractor Inc.
Contractor Awarded Address :
609 Broadway Blvd. NE Suite 228
Albuquerque, New Mexico 87102
United States
Synopsis :
Added: Sep 27, 2017 10:04 am
This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.
The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 20676 Motion Detector, Fiber Drops and Paint.
2. SPECIFIC REQUIREMENTS:

a.Contractor shall install 22 new fiber SIPR Drops in the locations identified in the drawing. Fiber to be 4 strand OM3 50um to each location with LC connectors.
b.New fiber shall be Red
c.All old, unused wiring shall be left in place.
d.Contractor shall install 8 new motion detectors in the locations identified in the drawing.
e.Contractor shall create a new zone for each detector.
f.Contractor shall run new power to each motion detector. Install (1) ea 48strand OM3 50um fiber optic cable in inner duct from Room 120 to upstairs work area. Terminate with LC connectors and land in new fiber shelves.
g.Install (1) 48 strand OM3 50um fiber optic cable from the SIPR safe to the existing cabinet in Room 120. Terminate with LC connectors and land in new fiber shelves.
h.Install a new slim line wall cabinet for termination passive fiber optic equipment in the upstairs work area.
i.Provide an additive/alternate price to install an additional (1) 48 strand OM3 50um fiber optic cable from the SIPR safe to the existing cabinet in Room 120. Terminate with LC connectors and land in new fiber shelves.
j.Provide 1 meter patch cords for each fiber pair in both the upstairs wall cabinet and the existing cabinet in Room 120.
k.Provide 3 meter patch cords for each work area outlet location.
l.Contractor shall refinish the floor in room 137 with epoxy paint coating as shown on the drawing.
m.Contractor shall prep the floor area and provide a smooth surface
n.Contractor shall remove the existing vinyl cove base on the perimeter of the room
o.Contractor shall install new vinyl cove base on the perimeter of the room.
p.Contractor shall remove the welds from the inside of the existing door to allow the door to become usable.
q.Contractor shall replace the door hardware and install the new hardware currently used in DTRA facilities.

Contracting Office Address :
Attn: CESPA-CT
4101 Jefferson Plaza NE
Albuquerque, New Mexico 87109-3435
United States
Primary Point of Contact. :
Glenda D. Kohlieber,
Contract Specialist
Phone: 5756524135

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >