Amendment

Agency: Department of the Army
State: Missouri
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159190158670721
Posted Date: Oct 6, 2017
Due Date: Oct 12, 2017
Solicitation No: W912DQ-17-B-1017
Source: Members Only
Solicitation Number :
W912DQ-17-B-1017
Notice Type :
Combined Synopsis/Solicitation
Synopsis :
Added: Aug 23, 2017 3:14 pm
The Phase V of the Blue River Basin (Dodson) is intended to complete the remaining features required to provide a fully functioning flood damage reduction project for the Dodson Industrial Park and complete the authorized project. Features include an earthen levee tie-in to connect the existing Boone Creek reach levee to the existing Bannister levee; an I-wall tie-in and associated earthwork to connect the existing Boone Creek levee to Prospect Blvd; earthen levee from Prospect to Hickman Mills rd, an I-wall tie-in and associated earthwork to connect the new levee to Hickman Mills rd; an I-wall to tie-in from an existing floodwall to an earthen levee; earthen levee from to new I-walls on either side of the 87th st connector; and earthen levee to the downstream terminus. Two gate well structures, one 30" water line relocation, one 16" sanitary sewer, and several smaller related features and appurtenances are also to be constructed. The earthen levee to be constructed will have a maximum height of approximately 30ft, but typical height is less than 20ft. The levee embankment will be constructed of compacted impervious fill placed on the riverside slope and random fill on the landside slope, with a 10 ft. crest width and 1(V) on 3(H) side slopes. The random fill will be covered with a topsoil to provide support for grass cover. Stability berms 30 ft. wide will be placed 20 ft. below the levee crest on both riverside and landside slope where the levee is taller than 20 ft. The stability berms will be constructed of random fill and covered with topsoil. Dynamic compaction will be utilized in areas where there are existing fill material in the foundation consists of largely non-organic debris in a soil matrix.
Please consult the list of document viewers if you cannot open a file.
Solicitation
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Solicitation
Posted Date:
August 23, 2017
Description: Solicitation
Prebid Site Visit Attendee List
Type:
Other (Draft RFPs/RFIs, Responses to Questions, etc..)
Label:
Prebid Site Visit Attendee List
Posted Date:
September 7, 2017
Description: Pre-bid Site Visit Attendee List
Amendment 1
Type:
Mod/Amendment
Posted Date:
September 8, 2017
Description: Amendment 01
Amendment 2
Type:
Mod/Amendment
Posted Date:
September 11, 2017
Description: Amendment 02
Amendment 3
Type:
Mod/Amendment
Posted Date:
September 18, 2017
Description: Amendment 03
Amendment 4
Type:
Mod/Amendment
Posted Date:
September 20, 2017
Description: Amendment 04
Amendment 5
Type:
Mod/Amendment
Posted Date:
September 21, 2017
Description: Amendment 05
Amendment 6
Type:
Mod/Amendment
Posted Date:
September 23, 2017
Description: The required response date/time has changed from 26-Sep-2017 01:00 PM to 12-Oct-2017 01:00 PM.
Amendment 7
Type:
Mod/Amendment
Posted Date:
October 5, 2017
Amendment_0007.pdf (15,677.01 Kb)
Description: Amendment 7
Contracting Office Address :
Attn: CENWK-CT
635 Federal Building 60l East 12th Street
Kansas City, Missouri 64106-2896
United States
Primary Point of Contact. :
JASON E. HULSEY
Phone: 8163893335
Secondary Point of Contact :
Matthew Wilson,
Contracting Officer
Phone: 816-389-3426

Related Document

Aug 24, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 8, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 10, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 11, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 18, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 22, 2017[Combined Synopsis/Solicitation] Blue River Basin- Dodson
Sep 24, 2017[Combined Synopsis/Solicitation] Amendment
Oct 18, 2017[Combined Synopsis/Solicitation] Amendment
Nov 5, 2017[Award] Blue River Basin Dodson Levee

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >