IPNF, Bonners Ferry RD, Middle Fork Boulder Creek Culvert

Agency: Department of Agriculture
State: Idaho
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159363922869010
Posted Date: Feb 13, 2019
Due Date: Mar 4, 2019
Solicitation No: 12034319Q0030
Source: Members Only
Opportunity History
Solicitation Number :
12034319Q0030
Notice Type :
Solicitation
Synopsis :
Added: Dec 17, 2018 6:32 pm
Bonners Ferry Ranger District, Idaho Panhandle NF, Middle Fork Boulder Creek Culvert. This project was previously solicited under 12034318R0013, issued May 4, 2018 and cancelled. This project consists of removal and disposal of an existing 10ft cmp. Installation of a 22ft span, 8ft 11in rise structural plate arch with concrete footings. This work will consist of constructing a stream channel through the pipe and installing grade control structures within the culvert and potentially outside the culvert near the inlet and outlet. Additionally a segment of road shall be reconstructed and shaped to provide adequate approaches over the new structure together with surface aggregate placed on the reconstructed segment of road. This work will also include placing rip rap material at the inlet and outlet. Contractor is required to maintain soil erosion and sediment control throughout the life of this project as well as seed and mulch all disturbed areas prior to completion. Project can be accessed from Bonners Ferry by taking the cow creek road east from the center of town approx. 3 miles to the jct with the crossport road turn left onto the crossport road and continue northwest approx. 6.5 miles to the Katka creek road FSR 314 turn left onto the 314 road and follow it approx 9.25 miles to the jct with FSR 408. Turn right onto the 408 road and follow it approx 3.75 miles to the jct with FSR 628. Turn left onto the 628 and follow it appox. .5 miles to the project location. Be advised this project may also be accessed by heading south from Bonners Ferry on HWY 95 approx. 10 miles to the 20 mile road FSR 408. Take a left off of the HWY on to FSR 408 and continue on FSR 408 approx. 15.25 miles to the Jct of FSR 628. Turn right onto the 628 and follow it appox. .5 miles to the project location. It is recommended that all interested parties drive both accesses to determine ease of access for construction equipment and supplies. Price Range $100,000 - $250,000. Est start date July 15, 2019 and complete by October 25, 2019. Solicitation to be issued on or around January 22, 2019.
Added: Feb 02, 2019 1:48 pm
Solicitation issue 2/2/19
Quotes due 3/4/19, 4:00pm local time
Added: Feb 13, 2019 2:06 pm
Amendment No 1 issued 2/13/19
Please consult the list of document viewers if you cannot open a file.
Solicitation 1
Type:
Solicitation
Posted Date:
February 2, 2019
Description: Middle Fork Boulder Creek Culvert RFQ
BoulderFSSS.pdf (620.46 Kb)
Description: Special Project Specifications
Description: Drawings Plans
Description: Food Storage Order
Description: Past Performance Survey (optional)
Description: State of Idaho Workers Comp form
Amendment 1
Type:
Mod/Amendment
Posted Date:
February 13, 2019
Description: SF30. Amendment No. 1
Description: Section B, Schedule of Items, replacement page
Contracting Office Address :
3815 Schreiber Way
Coeur d'Alene, Idaho 83815-8363
United States
Place of Performance :
Bonners Ferry Ranger District
Bonners Ferry, Idaho 83805
United States
Primary Point of Contact. :
Rita J. Loper,
Lead/Supv Contract Specialist
Phone: 2087657497
Fax: 2087657229
Secondary Point of Contact :
Kevin Davis,
Technical
Phone: 208-265-6686
All Files
Solicitation 1
Feb 02, 2019
RFQBoulderCulvert.do...
Download/View RFQBoulderCulvert.doc
BoulderFSSS.pdf Drawings_Boulder.pdf...
Download/View Drawings_Boulder.pdf
FoodStorageOrder_IPN...
Download/View FoodStorageOrder_IPNF.pdf
PastPerformanceSurve...
Download/View PastPerformanceSurvey.docx
WorkersCompForm.docx...
Download/View WorkersCompForm.docx
Amendment 1
Feb 13, 2019
SF30Amend1BoulderCul...
Download/View SF30Amend1BoulderCulvert.doc
AmendNo1_RFQBoulderC...
Download/View AmendNo1_RFQBoulderCulvert.doc
General Information
Notice Type:
Solicitation
Original Posted Date:
December 17, 2018
Posted Date:
February 13, 2019
Response Date:
Mar 04, 2019 4:00 pm Pacific
Original Response Date:
Mar 04, 2019 4:00 pm
Archiving Policy:
Manual Archive
Original Archive Date:
-
Archive Date:
-
Original Set Aside:
Total Small Business
Set Aside:
Total Small Business
Classification Code:
Z -- Maintenance, repair, and alteration of real property
NAICS Code:
237 -- Heavy and Civil Engineering Construction/237310 -- Highway, Street, and Bridge Construction

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >