Building 24761 and 34762 UPS Replacement, Kirtland Air Force Base, Bernalillo County, New Mexico

Agency: Department of the Army
State: New Mexico
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159628938524565
Posted Date: Oct 1, 2017
Due Date:
Solicitation No: W912PP17T0132
Source: Members Only
Solicitation Number :
W912PP17T0132
Notice Type :
Award Notice
Contract Award Date :
September 29, 2017
Contract Award Number :
W912PP17P0130
Contract Award Dollar Amount :
40805.00
Contract Line Item Number :
0001
Contractor Awarded Name :
QA Engineering, LLC
Contractor Awarded DUNS :
005093783
Contractor Awarded Address :
4700 Lincoln Rd NE
Albuquerque, New Mexico 87109
United States
Synopsis :
Added: Sep 29, 2017 7:14 pm
a. PHETS OPS Building (H34762) UPS:
1. Disconnect the 2 UPS units (Model #SY12KEX-PDBX1) located in the calibration lab (H34761) and relocate to storage room in the PHETS OPS Building H34762. One unit will be stored in this room the other will be polaced into service (in this room) via this scope of work. Remove the existing feed from panel PP-1 to Panel LP-1. Relocate circuits PP1-1, 2, 2, 5, 6, 7 and 37 to panel LP1. Install a new 100A 3P C/B in Panel PP1, and run new feeder from PP1 to the storage room where the UPS units are now located (UPS Input). Refeed panel LP-1 from the storage room (UPS Output). Install a 120V emergency fixture above PP-1 feed from a dedicated CKT in panel PP-1 (Label "power out when on"). See the attached one-line diagram.
b. PHETS Calibration Lab (H37461) UPS:
1. Take the 2 UPS units (Model #SY12KEX-PDBX1) out of service and relocate as previously instructed. Demo the existing feeds to panels UPS-1 & UPS-2 ( this includes the line side of the UPS Units). Remove the 2-2pole C/B in panel PP-1 that feed UPS-1 & UPS-2, and install a 3P 8-0A C/B in PP-1 to feed the provided UPS unit (APC smart -UPS VT 20 KVA Model #3SUVTP20K4B4S). Install provided UPS unit and extend feeder to new 100A 120/208V 3 phase 30 CKT MLO Panel. Relocate the 9 CKTS from PNL Ups-1 and the 10 CKT from PNL UPS-2 to the new 100A 3 phase PNL. Demo existing UPS Panel. See the attached one line diagram.
Contracting Office Address :
Attn: CESPA-CT
4101 Jefferson Plaza NE
Albuquerque, New Mexico 87109-3435
United States
Primary Point of Contact. :
Karen Irving
Phone: 505-342-3356
Fax: 505-342-3496

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >