John Day Downstream Gate Shoe Repair

Agency: Department of the Army
State: Oregon
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159630612778285
Posted Date: Oct 1, 2017
Due Date: Oct 30, 2017
Solicitation No: W9127N18R0005
Source: Members Only
Solicitation Number :
W9127N18R0005
Notice Type :
Solicitation
Synopsis :
Added: Aug 28, 2017 5:21 pm
The U.S. Army Corps of Engineers, Portland District's has a requirement to repair the lower portions of the Bearing Shoe on the Downstream Navigation Lock Gate at John Day Lock and Dam, located near Rufus, Oregon. The bearing shoe consists of hardened stainless steel, machined into "U" shaped sections. These sections are attached to the gate end plate and transfer the load from the gate into the Navigation Lock monolith through the embed gate guides on each side. The new shoe will replace the lower portions of the existing bearing shoe, which has cracked in multiple locations.

This work includes, but is not limited to, the demolition of the existing bearing shoe, the fabrication and machining of multiple sections of new bearing shoe, installation of the new bearing shoe with the gate in place with very limited access, and epoxy grouting the voids between end plate and shoe for the full height of the repair.


Contract duration is estimated at 90 calendar days to include fabrication and a two week work window in which the Lock will be dewatered from March 01 2018 to March 15, 2018.


The estimated Magnitude of Construction for this project is between $500,000.00 and $1,000,000.00.

Please consult the list of document viewers if you cannot open a file.
Solicitation 1
Type:
Solicitation
Posted Date:
September 29, 2017
A.07.23_W9127N18R0005_JD_Downstream_Gate_Bearing_Sho... (4,254.91 Kb)
Download/View A.07.23_W9127N18R0005_JD_Downstream_Gate_Bearing_Shoe_RFP.pdf
Description: Request for Proposal
Description: Experience Form
Description: Past Performance
Description: Subcontracting Plan
Description: Advertise Drawings
Description: Informational Drawings
Contracting Office Address :
Attn: CECT-NWP
PO Box 2946
Portland, Oregon 97208-2946
United States
Place of Performance :
Downstream Gate of the navigation lock at John Day Lock & Dam located near Rufus, Oregon
Rufus, Oregon 97050
United States
Primary Point of Contact. :
Derek Caputi
Phone: 5038084613

Related Document

Aug 19, 2017[Sources Sought] John Day Downstream Gate SHoe Repair
Aug 29, 2017[Presolicitation] John Day Downstream Gate Shoe Repair
Oct 12, 2017[Solicitation] John Day Downstream Gate Shoe Repair
Oct 18, 2017[Solicitation] John Day Downstream Gate Shoe Repair
Oct 22, 2017[Solicitation] John Day Downstream Gate Shoe Repair
Dec 1, 2017[Award] John Day Downstream Gate Shoe Repair
Dec 17, 2017[Award] John Day Downstream Gate Shoe Repair

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >