Edward Little High School

Agency: State Government of Maine
State: Maine
Level of Government: State & Local
Category:
  • 89 - Subsistence (Food)
  • 99 - Miscellaneous
Opps ID: NBD00169260317156931
Posted Date: Sep 8, 2020
Due Date: Oct 2, 2020
Source: Members Only
project title Location information Number due date time Prequalified Contractors Tentative Bid Due Date
Edward Little High School Auburn Notice to General Contractors 2020/10/02 2:00 PM

Attachment Preview

NOTICE TO GENERAL CONTRACTORS
REQUEST FOR QUALIFICATIONS
In conformance with Title 5 M.R.S.A., Section 1747, the State of Maine Department of
Education (DOE) and Department of Transportation (DOT) will qualify General
Contractors to bid on the Edward Little High School project located in Auburn, Maine.
The Department of Education will provide the direct review and approval referenced in
Title 5, §§1747-1749 on behalf of the Bureau of Real Estate Management (BREM) by
mutual agreement of DOE and BREM.
Interested General Contractors are required to complete a Pre-Bid Qualification
Application in order to receive the construction documents and participate in the bidding
process. General Contractors that are currently pre-qualified by BREM/DOT specifically
for “Buildings” are not required to submit a new application. Contractors currently
prequalified for buildings are required to send Notice of Intent to Bid by e-mail to
valerie.chiang@maine.gov by the deadline noted below. A confirmation receipt will be
sent. Any General Contractors not currently pre-qualified by BREM/DOT are directed to
complete the State of Maine Prequalification Application for this specific project.
The pre-bid qualification application may be downloaded from:
http://www.maine.gov/mdot/contractors/prequal/
Direct questions to Valerie Chiang, (207) 624-6693 or valerie.chiang@maine.gov. The
application must be completed and returned electronically to both
valerie.chiang@maine.gov and contractor.prequal@maine.gov, on or before Friday,
October 2, 2020 at 2 p.m. A confirmation of receipt will be sent. Applications received
after this deadline will not be accepted. This deadline supersedes all other published
instructions for application acceptance including Section 2.2.2 of the application and the
notice on the DOT Contractor Prequalification web page.
The Auburn School Department has a State funded construction project that includes the
construction of a new high school.
The Edward Little High School project consists of the construction of a new 280,000 sf
High School on the campus of the existing high school located at 77 Harris Street in
Auburn. The scope of work consists of new construction, including a three-story steel
framed building and associated mechanical, electrical, plumbing, and site work, including
utilities, drives, athletic playfields, and removal of the existing school. The estimated
construction cost is approximately $99,500,000.
Bidding documents prepared by Harriman will be available to prequalified General
Contractor bidders no earlier than November 17, 2020 with Notice to Proceed anticipated
in March 2021, and Substantial Completion of the new building by Fall 2023 and site by
July 1, 2024. Bid document information will be provided in advertisements to follow.
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >