I-81 CIP MM 72.0 NB to MM 73.4 NB Accel/Decel Lane...

Agency: State Government of Virginia
State: Virginia
Level of Government: State & Local
Category:
  • 65 - Medical, Dental, and Veterinary Equipment and Supplies
Opps ID: NBD14089154638121816
Posted Date: Jun 1, 2023
Due Date: Jul 11, 2023
Solicitation No: RFPQ 18086
Source: Members Only
Views: Current Version ( 11 ) All Versions ( 11 )
Details


RFPQ-18086


  • I-81 CIP MM 72.0 NB to MM 73.4 NB Accel/Decel Lanes with Bridges
  • Status: Open
  • Time Left:39 days
  • Closing:7/11/23 4:00 PM
  • Issued:6/1/23 4:31 PM
  • Last Updated:
  • Buyer:Sudha Mudgade

  • Sudha.Mudgade@vdot.virginia.gov
  • 804-786-5087



RFPQ-18086


  • I-81 CIP MM 72.0 NB to MM 73.4 NB Accel/Decel Lanes with Bridges
  • Status: Open
  • Time Left:39 days
  • Closing:7/11/23 4:00 PM
  • Issued:6/1/23 4:31 PM
  • Last Updated:
  • Buyer:Sudha Mudgade

  • Sudha.Mudgade@vdot.virginia.gov
  • 804-786-5087

  • Issued By:Virginia Department of Transportation
  • Opportunity Type:Request for Pre-qualifications (RFPQ)
  • Category:Highway Construction
  • Work Location:Wythe County, Virginia
  • Website:https://www.bidexpress.com
  • Pre-Bid Conference:See solicitation documents for optional prebid/proposal conference/site visit.
  • Summary:The Virginia Department of Transportation (VDOT) is seeking Statements of Qualifications for the I-81 CIP MM 72.0 NB to MM 73.4 NB Accel/Decel Lanes with Bridges design-build project from qualified and experienced respondents with design and construction experience of highway facilities. The project is located in Wythe County on I-81 at the junction of I-77, between I-81 NB mile markers 72.0 and 73.4. Proposed improvements include lengthening the acceleration lane at the merge area from the I-77 SB offramp to I-81 southbound and lengthening the deceleration lane from the I-81 northbound onramp to I-77 NB. Proposed improvements also include complete replacement of the existing bridges over Peppers Ferry Road and replacement of the I-81 northbound bridge over the I-77 NB trumpet ramp. Other roadway improvements include extending the I-77 Exit 41 SB acceleration lane to create an auxiliary lane that lengthens the merge area between the Exit 41SB entrance ramp and the off ramp to I-81 SB. Replacement of the I-81 southbound bridge over I-77 is not part of the project. The project does not increase the capacity of I-81 and will provide two lanes of travel in both I-81 directions. The work includes but not limited to: roadway and bridge design, survey, environmental, geotechnical, hydraulics and stormwater management, traffic control devices, transportation management plan, utility relocation, public involvement/relations and stakeholder coordination, quality assurance and quality control, construction engineering and inspection, and overall project management.

Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
B2B Follow ×
Enter Email Address:
CloseSubmit
B2B Unfollow ×
Enter Email Address:
CloseSubmit
Add B2B Posting ×
Contact Name:
Company Name:
Email Address:
Phone Number:
SWaM Certifications:

Micro Business

Small Business

Minority Owned Business

Women Owned Business

Service Disabled Veteran Owned

Employment Service Org
Message:
CloseSubmit

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >