2020 Roadway Project

Agency: City of Orem
State: Utah
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14176426244144231
Posted Date: Mar 12, 2020
Due Date: Apr 2, 2020
Source: Members Only
2020 Roadway Project

Written by Carlos Garcia on March 11, 2020. Posted in Bids , Notices

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using SciQuest for the construction of the 2020 Roadway Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on SciQuest until April 2, 2020 at 11:00 am and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using SciQuest at purchasing.utah.gov (Select the search bar > select Current Bids > enter “Orem” > search).

BIDDING QUESTIONS – Use SciQuest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Carlos Garcia (801)-229-7318. A mandatory pre-bid meeting will be held on March 25, 2020 at 1:00 pm at the City Center, 56 North State Street, in Room 105.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained March 11, 2020 on SciQuest under Orem City 2020 Roadway Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on SciQuest. There will be a $20 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK includes 52,500 SY of 1.5” edge mill and 2” overlay PG 64-34 with superpave additives, 15,000 SY of 2” profile mill and 2” overlay PG 58-28 with superpave additives, 5,000 SY of road reconstruction (4” PG 58-28 over 8” untreated base course), 4,750 SY of road reconstruction (4” PG 58-28 over 8” cement treated base), 7,000 SY of road reconstruction (4” PG 58-28 over 12”-21” of untreated base course), 9 speed tables, 500 LF of B3 concrete curbing, 750 SF of 9” stamped concrete, 60 modified ADA ramps, 250’ of monolithic curb, gutter, and sidewalk, 100’ of concrete cross gutter, 18 pre-treatment catch basins, 17 60” Ø sumps, and 260’ of 12” SDR35 PVC. The engineer’s estimate for the work is $2,200,000 to $2,400,000.

SITE OF WORK: The site of the WORK is located at 1800 N (From 800 W to State St.), 760 W (From 1800 N to 1725 N), 1725 N (From 760 W to State St.), upper portion of the Orem City Cemetery (North of the Murdock Canal Trail), Palisade Drive (From Center St. to 800 N), Main St. (From 1600 S to University Ave.), and the entirety of 140 East.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >