2020 Geneva Park Parking Lot Project

Agency: City of Orem
State: Utah
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14176466965513774
Posted Date: Feb 27, 2020
Due Date: Mar 19, 2020
Source: Members Only
2020 Geneva Park Parking Lot Project

Written by Kyra Wright on February 27, 2020. Posted in Bids , Notices

RECEIPT OF BIDS: Separate sealed BIDS or Electronic Submittal using SciQuest for the construction of 2020 Geneva Park Parking Lot Project will be received by Sam Kelly, City Engineer at the City of Orem, Engineering Division, 56 North State, Orem, UT 84057, or opened electronically on SciQuest until March 19, 2020 at 11:00 AM and then at said office publicly opened and read aloud. The preferred method for submitting a bid is by using SciQuest at purchasing.utah.gov

BIDDING QUESTIONS: Use SciQuest to submit questions and download documents relating to bid items, specifications, and other technical questions. The project engineer is Kyra Wright at (801) 229-7315.

MANDATORY PRE-BID MEETING: A mandatory pre-bid meeting will be held on March 5, 2020 at 11:00am at the City Center. All who wish to bid on project must be in attendance.

OBTAINING CONTRACT DOCUMENTS: The CONTRACT DOCUMENTS may be obtained February 26, 2020 on SciQuest under 2020 Geneva Park Parking Lot Project or at the City of Orem, Engineering Division, Development Services Offices, 56 North State Street, Orem, UT 84057. There is no fee from the City to obtain the documents on SciQuest. There will be a $20 non-refundable fee for a copy of the plans and specifications. (An additional $5.00 service charge will be assessed if the plans and specifications are to be mailed).

DESCRIPTION OF WORK: The WORK will include 1450 SY of 3” asphalt 1/2″ PG 58-28, 540 SY of 4” asphalt 1/2” PG 58-28, 80 CY of Granular Borrow, 550 LF of 2’ Concrete Curb and Gutter, 6 ADA Ramps, 3,250 SF of Concrete Flatwork, 101 LF of 8” DI Waterline, 159 LF of 4” DI Waterline,15 LF 2” Poly Waterline, 75 LF of 1” Poly Waterline, 253 LF of 8” SDR-35 PVC Sewer Pipe, Storm Drain Improvements including 240 LF of storm drain pipe and structures, 135’ of 1” Power Conduit with junction boxes and restriping all parking lots shown on the plans. The engineer’s estimate is $375,000 to $445,000.

SITE OF WORK: The site of the WORK is located at 255 North and 725 West.