Recovery Act PMIS #154950A - National Park Service: Vermont Youth Conservation Corps Trail Repair Along Appalachian Trail

Agency:
State: Federal
Level of Government: State & Local
Category:
  • 49 - Maintenance and Repair Shop Equipment
  • Y - Construction of Structures and Facilities
Opps ID: ADP12713747800000193
Posted Date: Apr 15, 2010
Due Date: Apr 24, 2010
Solicitation No: NPS-ARRAWASO2490100011
Source: Members Only
Document Type: Grants Notice
Funding Opportunity Number: NPS-ARRAWASO2490100011
Opportunity Category: Discretionary
Posted Date: Apr 15, 2010
Creation Date: Apr 15, 2010
Original Closing Date for Applications: Apr 24, 2010
Current Closing Date for Applications: Apr 24, 2010
Archive Date: May 24, 2010
Funding Instrument Type: Cooperative Agreement
Category of Funding Activity: Recovery Act
Category Explanation:
Expected Number of Awards: 1
Estimated Total Program Funding: $100,000
Award Ceiling: $100,000
Award Floor: $1
CFDA Number(s): 15.931 -- Conservation Activities by Youth Service Organizations
Cost Sharing or Matching Requirement: Yes
Eligible Applicants
Nonprofits having a 501(c)(3) status with the IRS, other than institutions of higher education
Additional Information on Eligibility:

Agency Name
National Park Service
Description
This Funding Announcement is not a request for applications. This announcement is to provide public notice of the National Park Service (NPS), intention to fund the following project activities without competition. OVERVIEW Established as the first National Scenic Trail by Congress with passage of the National Trails System Act in 1968, the Appalachian National Scenic Trail (A.T.) is a continuous marked footpath extending approximately 2,175 miles across the Appalachian Mountains from the summit of Springer Mountain in Georgia to the summit of Katahdin in Maine, forming a greenway that connects more than 90 public land areas in 14 states. The initial route was constructed entirely by volunteers between 1923 and 1937 and to this day is largely maintained by a corps of more than 6,000 volunteers. Each year the NPS conducts Condition Assessments to determine the current condition of the trail and trail related facilities such as backcountry shelters, parking lots, major trail bridges, buildings, and other asset types. To date, more than 10,000 individual deficiencies have been identified. Many of these can be repaired by volunteers; however some projects require specific expertise or resources beyond the capacity of volunteers to complete. A recent pilot survey (NPS 2009) estimated that approximately 2 million visitors hike a portion of the A.T. each year. This combination of high use and documented backlog maintenance deficiencies necessitates the use professionally led trail crews. This project will address identified maintenance needs on two segments of trail in Vermont. The work will be in compliance with the standards outlined in Trail Design, Construction, and Maintenance for the Appalachian Trail (Appalachian Trail Conservancy, 2000) and bring the trail from poor condition to good condition. The Vermont Youth Conservation Corps (VYCC) will field four crews for two consecutive projects, each consisting of two crew leader and six team members and supplemented by volunteers from the Green Mountain Club. Each crew will operate for a four week period. The first project will be located on the trail section between Peru Peak and Styles Peak (8,976 linear feet). The second project will be located on the trail section between Baker Peak and Griffith Lake (10,500 linear feet). Both projects will consist of substantial treadway rehabilitation involving the repair or installation of trail structures including (with approximate associated number) drainage ditches (1,000 linear feet), step stones (150), turnpiking (100 linear feet), rock water bars (20), and puncheon bridges (20). STATEMENT OF JOINT OBJECTIVES/PROJECT MANAGEMENT PLAN The objectives of this project are to rehabilitate approximately 19,476 linear feet of the Appalachian Trail in Vermont to meet trail condition standards that will provide for safe and enjoyable visitor experience while also protecting natural and cultural resources. In addition, the project will meet the goals of both the Public Lands Corps Act and the American Recovery and Reinvestment Act by partnering with a non-profit youth organization to provide employment opportunities for youth while working in and enjoying national parks and alleviating backlog maintenance work. RECIPIENT INVOLVEMENT The Vermont Youth Conservation Corps (VYCC) will field four crews for two consecutive projects, each consisting of two crew leader and six team members. Each crew will operate for a four week period and perform substantial trail rehabilitation work in accordance with accepted trail standards. NATIONAL PARK SERVICE INVOLVEMENT The National Park Service Appalachian Trail Park Office will coordinate the project with the appropriate management partners including the Appalachian Trail Conservancy, the Green Mountain Club, the Vermont Youth Conservation Corps, and the USDA Forest Service Green Mountain National Forest, where the project is located. The National Park Service works with all of these partners to identify the specific projects to be accomplished, the priorities of those projects, and the means to complete the work.
Link to Full Announcement
If you have difficulty accessing the full announcement electronically, please contact:
Heidi Sage
Contract Specialist (Contractor)
Phone 303-969-2378 National Park Service
Synopsis Modification History

There are currently no modifications for this opportunity.




TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >