Moon Pass Corral Project, Rio Grande NF
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Colorado |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159011853867842 |
Posted Date: | Apr 21, 2023 |
Due Date: | May 12, 2023 |
Solicitation No: | 1240LT23Q0034 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Original Published Date: Apr 21, 2023 11:54 am MDT
- Original Date Offers Due: May 12, 2023 04:30 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: Jul 15, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: F019 - NATURAL RESOURCES/CONSERVATION- OTHER WILDLIFE MANAGEMENT
-
NAICS Code:
- 238990 - All Other Specialty Trade Contractors
-
Place of Performance:
Saguache , CO 81149USA
This project is removal of old corral and installation of new corral 37°57'41.64"N 106°29'52.88"W. Contractor is responsible for deconstructing and removing old corral. Corral is constructed of old railroad ties, rough cut lumber and miscellaneous wire. New corral construction supplies will be provided. Contractor responsible for hauling material to project site from Monte Vista, CO at Forest Service Ad Site. Contractor responsible for providing all equipment to complete work such as welder, generator, welding supplies (sticks), fuel, trailer, and truck.
New construction will follow blueprint attached. Construction will be drill stem posts with prefabricated continuous fence panels and hung gates. All welds should be structurally sound and clean. All posts and panels should be level and with a straight trajectory.
All posts will be 2 3/8” drill stem sunk 3ft in the ground set in concrete. Holes should be 8” in diameter. Posts should be approximately 10ft spacing. Concrete fill will be 25lbs of dry concrete, mixed on site. On site water will be provided. Gate posts should be 15ft to accommodate the overhang.
Continuous fence panels shall be at least 1 5/8" round, 10 ga. rails, with at least five (5) rails, 4ft tall, and 20ft in length. On metal posts metal plates for attaching the rails shall be welded to the post. Welded in at least 2 locations per panel to each metal line or gate post. Gates shall be heavy-duty steel with heavy-duty hinges to minimize sagging. Gates will be 12ft 14ga. Each gate will have a drill stem pipe overhang welded horizonal over the gate to support gate posts. Overhang will span post to post and be 12ft tall.
The contractor will supply all labor for corral. The contractor is responsible for hauling all materials to the site. Equipment and supplies can be staged at the project location while work is being completed.
- RIO GRANDE NATIONAL FOREST 1803 WEST HWY 160
- MONTE VISTA , CO 81144
- USA
- Tanya Spanfellner
- tanya.spanfellner@usda.gov
- Phone Number 2082581041
- Apr 21, 2023 11:54 am MDTSolicitation (Original)
Related Document
May 23, 2023 | [Award Notice (Original)] Moon Pass Corral Project, Rio Grande NF |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.