FY23-24 D15 DE Cabling Project

Agency: JUSTICE, DEPARTMENT OF
State: Delaware
Level of Government: Federal
Category:
  • N - Installation of Equipment
Opps ID: NBD00159065888383400
Posted Date: Aug 11, 2023
Due Date: Aug 18, 2023
Solicitation No: 15M10223QA4700218
Source: Members Only
Follow
FY23-24 D15 DE Cabling Project
Active
Contract Opportunity
Notice ID
15M10223QA4700218
Related Notice
Department/Ind. Agency
JUSTICE, DEPARTMENT OF
Sub-tier
US MARSHALS SERVICE
Office
DEPT OF JUSTICE-US MARSHAL SERVICE
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Aug 11, 2023 12:24 pm EDT
  • Original Published Date: Jul 30, 2023 10:26 am EDT
  • Updated Date Offers Due: Aug 18, 2023 11:00 am EDT
  • Original Date Offers Due: Aug 03, 2023 11:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Sep 02, 2023
  • Original Inactive Date: Aug 18, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Updated Set Aside:
  • Product Service Code: N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Wilmington , DE 19801
    USA
Description View Changes

Please see attached SF1449 for Statement of Work.



If submitting a quote be sure to include completed and signed SF1449



NOTE in Subject of email: FY23-24 D15 DE Cabling Project - 15M10223QA4700218



Email Completed quote to



renee.leaman@usdoj.gov by 18 AUG 2023 at 1000 hrs. CST



The purpose of this amendment is to:

a. Extension granted to 18 AUG 2023 at 1000 hrs. CST.

b. Open up to all size business, remove small business set aside.

All other terms and conditions remain unchanged and in full force and effect



The purpose of this amendment is to:

a. Attached Modified SF1449 - See SOW on SF1449 RFQ

b. Include Question & Answer

All other terms and conditions remain unchanged and in full force and effect



Q&A




  • The SCHEDULE OF SUPPLIES/SERVICES states, “Line Period of Performance: 08/15/2023 - 08/14/2024”.

    • What are we committing to for this period? The Period of Performance will be push aprox 2 weeks out ~(9/1/2023 – 8/31/204) due to the extension of time on the procurement. It will begin once this is awarded.

    • Can we assume the Statement of Work (SOW) is one project to be done at the same time? YES



  • The SOW states, “Fax - 302-573-6218 - rm 104 and, “Fax - 302-573-6559 - 5th Floor - Cabling moved from block”.

    • To where are these cables to be moved or are they to be retired? Fax lines are to be moved from the punchdown block(s) to a patch panel.



  • The SOW states, “FIT room - rm 121 - Cabling needed”.

    • Are we to read this as the “Fit room” being the point of origin and “rm 121” being the point of destination between which we are to install dual, Cat 6 cables? Origination point for all cables on the 1st floor will be the ADP/Server/Cabling/Wiring room in USMS space. Cable from the Fit Room will terminate in the wiring room of the perspective floor (1st and 5th). (The FIT room is also titled rm 121, they are one and the same.)



  • The SOW states, “CSO Control Room 2 - rm 118 - Port 9D-10D-5V”.

    • Please explain. Is this a requirement to install cables from “CSO Control Room 2” to Room 118? The location is the CSO Control Room 2, rm # 118. The port on the wall is marked as 9D-10D-5V

    • What is meant by “Port 9D-10D-5V”. This means it’s Port # 9D-10D-5V



  • Where the SOW states that “Conduit” is needed,

    • Is this to be metal EMT or is a plastic raceway more suitable? Plastic flextube is acceptable. Conduit is required when cables leave USMS controlled space, per Pub 64.

    • Is conduit requirement for the last 7 to 8 feet, from the ceiling, down the wall to the point of termination or for the entire length of the cable run? . Conduit is only required when cables leave USMS controlled space, per Pub 64. If no conduit exists within the walls, standard behind the wall cable run is acceptable. No unsightly raceway will be accepted unless District Management approves.

    • Is the conduit to be installed on a block or concrete wall? This will be determined on a case by case basis with District Managements approval.




Attachments/Links
Contact Information View Changes
Contracting Office Address
  • USM, S/OH, 460 JOSEPH C. KINNEARY US COURTHOUSE, 85 MARCONI BLVD
  • COLUMBUS , OH 43215
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jul 30, 2023[Solicitation (Original)] FY23-24 D15 DE Cabling Project
Aug 2, 2023[Solicitation (Updated)] FY23-24 D15 DE Cabling Project

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >