Mt. Baker/Snoqualmie National Forest Boat Dock and Ramp purchase and Installation

Agency: AGRICULTURE, DEPARTMENT OF
State: Washington
Level of Government: Federal
Category:
  • 19 - Ships, Small Craft, Pontoons, and Floating Docks
Opps ID: NBD00159098621657921
Posted Date: Apr 4, 2024
Due Date: Apr 17, 2024
Solicitation No: 1240BD24Q0061
Source: Members Only
Follow
Mt. Baker/Snoqualmie National Forest Boat Dock and Ramp purchase and Installation
Active
Contract Opportunity
Notice ID
1240BD24Q0061
Related Notice
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
USDA-FS, CSA NORTHWEST 2
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Updated Published Date: Apr 04, 2024 09:04 am PDT
  • Original Published Date: Apr 03, 2024 03:30 pm PDT
  • Updated Date Offers Due: Apr 17, 2024 04:00 pm PDT
  • Original Date Offers Due: Apr 17, 2024 04:00 pm PDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: May 02, 2024
  • Original Inactive Date: May 02, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: 1945 - PONTOONS AND FLOATING DOCKS
  • NAICS Code:
    • 315990 - Apparel Accessories and Other Apparel Manufacturing
  • Place of Performance:
    Concrete , WA 98237
    USA
Description

(i) This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in subpart 12.6 of the Federal Acquisition Regulation, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued.

(ii) This solicitation, 1240BD24Q0061 is issued as a Request for Quotation (RFQ)

(iii) The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2023-05.

(iv) This procurement is set aside for Small Business Concerns. The NAICS code is 315990 - Other Apparel Accessories and Other Apparel Manufacturing and the Small Business Size Standard is 500 employees.



Description of Rewuirement



The Mt. Baker Snoqualmie National Forest has a requirement for a floating boat dock and ramp/gangway for the Swift Creek Campground on Baker Lake. Purchase of the boat dock, ramp/gangway and professional installation services will be required. Please see the salient characteristics of the boat dock and ramp for this requirement.



a) Installation must be included in your quote to be considered for award.

b) One Firm Fixed-Priced award will be issued.

c) Submit offers to Mindy Hickman via email at mindy.hickman@usda.gov prior to

17 April 2024, 1600, PST. Include the completed schedule of items, representation and certifications, Technical Capability such as literature/brochures detailing the specifications of the products you are offering and anticipated delivery date(s)



SALIENT CHARACTERISTICS:

Dock Specifications:



• Dock size to be 8 feet wide and 30 feet long with aluminum alloy construction.

• Dock framing to be minimum of 2”x6”x 0.125 tube with similar size tube braces and minimum2”x2”x0.25 angle around all perimeter corners. Both long sides of the dock to have minimum2”x8”x0.125 tube.

• Dock will be self-floating and have floats attached in a manner that allows light transmission though the dock.

• Entire dock decked with dark grey 1” x 1” Fibergrate decking or similar for durability and light transmission.

• Six 9” or larger welded on rope cleats spaced out around dock for boat lines.

• Chain brackets on both ends of the dock for anchoring. Dock will be secured with chains to the lake bottom.

• Corner bumpers and edging all around the dock large enough and durable enough to prevent any damage to docked boats.

• Ramp guides/protector plate for gangway to rest on dock.

• All exposed surfaces shall be smooth and free of sharp or jagged edges.



Ramp/Gangway Specifications:



• Ramp size to be 4 feet wide and 35 feet long with aluminum alloy construction.

• Ramp side chords to be minimum of 2”x4”x 0.125 tube, stringers minimum of 1 ½”x1”x0.125tube, and floor beams minimum of 2”x1 ½”x0.125 tube. Will include angle bracing.

• Entire ramp decked with dark grey 1” x 1” Fibergrate decking or similar for durability and light transmission.

• Ramp will have handrails on both sides for the entire ramp distance.

• Ramp will have two welded on anchor points on one end to secure ramp to shore structure.

• Ramp will have durable underside rollers on dock end to rest on top of dock.

• All exposed surfaces shall be smooth and free of sharp or jagged edges.

• Ramp will include galvanized abutment bracket for mounting to shore.



DELIVERY /INSTALLATION SPECIFICATIONS



Dock and ramp to be delivered and installed at Baker Lake, WA (Swift Creek Campground) by personnel knowledgeable in the field of boat dock installation. Dock and Ramp must be in safe working order when installation is complete



Dock secured with 4 ea. (4 foot or longer) galvanized augur anchors secured into lake bottom.



Dock secured with ½” long link galvanized chain and ¾” galvanized shackles to augur anchors



Ramp installed from shore to new dock in proper location and adjusted for changing water depths, wind, and waves



All exposed edges must be smooth and free of sharp or jagged edges.



DELIVERY LOCATION

Swift Creek Campground at Baker Lake, WA (No address) (Milepost 20 Baker Lake Rd) AVAILABLE DELIVERY/INSTALATION



DAYS AND TIMES:



• Monday through Friday 7:30am to 4:00pm (except on observed holidays)

• Dock installed during high water lake level (Memorial Day to Labor Day).



See attachment for more details


Attachments/Links
Contact Information
Contracting Office Address
  • 1220 SW 3RD AVE
  • Portland , OR 972042829
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Apr 22, 2024[Combined Synopsis/Solicitation (Updated)] Mt. Baker/Snoqualmie National Forest Boat Dock and Ramp purchase and Installation

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >