Gatehouse Electrical Upgrades: East Brimfield Lake, Fiskdale, Massachusetts
Agency: | |
---|---|
State: | Massachusetts |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159110047416898 |
Posted Date: | Mar 14, 2024 |
Due Date: | Apr 16, 2024 |
Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Mar 14, 2024 02:36 pm EDT
- Original Date Offers Due: Apr 16, 2024 01:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 01, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
-
NAICS Code:
- 238210 - Electrical Contractors and Other Wiring Installation Contractors
-
Place of Performance:
Fiskdale , MA 01518USA
The U.S. Army Corps of Engineers, New England District is issuing a set aside for small business
contractors to perform Gatehouse Electrical Upgrades at East Brimfield Lake in Fiskdale, Massachusetts.
The NAICS code for the work described below is 238210. The project is planned to be issued in March
2023 and will be set aside for Small Businesses. The period of performance will be approximately 180
days. The estimated magnitude of this project is between $250,000 and $500,000.
The work of this project involves electrical upgrades to the gatehouse at East Brimfield Dam. The work
shall include the following at a minimum:
. Upgrade the existing 100A, 120/208V, 3Ø, 4W switchboard and 100A MLO, 120/208V, 3Ø, 4W
lighting panel within the same enclosure inside the gatehouse at East Brimfield Lake Dam.
. The gatehouse feeder from the existing 100A-3P circuit breaker in the panelboard within the
utility building, routed to the gatehouse switchboard in steel conduit in the dam’s concrete
envelope, shall be pulled back, removed, and replaced in existing conduit.
. Branch circuit conductors from the gatehouse switchboard and lighting panel (i.e. Gate Hoist
Motors, Electric Unit Heater, Lighting, Receptacles) shall be removed and replaced to the first
device, within existing conduit.
. Optional items to be included in this project include removal and replacement of existing
floodlights; removal and replacement of interior lighting fixtures; and removal and replacement
of the existing unit heater.
- KO CONTRACTING DIVISION 696 VIRGINIA ROAD
- CONCORD , MA 01742-2751
- USA
- Natalie Allen
- natalie.m.allen@usace.army.mil
- Phone Number 9783188269
- Erin E. Bradley
- erin.e.bradley@usace.army.mil
- Phone Number 9783188195
- Mar 14, 2024 02:36 pm EDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.