Gatehouse Electrical Upgrades: East Brimfield Lake, Fiskdale, Massachusetts

Agency: DEPT OF DEFENSE
State: Massachusetts
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159153069494230
Posted Date: Mar 28, 2024
Due Date: Apr 16, 2024
Solicitation No: W912WJ24B0006
Source: Members Only
Follow
Gatehouse Electrical Upgrades: East Brimfield Lake, Fiskdale, Massachusetts
Active
Contract Opportunity
Notice ID
W912WJ24B0006
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NAD
Office
W2SD ENDIST NEW ENGLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Mar 28, 2024 02:24 pm EDT
  • Original Published Date: Mar 14, 2024 02:36 pm EDT
  • Updated Date Offers Due: Apr 16, 2024 02:00 pm EDT
  • Original Date Offers Due: Apr 16, 2024 01:00 pm EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Mar 28, 2025
  • Original Inactive Date: May 01, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Fiskdale , MA 01518
    USA
Description
The U.S. Army Corps of Engineers, New England District is issuing a set aside for small business contractors to perform Gatehouse Electrical Upgrades at East Brimfield Lake in Fiskdale, Massachusetts. The NAICS code for the work described below is 238210. The project is planned to be issued in March 2023 and will be set aside for Small Businesses. The period of performance will be approximately 180 days. The estimated magnitude of this project is between $250,000 and $500,000. The work of this project involves electrical upgrades to the gatehouse at East Brimfield Dam. The work shall include the following at a minimum: . Upgrade the existing 100A, 120/208V, 3�, 4W switchboard and 100A MLO, 120/208V, 3�, 4W lighting panel within the same enclosure inside the gatehouse at East Brimfield Lake Dam. . The gatehouse feeder from the existing 100A-3P circuit breaker in the panelboard within the utility building, routed to the gatehouse switchboard in steel conduit in the dam?s concrete envelope, shall be pulled back, removed, and replaced in existing conduit. . Branch circuit conductors from the gatehouse switchboard and lighting panel (i.e. Gate Hoist Motors, Electric Unit Heater, Lighting, Receptacles) shall be removed and replaced to the first device, within existing conduit. . Optional items to be included in this project include removal and replacement of existing floodlights; removal and replacement of interior lighting fixtures; and removal and replacement of the existing unit heater.
Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING DIVISION 696 VIRGINIA ROAD
  • CONCORD , MA 01742-2751
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >