Paint Booth
Agency: | DEPT OF DEFENSE |
---|---|
State: | Rhode Island |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159207469756577 |
Posted Date: | Jun 15, 2023 |
Due Date: | Jun 20, 2023 |
Solicitation No: | N66604-23-Q-0679 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Updated Published Date: Jun 15, 2023 09:10 am EDT
- Original Published Date: Jun 12, 2023 11:18 am EDT
- Updated Date Offers Due: Jun 20, 2023 02:00 am EDT
- Original Date Offers Due: Jun 15, 2023 02:00 am EDT
- Inactive Policy: Manual
- Updated Inactive Date: Jul 08, 2023
- Original Inactive Date: Jul 08, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: 5340 - HARDWARE, COMMERCIAL
-
NAICS Code:
- 332311 - Prefabricated Metal Building and Component Manufacturing
-
Place of Performance:
Newport , RI 02841USA
12JUN2023 - The following Q&As were received during solicitation:
Q: Doesn’t look like there is any duct work, not powder coated, no intake or heating system?
A: A heating system is not required
Q: The exhaust in the back does that mean center exhaust or corner exhausts?
A: We want the exhaust in the rear center of the booth so it can be ducted out the back wall, we would like the duct work included.
Q: Do you want windows in the 3 doors?
A: We would like windows in the doors.
Q: Do you want it powder coated? or just galvanized ?
A: We would like it Powder coated.
Q: Is there installation ?
A: We did not intend to have installation included but if it fits into the budget it would be great but not necessary.
Q: Is there a fire system that needs to be provided ?
A: I have not been informed of a requirement for a fire system.
Q: Is the booth Single Wall or Double wall
A: Single wall is okay.
Q: This is a dropship – contractor is not responsible for installation
A: We did not have the intention of including assembly with this purchase
Q: An Air Make-up Unit (AMU) is not included in the RFQ
A: I was never told an AMU was needed for this application, so I don’t believe its required
Q: Exhaust duct is not included in the RFQ
A: We would like the exhaust duct included. I do not have and exact measurement for how much is actually needed but a rough estimate would be 15 feet in length.
14JUN2023 - The following Q&As were received during solicitation:
Q: How high is the roof and is the roof flat or a pitch roof?
A: The ceiling is 22 feet high and the roof is flat.
- 1176 HOWELL ST
- NEWPORT , RI 02841-1703
- USA
- Elyce Hall
- elyce.c.hall.civ@us.navy.mil
- Phone Number 4018324763
- Jun 15, 2023 09:10 am EDTCombined Synopsis/Solicitation (Updated)
- Jun 12, 2023 12:09 pm EDT Combined Synopsis/Solicitation (Updated)
- Jun 12, 2023 11:57 am EDT Combined Synopsis/Solicitation (Updated)
- Jun 12, 2023 11:18 am EDT Combined Synopsis/Solicitation (Original)
Related Document
Jun 12, 2023 | [Combined Synopsis/Solicitation (Updated)] Paint Booth |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.