Letter Contract USST 1&2 Replacement SBIWTP

Agency:
State: California
Level of Government: Federal
Category:
  • N - Installation of Equipment
Opps ID: NBD00159228346536323
Posted Date: Oct 23, 2023
Due Date:
Source: Members Only
Follow
Letter Contract USST 1&2 Replacement SBIWTP
Active
Contract Opportunity
Notice ID
191BWC23C0018
Related Notice
Contract Line Item Number
Department/Ind. Agency
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Sub-tier
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Office
INTERNAT BOUNDARY AND WATER COMM
Award Details
  • Contract Award Date: Sep 30, 2023
  • Contract Award Number: 191BWC23C0018
  • Task/Delivery Order Number:
  • Contractor Awarded Unique Entity ID: VQTPF9KTZAY8
  • Contractor Awarded Name: VEOLIA WATER WEST OPERATING SERVICES INC
  • Contractor Awarded Address: Boston , MA 02109 USA
  • Base and All Options Value (Total Contract Value): $1,500,000.00
General Information
  • Contract Opportunity Type: Award Notice (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Oct 23, 2023 01:58 pm EDT
  • Inactive Policy: Manual
  • Original Inactive Date: Nov 06, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: N046 - INSTALLATION OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT
  • NAICS Code:
    • 221320 - Sewage Treatment Facilities
  • Place of Performance:
    San Diego , CA 92154
    USA
Description

Unstabilized Sludge Storage Tanks (USSTs). USST #1 was inoperable due to the condition of pipes and pumps prior to the storm. USST #2 was in service during the storm and the storm accelerated damage. One of three pumps is in operation, two are required for normal operation. Therefore, it is being operated at 50% capacity with no redundancies.



Before Hurricane Hillary, SBIWTP needed rehabilitation and expansion due to excessive flows coming from Mexico. The Tijuana River and Ocean by San Diego contain unsafe amounts sewage forcing the Beaches to close. The Hurricane further damaged the plant. Without these repairs the Plant highly likely to fail, if subjected to another storm before these repairs can be made, and result in an even larger discharge of raw sewage.


Attachments/Links
Contact Information
Contracting Office Address
  • 4191 N. Mesa
  • El Paso , TX 79902
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Oct 23, 2023 01:58 pm EDTAward Notice (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >