Roaring River Trail Bridge Replacement
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Idaho |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159347081793574 |
Posted Date: | Sep 11, 2023 |
Due Date: | Sep 15, 2023 |
Solicitation No: | 1092540 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Updated Published Date: Sep 11, 2023 12:36 pm MDT
- Original Published Date: May 11, 2023 01:07 pm MDT
- Updated Date Offers Due: Sep 15, 2023 05:00 pm MDT
- Original Date Offers Due: Jun 12, 2023 03:00 pm MDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Sep 30, 2023
- Original Inactive Date: Jun 27, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 236220 - Commercial and Institutional Building Construction
-
Place of Performance:
Boise , ID 83709USA
This is a combined Synopsis/Solicitation under:
NAICS 236220; Small Business Size Standard: $39.5M
Roaring River Trail Bridge Replacement
Mountain Home Ranger District, Boise National Forest, Elmore County, Idaho
This project consists of mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable steel trail bridge, hand-placed Rip Rap armoring of new bridge abutments using local in-situ rock, minor excavation, transportation, and installation of an existing government-sourced prefabricated steel trail bridge, minor repair work to the government-provided superstructure as indicated in the plans, design, purchase, delivery, and installation of new substructure for the government-provided superstructure, construction of approach embankments at the new bridge location, and general cleanup. This is a remote site not accessible by standard vehicles or heavy equipment and will likely require helicopter transportation in order to remove and dispose of the old structure, to relocate and reinstall the government-provided superstructure, and potentially to transport materials for the new substructure. The contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies and shall perform all work required to complete the project as shown on the plans, shown on the manufacturer’s shop drawings, and as described in the Standard Specifications (FP-14) and Forest Service Supplemental Specifications (FSSS).
The project is located is approximately 1.7 miles south along the Roaring River Trail (#045001) from its junction with National Forest System Road (NFSR) #255 in T4N, R8E, Section 11, Mountain Home Ranger District, Boise National Forest, Idaho. Detailed travel directions to the project location are included in the plans.
Limited camping for project personnel will be allowed at the site with permission of the COR. Staging of materials for the project will be allowed in designated areas inside the project boundary if approved in writing by the COR at the time of the project implementation.
- SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
- Washington , DC 202500001
- USA
- Mark Reed
- mark.reed@usda.gov
- Sep 11, 2023 12:36 pm MDTCombined Synopsis/Solicitation (Updated)
- Sep 11, 2023 08:38 am MDT Combined Synopsis/Solicitation (Updated)
- Aug 28, 2023 09:54 am MDT Combined Synopsis/Solicitation (Updated)
- Aug 28, 2023 09:51 am MDT Combined Synopsis/Solicitation (Updated)
- Aug 28, 2023 09:50 am MDT Combined Synopsis/Solicitation (Updated)
- Jun 27, 2023 09:56 pm MDT Combined Synopsis/Solicitation (Updated)
- May 18, 2023 12:35 pm MDT Combined Synopsis/Solicitation (Updated)
- May 17, 2023 09:49 am MDT Combined Synopsis/Solicitation (Updated)
- May 11, 2023 01:07 pm MDT Combined Synopsis/Solicitation (Original)
Related Document
May 11, 2023 | [Combined Synopsis/Solicitation (Original)] Roaring River Trail Bridge Replacement |
May 17, 2023 | [Combined Synopsis/Solicitation (Updated)] Roaring River Trail Bridge Replacement |
May 18, 2023 | [Combined Synopsis/Solicitation (Updated)] Roaring River Trail Bridge Replacement |
May 25, 2023 | [Combined Synopsis/Solicitation (Updated)] Roaring River Trail Bridge Replacement |
Aug 28, 2023 | [Combined Synopsis/Solicitation (Updated)] Roaring River Trail Bridge Replacement |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.