28-ID Diffractometer

Agency:
State: Illinois
Level of Government: Federal
Category:
  • 58 - Communications, Detection and Coherent Radiation Equipment
Opps ID: NBD00159378942419019
Posted Date: Mar 1, 2024
Due Date: Mar 15, 2024
Source: Members Only
Follow
28-ID Diffractometer
Active
Contract Opportunity
Notice ID
4-B138-Q-00213-00
Related Notice
Department/Ind. Agency
ENERGY, DEPARTMENT OF
Sub-tier
ENERGY, DEPARTMENT OF
Office
ARGONNE NATL LAB - DOE CONTRACTOR
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: Mar 01, 2024 11:12 am CST
  • Original Published Date: Mar 01, 2024 11:06 am CST
  • Updated Date Offers Due: Mar 15, 2024 05:00 pm CDT
  • Original Date Offers Due: Mar 15, 2024 05:00 pm CDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Mar 15, 2024
  • Original Inactive Date: Mar 15, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: 5865 - ELECTRONIC COUNTERMEASURES, COUNTER-COUNTERMEASURES AND QUICK REACTION CAPABILITY EQUIPMENT
  • NAICS Code:
    • 334516 - Analytical Laboratory Instrument Manufacturing
  • Place of Performance:
    Lemont , IL 60439
    USA
Description

The Advanced Photon Source Upgrade Project (APS-U) is planning a storage-ring upgrade that will reduce the electron-beam emittance by a factor of ~75. This ultra-low emittance is achieved by replacing the present storage ring lattice with a multi-bend achromat (MBA) lattice. The MBA lattice will increase the x-ray coherent fraction by two orders of magnitude and decrease the horizontal source size by a factor of ~20. In addition, the APS-U is planning to build eight new featured beamlines and make optics upgrades to many others.



One of the feature beamlines built as part of the APS-U with be dedicated to Coherent High Energy X-ray (CHEX) studies at sector 28ID of the APS. The CHEX beamline will operate with a combination of integrated and shared instruments. Three shared instruments will be installed on each branch line for use with multiple systems. The maximize the systems and scattering geometries that these shared instruments can accommodate requires a large Eulerian cradle that can be used with any of them. The large cradle would be swapped with the hexapod present in the typical diffractometer configuration.



We will be conducting a Pre-Award meeting on Tuesday, March 5th at 9:00 am CST. If you'd like to attend, please let me know and I'l send you a link to join the meeting.


Attachments/Links
Contact Information
Contracting Office Address
  • 9700 S. Cass Ave
  • Lemont , IL 60439
  • USA
Primary Point of Contact
Secondary Point of Contact


History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >