Maintenance Building Roof Replacement at Crooked Creek Lake
Active
Contract Opportunity
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
LRD
Office
W072 ENDIST PITTSBURGH
Looking for contract opportunity help?
General Information
-
Contract Opportunity Type: Solicitation (Original)
-
All Dates/Times are: (UTC-05:00) EASTERN STANDARD TIME, NEW YORK, USA
-
Original Published Date: Feb 21, 2024 09:30 am EST
-
Original Date Offers Due: Mar 27, 2024 11:00 am EDT
-
Inactive Policy: Manual
-
Original Inactive Date:
Feb 20, 2025
-
Initiative:
Classification
-
Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
-
Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
-
NAICS Code:
-
238160 - Roofing Contractors
-
Place of Performance:
Description
Maintenance Building Roof Replacement, Crooked Creek Lake, Ford City, Armstrong County, PA. The U.S. Army Corps of Engineers, Pittsburgh District. The U.S. Army Corps of Engineers, Pittsburgh District, has a requirement to replace a membrane roof and install new gutters and downspouts on the maintenance building at Crooked Creek Lake. The major features of the contract are identified below: a. Removal and disposal of all gutters and downspouts. b. Removal and disposal of all flashing. c. Removal and disposal of all roof membrane. d. Removal and disposal of a 4 foot width of existing insulation board down to roof deck around entire perimeter of the roof and replacement with new polyisocyanurate board insulation. e. Installation of new, fiberglass faced gypsum cover board over all insulation board over the entire roof. f. Installation of new pipe boots, new curbing and flashing at exhaust fans and vents g. Installation of new fully adhered reinforced Polyvinyl Chloride (PVC) roof membrane. h. Installation of new flashing, perimeter flashing and drip edge .i. Installation of new aluminum gutters and downspouts. j. The Contractor will be required to furnish roof system material and workmanship warranties. Roof membrane manufacturers warranty shall cover roof system materials and installation workmanship, including flashing, insulation, and accessories necessary for a watertight roof system construction for a duration of not less than 20 years. k. Roof system installer shall be approved, authorized, or licensed in writing by the roof system manufacturer and shall have at least the minimum five (5) years? experience required by the manufacturer as an approved, authorized, or licensed installer with that manufacturer and be approved at a level capable of providing the specified warranty. The work shall be completed within 270 calendar days after written Notice to Proceed. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
Attachments/Links
Contact Information
Contracting Office Address
-
WILLIAM S MOORHEAD FEDERAL BUILDING 1000 LIBERTY AVE
-
PITTSBURGH , PA 15222-4198
-
USA
Secondary Point of Contact
History
-
Feb 21, 2024 09:30 am ESTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.
Start Free Trial Today >