MS Choctaw Spillway Bank Repairs
Agency: | |
---|---|
State: | Mississippi |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159389867744878 |
Posted Date: | Mar 15, 2024 |
Due Date: | Mar 22, 2024 |
Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Updated Published Date: Mar 15, 2024 04:14 pm CDT
- Original Published Date: Feb 21, 2024 02:35 pm CST
- Updated Date Offers Due: Mar 22, 2024 01:00 pm CDT
- Original Date Offers Due: Mar 22, 2024 01:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Apr 06, 2024
- Original Inactive Date: Apr 06, 2024
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2KA - REPAIR OR ALTERATION OF DAMS
-
NAICS Code:
- 237990 - Other Heavy and Civil Engineering Construction
-
Place of Performance:
Ackerman , MS 39735USA
Project Title: 12445124B0005 MS Choctaw Spillway Bank Repairs.
Original Set Aside: The project is set-aside 100% for small businesses per FAR 19.5.
NAICS Code: 237990 - Other Heavy and Civil Engineering Construction (size standard $45m).
PSC: Z2KA - Repair Or Alteration Of Dams.
Magnitude: In accordance with FAR 36.204 the magnitude of this project is: (c) Between $100,000 and $250,000.
Location: See Attachment 005 Map. Choctaw Lake Road, 33.27133, -89.13944
Scope of Work (summarized): This project will repair a washout in the bank along the right side of Choctaw Lake Dam’s concrete spillway that resulted from heavy operating flow from an 8 inch plus storm event. Repairs will also be made to the PVC siphon system pipes on the spillway crest section, the gabion mattress at the exit invert of the spillway, and more heavier gradation rock riprap will be placed below the gabions.
Award of Contract: One award will be made from this Invitation for Bid (IFB), contractors must submit pricing for all items. This IFB will be awarded using the lowest price, responsive/responsible evaluation method.
Tentative Dates:
Site(s) Visit/Pre-Bid Conference (if needed): 12 Mar 2024 / 10:00hrs; POC: Matthew Gong, matthew.gong@usda.gov; (601) 965-1600.
Last Day for Questions: 03/16/2024.
Proposals Due: 03/22/2024.
Period of Performance: 04/15/2024 - 07/31/2024.
Submittal Method: All proposals will be emailed to cynthia.granderson@usda.gov and adam.doyle@usda.gov.
*********Amendment 0002 updates the site visit location:*************
The new location of the site visit is Tombigbee Ranger District, 6052 Highway 15, Ackerman, MS 39735.
- 6425 LAKEOVER RD STE A
- JACKSON , MS 39213
- USA
- Cynthia Granderson
- cynthia.granderson@usda.gov
- Phone Number 6019373213
- Adam L. Doyle
- adam.doyle@usda.gov
- Phone Number 573-917-0857
- Mar 15, 2024 04:14 pm CDTSolicitation (Updated)
- Mar 11, 2024 09:51 am CDT Solicitation (Updated)
- Mar 06, 2024 09:25 am CST Solicitation (Updated)
- Feb 21, 2024 02:35 pm CST Solicitation (Original)
- Feb 08, 2024 09:05 am CST Presolicitation (Updated)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.