Robert F. Henry Lock and Dam Trunnion Anchor Industry Day

Agency:
State: Alabama
Level of Government: Federal
Category:
  • 56 - Construction and Building Materials
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159389934557473
Posted Date: Mar 15, 2024
Due Date: Apr 16, 2024
Source: Members Only
Follow
Robert F. Henry Lock and Dam Trunnion Anchor Industry Day
Active
Contract Opportunity
Notice ID
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
SAD
Office
US ARMY ENGINEER DISTRICT MOBILE
General Information
  • Contract Opportunity Type: Special Notice (Original)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Original Published Date: Mar 15, 2024 01:28 pm CDT
  • Original Response Date: Apr 16, 2024 03:00 pm CDT
  • Inactive Policy: Manual
  • Original Inactive Date: May 16, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code:
  • NAICS Code:
  • Place of Performance:
    AL
    USA
Description

The U.S. Army Corps of Engineers, Mobile District, will be conducting an industry day to inform contractors of the construction project under development to replace spillway gate trunnion anchors. The objective of this project is for the Contractor to provide all labor, materials, and equipment necessary to de-tension, extract, replace, and post-stressed steel spillway gate trunnion anchor rods. The waterway navigation channel is not routinely dredged and access to the site by water may typically occur during the mid-December to the mid-May/June time frame. The work on the spillway gates must be performed during the dry season when the risk of water levels below the dam rising to the working level is minimized. Each spillway gate requiring its anchor rods to be replaced will be raised by project machinery and supported by a support system designed, fabricated, and installed by the contractor. The existing anchor ends above the nuts are short and it is unlikely the anchors may be released by pulling on the live end of the anchor rods. An anchor de-tensioning plan must be developed and approved prior to releasing the stress in the anchors. Once the anchor stress is released the embedded anchor rods must be accessed and cut by coring into the side faces of the concrete spillway piers. Anchor ends will be installed, followed by anchors, which must be stressed. A cover box will be installed over the replaced array of anchor rod ends. After the base bid work is completed, the contractor shall remove and reset five (5) stoplogs to isolate spillway gate ten for trunnion rod removal and replacement work. Repairs will be made to each stoplogs as necessary in order to ensure they are fit for service.



The industry day event will be held via webinar from 0900 – 1500 CT on Tuesday, April 16, 2024, virtually. The meeting will consist of a general session with a presentation on the project development, project status, and project schedule followed by an open question and answer discussion/feedback period (this session should last no more than one hour). The District’s objective is consultation as to methods to efficiently deliver plant and equipment to and on site to accomplish the work. After the general session and Q&A, there will be individual 30-minute break out sessions, upon request of each contractor. These will begin at 1230 PM CT. We strongly encourage contractors to share their suggestions and comments. The government is particularly interested in the project timeline and the recommended approach for carrying out the work. The draft contract plans, which provide additional project information, are included as enclosures. We welcome feedback from contractors on these draft contract plans.

Funds have been requested but not authorized nor provided to perform the work described and there is presently no planned date to advertise the work.

Please email Mr. Matthew Edwards at matthew.d.edwards@usace.army.mil by 1600 CST on April 9, 2024, if you plan to attend this event. Provide your name, contact information, the company you represent, the number of people in your party who will attend, and whether or not you want to participate in a 30-minute individual break out session. If no contractors respond, Industry Day will be canceled.


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 109 ST JOSEPH ST
  • MOBILE , AL 36628-0001
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Mar 15, 2024 01:28 pm CDTSpecial Notice (Original)