Columbia River Channel Improvements (CRCI) Pipe Procurement and Install

Agency:
State: Washington
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159451506693771
Posted Date: Feb 15, 2024
Due Date: Feb 15, 2024
Source: Members Only
Follow
Columbia River Channel Improvements (CRCI) Pipe Procurement and Install
Active
Contract Opportunity
Notice ID
W9127N24B0002
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NWD
Office
W071 ENDIST PORTLAND
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-08:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
  • Updated Published Date: Feb 15, 2024 02:11 pm PST
  • Original Published Date: Jan 12, 2024 09:41 am PST
  • Updated Date Offers Due: Feb 15, 2024 11:00 am PST
  • Original Date Offers Due: Feb 15, 2024 11:00 am PST
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Mar 01, 2024
  • Original Inactive Date: Mar 01, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z1KZ - MAINTENANCE OF OTHER CONSERVATION AND DEVELOPMENT FACILITIES
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Cathlamet , WA 98612
    USA
Description View Changes

15-FEB-2024: Bid Abstract has been posted.



07-FEB-2024: The purpose of this Amendment is to add the revised Plan Set (B.08 Amendment 0002 CRCI_ADVERTISE_PLAN_SET_02FEB2024). This amendment clarifies that controlled density fill is not required outside the levee limits (C-301) and that HDPE may not be used for the gravity pipes (C-204). The table of estimated quantities on C-101 has been updated. All other terms and conditions remain unchanged.



30-JAN-2024: The purpose of this Amendment is to revise the Specifications section 40 05 13.00 para 2.3.1.1.(b.).

b. The pressurized pipe must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of 0.95 inch. The gravity outfall pipes must have an inner diameter of (29.875 - 30) inch and a minimum w all thickness of .750 inch. Gravity outfall pipes can be the same thickness as the pressure pipe, but this is not required. Pipes are not required to be coated but coating does not need to be removed if products come coated.



The 26-JAN-24 Site Visit sign in sheet is posted w ith this Amendment as w ell as the revised Plan Set (B.08 Amendment 0001

CRCI_ADVERTISE_PLAN_SET29JAN2024). All other terms and conditions remain unchanged.



16-JAN-2024: Plans/Specs Uploaded



This solicitation pertains to Columbia River Channel Improvements Pipe Procurement and Installation project 2024 in accordance with the Specifications for the U.S. Army Corps of Engineers, Portland District, at Mile 44 of the Columbia River. This will be a firm-fixed-price construction contract. The North American Industry

Classification System (NAICS) code for this project is 237990 and the associated small business size standard is $45,000,000. The solicitation wis Full and Open competition and the magnitude of construction is between $1,000,000 and $5,000,000.



The U.S. Army Corps of Engineers, Portland District, has a requirement for the installation of three 30" inside diameter (ID) steel pipes through the Puget Island levee for permanent use in upland dredge disposal activities. The work includes a temporary pedestrian path, road cut with asphalt road surface replacement, trench

excavation, 30-inch steel pipe installation with reinforced concrete foundation blocks, backfill with controlled density fill/filter material, install wooden fence, and incidental related work. Procurement of Pipe lead time is estimated at 10 - 12 weeks and construction is estimated at 4 – 6 weeks beginning May of 2024 (depending on award date).


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING DIVISION 333 SW FIRST AVE
  • PORTLAND , OR 97204-3495
  • USA
Primary Point of Contact
Secondary Point of Contact
History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >