W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO.
Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
---|---|
State: | Federal |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159491261332506 |
Posted Date: | Mar 10, 2023 |
Due Date: | Mar 31, 2023 |
Solicitation No: | 36C25923Q0191 |
Source: | Members Only |
Follow
Active
Contract Opportunity
Notice ID
36C25923Q0191
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
NETWORK CONTRACT OFFICE 19 (36C259)
Looking for contract opportunity help?
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Updated Published Date: Mar 10, 2023 08:56 am MST
- Original Published Date: Feb 23, 2023 05:14 pm MST
- Updated Date Offers Due: Mar 31, 2023 03:00 pm MDT
- Original Date Offers Due: Mar 06, 2023 09:00 am MST
- Inactive Policy: Manual
- Updated Inactive Date: Apr 30, 2023
- Original Inactive Date: Apr 20, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: W054 - LEASE OR RENTAL OF EQUIPMENT- PREFABRICATED STRUCTURES AND SCAFFOLDING
-
NAICS Code:
- 332311 - Prefabricated Metal Building and Component Manufacturing
-
Place of Performance:
Project# 575-19-101
Temporary ER Questions
1. On Page 98 Addendum to FAR 52.212-1 is not filled out.
Response: This is an oversight. The information will be provided on Amendment 0002.
2. On Page 104 E.9. 52.236-27 are there any instructions for mask requirements, who or where are we supposed to meet?
Response: This is an oversight. The information will be provided on Amendment 0002.
3. On Page 106 E.12. 52.212-2 is not filled out.
Response: This is an oversight. The information will be provided on Amendment 0002.
New questions:
4. Are you looking for new buildings or will you accept used
Pending response
5. How long is the lease for? It looks like base plus 4 options just making sure
Response: Requirement is for a Base and provides for Four One Year Options. Options are exercised at VA discretion and need.
6. I would add some clarifications around CLIN 5002 if not that number could be all over the place.
Response: The VA is not able to determine what clarifications are required based upon the question provided.
7. CLIN 0002 needs more clarification.
Response: The VA is not able to determine what clarifications are required based upon the question provided.
8. Is there a site visit? If so when?
Potential Response: See SECTION E 52.236-27 and the information to be provided in Amendment 0002.
9. Is there a site map? How far are utilities from the site?
Pending response
10. Is there a specific fire alarm system that you need?
Pending response
11. Are there specifications for the building? Do the area that patience will be seen in have special requirements?
Pending response
12. What type of door hardware is being requested for this solicitation? Is there a certain product we will need to use for compatibility with the main facilities? Sargent, Tell, etc.?
Pending response
13. Per the conceptual floor plan, there is a connecting platform shown to capture the exterior doors. Can this be a deck platform with covered canopy with the associated ramps for ADA compliance? If yes, can you clarify what type of material is to be used whether it be PT wood or aluminum?
Pending response
14. We understand there will be access control at all exterior door locations. Can you confirm which interior doors, if any, are required to have access control?
Pending response
15. Our typical foundation design is based on a 2,000 psf capacity. Will this be acceptable?
Pending response
16. Is there a geo-tech report or topographic survey that is available?
Pending response
17. Is the existing power on-site three phase or single phase?
Pending response
18. What is the required data/comm configuration per drop for the modular building? Our standard configurations is 2 cables per drop. (1) data and (1) voice, per drop. Please confirm this is acceptable.
Pending response
18. We intend to propose all low voltage cable running above ceiling to be ran in plenum rated cable with J-hooks or Arlington loops. Please confirm this is acceptable.
Pending response
19. It is our understanding that all water piping outside of building envelope will need to be protected from freezing. The exposed areas on the modular building would only be in the crawlspace below the sub floor. Are both pipe insulation and heat trace required, or just insulation?
Pending response
20. Will the Fire Sprinkler system, if required, need to be Sch. 40 black pipe or is CPVC (Blazemaster) pipe acceptable for the modular building? Also, NFPA 13 and UFC 3-600-01 permits the use of Sch. 40 and Sch. 10 black pipe. Please confirm this is acceptable or if Sch. 40 is required throughout.
Pending response
Temporary ER Questions
1. On Page 98 Addendum to FAR 52.212-1 is not filled out.
Response: This is an oversight. The information will be provided on Amendment 0002.
2. On Page 104 E.9. 52.236-27 are there any instructions for mask requirements, who or where are we supposed to meet?
Response: This is an oversight. The information will be provided on Amendment 0002.
3. On Page 106 E.12. 52.212-2 is not filled out.
Response: This is an oversight. The information will be provided on Amendment 0002.
New questions:
4. Are you looking for new buildings or will you accept used
Pending response
5. How long is the lease for? It looks like base plus 4 options just making sure
Response: Requirement is for a Base and provides for Four One Year Options. Options are exercised at VA discretion and need.
6. I would add some clarifications around CLIN 5002 if not that number could be all over the place.
Response: The VA is not able to determine what clarifications are required based upon the question provided.
7. CLIN 0002 needs more clarification.
Response: The VA is not able to determine what clarifications are required based upon the question provided.
8. Is there a site visit? If so when?
Potential Response: See SECTION E 52.236-27 and the information to be provided in Amendment 0002.
9. Is there a site map? How far are utilities from the site?
Pending response
10. Is there a specific fire alarm system that you need?
Pending response
11. Are there specifications for the building? Do the area that patience will be seen in have special requirements?
Pending response
12. What type of door hardware is being requested for this solicitation? Is there a certain product we will need to use for compatibility with the main facilities? Sargent, Tell, etc.?
Pending response
13. Per the conceptual floor plan, there is a connecting platform shown to capture the exterior doors. Can this be a deck platform with covered canopy with the associated ramps for ADA compliance? If yes, can you clarify what type of material is to be used whether it be PT wood or aluminum?
Pending response
14. We understand there will be access control at all exterior door locations. Can you confirm which interior doors, if any, are required to have access control?
Pending response
15. Our typical foundation design is based on a 2,000 psf capacity. Will this be acceptable?
Pending response
16. Is there a geo-tech report or topographic survey that is available?
Pending response
17. Is the existing power on-site three phase or single phase?
Pending response
18. What is the required data/comm configuration per drop for the modular building? Our standard configurations is 2 cables per drop. (1) data and (1) voice, per drop. Please confirm this is acceptable.
Pending response
18. We intend to propose all low voltage cable running above ceiling to be ran in plenum rated cable with J-hooks or Arlington loops. Please confirm this is acceptable.
Pending response
19. It is our understanding that all water piping outside of building envelope will need to be protected from freezing. The exposed areas on the modular building would only be in the crawlspace below the sub floor. Are both pipe insulation and heat trace required, or just insulation?
Pending response
20. Will the Fire Sprinkler system, if required, need to be Sch. 40 black pipe or is CPVC (Blazemaster) pipe acceptable for the modular building? Also, NFPA 13 and UFC 3-600-01 permits the use of Sch. 40 and Sch. 10 black pipe. Please confirm this is acceptable or if Sch. 40 is required throughout.
Pending response
Attachments/Links
Contracting Office Address
- 6162 S WILLOW DR SUITE 300
- Greenwood Village , CO 80111
- USA
Primary Point of Contact
- Douglas D Buffington (Supv CO)
- Douglas.Buffington@va.gov
Secondary Point of Contact
- Mar 10, 2023 08:56 am MSTSolicitation (Updated)
- Feb 23, 2023 05:14 pm MST Solicitation (Original)
Related Document
Feb 24, 2023 | [Solicitation (Original)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Feb 24, 2023 | [Presolicitation (Original)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Mar 17, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Mar 22, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Mar 30, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Apr 8, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
Apr 25, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
May 5, 2023 | [Solicitation (Updated)] W054--Rental of EMERGENCY ROOM MODULAR/TRAILERS Grand Junction VAMC, CO. |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.