Green Mountain National Forest Culvert Replacements Forest Roads 73 & 273
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Vermont |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159502956439560 |
Posted Date: | Jul 13, 2023 |
Due Date: | Jul 28, 2023 |
Solicitation No: | 12441923B0012 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Presolicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Jul 13, 2023 10:23 am EDT
- Original Response Date: Jul 28, 2023 05:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Aug 31, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z2LB - REPAIR OR ALTERATION OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Bennington , VT 05201USA
Scope of Contract
The Forest Roads 73 and 273 Culvert Replacements Contract work shall include, but is not limited to, excavation, removal of existing culvert, layout and construction of the plate arch, stream simulation, roadway reconstruction, and approach work.
Project Schedule
Construction will occur in 2024, but it shall be completed by October 31 of the year that construction started. All in-stream work shall be between July 1 and September 30 of the same year. Final project completion shall be no later than October 31, 2024.
Project Location
FR73–1.55 and FR273-2.8 culverts are located on the Green Mountain National Forest in Woodford, VT in Bennington County.
Statement of Work/Specifications
The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the State of Work/Specifications referenced. Each culvert replacement has its own Schedule of Items and Drawings. The Contractor shall coordinate all work and scheduling for the replacement of both culverts within the contract period of performance.
MAGNITUDE OF CONSTRUCTION PROJECT
Per FAR Subpart 36.204, the anticipated price range of this project is between $500,000 and $1,000,000.
TECHNICAL SPECIFICATIONS
The U.S. Department of Transportation, Federal Highway Administration, Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14, and its revisions are included by reference only (see Attachment 3). Also applicable, but not listed, is any other section or subsection of the included Specification(s) or any specific standard or specification referenced therein. The requirements contained in these specifications are hereby made a part of this Invitation for Bid and any resulting contract.
FP-14 can be downloaded directly from the following website free of charge: https://highways.dot.gov/federal-lands/specs.
Please note, it is the responsibility of the Contractor to verify they are using the current version.
In addition to the specifications referenced above, the Forest Service Supplemental Specifications (FSSS) are revisions to the Standard Specifications (FP-14) that incorporate changes and/or additions that are specific requirements unique to this particular project also apply (see Attachment 4).
The applicable Wage Determination is VT20230048 (see Attachment 6).
KEY DATES
Tentative date for issuing the Invitation for Bid is 07/31/2023.
Tentative date for opening bids is 08/31/2023.
Project must be completed by 10/31/2024.
The solicitation and all supporting documents will be posted on this website (SAM.gov) free of charge.
ATTACHMENTS
Attachment 1 - Reserved
Attachment 2 GMNF FR 73 Culvert Replacement PLANS
Attachment 3 DOT FHA Standard Specifications for Construction of Roads and Bridges FP-14
Attachment 4 GMNF FR 273 Culvert Replacement PLANS
Attachment 5 GMNF FR73 & 273 Culvert Replacements Supplemental Specs
Attachment 6 - Davis-Bacon Act WD VT20230049
- SPOC EAST 1400 INDEPENDENCE AVE SW, MS-1138
- Washington , DC 202500001
- USA
- Bradley Martin
- Bradley.Martin2@usda.gov
- Evonne Huggins
- Evonne.Huggins@usda.gov
- Jul 13, 2023 10:23 am EDTPresolicitation (Original)
Related Document
Aug 2, 2023 | [Solicitation (Original)] Green Mountain National Forest Culvert Replacements Forest Roads 73 & 273 |
Sep 14, 2023 | [Solicitation (Updated)] Green Mountain National Forest Culvert Replacements Forest Roads 73 & 273 |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.