Freezer Repair
Agency: | VETERANS AFFAIRS, DEPARTMENT OF |
---|---|
State: | Georgia |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159511494452336 |
Posted Date: | Apr 19, 2024 |
Due Date: | Apr 22, 2024 |
Solicitation No: | 36C24724Q0596 |
Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Apr 19, 2024 11:05 am EDT
- Original Date Offers Due: Apr 22, 2024 12:00 pm EDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: May 07, 2024
-
Initiative:
- None
- Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
- Product Service Code: J072 - MAINT/REPAIR/REBUILD OF EQUIPMENT- HOUSEHOLD AND COMMERCIAL FURNISHINGS AND APPLIANCES
-
NAICS Code:
- 811412 - Appliance Repair and Maintenance
-
Place of Performance:
Decatur , GA 30033USA
The Contractor shall provide a one-time service for freezer repair.
-
Order, receive and deliver to the jobsite the following equipment:
- One (1) Trenton 3.5-HP air-cooled condenser rated at 11,800 BTUH, Model TEZA035L8HT3DF.
- One (1) Trenton evaporator rated at 11,300 BTUH, Model TPLP211LES2DR8ESP.
- Lock and tag out the energy source to both the evaporator and condenser.
- Disconnect and reconnect the evaporator condensate drain line.
- Disconnect and reconnect the Type L copper refrigerant piping. New copper piping and fittings will be utilized to tie the new equipment into the existing line sets.
- Disconnect and reconnect the high-voltage wiring to the condenser and evaporator. New fused disconnects will be installed for both the evaporator and condenser.
- Remove the existing evaporator and condenser.
- Move the new condenser onto the roof.
- Install the replacement evaporator.
- Pressurize, leak check, and evacuate the circuit per EPA guidelines.
- Charge the system with virgin 448A refrigerant to OEM recommended sub-cooling guidelines.
- Insulate the affected ACR piping, and fittings and the condensate drain line.
- Start up and verify operation of the system.
- Clean up working area and return to prework conditions.
- ONE FREEDOM WAY
- AUGUSTA , GA 30904
- USA
- Don Grier
- Don.Grier@va.gov
- Phone Number 4044146921
- Apr 19, 2024 11:05 am EDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.