Moyer Bridge Installation - Salmon-Challis National Forest

Agency: AGRICULTURE, DEPARTMENT OF
State: Idaho
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159549441853317
Posted Date: Jul 6, 2023
Due Date: Jul 17, 2023
Solicitation No: 1282B123R0057
Source: Members Only
Follow
Moyer Bridge Installation - Salmon-Challis National Forest
Active
Contract Opportunity
Notice ID
1282B123R0057
Related Notice
1095984
Department/Ind. Agency
AGRICULTURE, DEPARTMENT OF
Sub-tier
FOREST SERVICE
Office
Salmon and Challis National Forests
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Solicitation (Updated)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: Jul 06, 2023 09:55 am CDT
  • Original Published Date: Jun 15, 2023 03:41 pm CDT
  • Updated Date Offers Due: Jul 17, 2023 04:00 pm CDT
  • Original Date Offers Due: Jul 17, 2023 04:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Updated Inactive Date: Aug 01, 2023
  • Original Inactive Date: Aug 01, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Historically Underutilized Business (HUBZone) Set-Aside (FAR 19.13)
  • Product Service Code: Z1LB - MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Salmon , ID 83467
    USA
Description View Changes

The Salmon-Challis National Forest has an Aquatic Organism Passage project to replace an existing ford with a bridge. Work includes channel restoration, installation of a government furnished bridge on contractor provided abutments and the construction of bridge approach roadways. Rock and aggregate materials are available from government sources. Alternate (Commercial) sources proposed by the contractor will need to be approved for material suitability and weed free nature of the source. The contractor is responsible for the acquisition of the abutment materials per the attached plans and specifications along with the erection of the abutments. Government furnished materials are located at 3 locations in the vicinity of the project. The prefabricated bridge will be staged in Salmon, Idaho. The contractor is responsible for transporting the bridge to the work site. An instream work window of 7/15 to 8/15 has been established. All work within the ordinary high-water mark including de-watering, excavation and backfill, channel restoration and re-watering of the channel shall occur within this window.



Refer to the attached Schedule of Items, Statement of work, Prelim Moyer Creek FSSS, Moyer Creek Final Drawings, Project Design features, Moyer Access map and Materials vicinity maps for specifications, drawings, requirements and locations.



A Pre-Quote site visit is planned for: June 28, 2023 at 09:00, MT. Participants will meet at: Salmon-Challis Supervisor's Office, located at 1206 S Challis Street, Salmon, ID.



Attendance at the site visit is not mandatory; however, submitted proposals are required to include any questions or modifications, if any, in the submitted proposals.



Please register for the site visit by emailing the Government's Contracting point of contact of your interest in attending the site visit.



Quotes are due: July 17, 2023 by 4:00 p.m. CT and are to be sent electronially to: susan.j.kunath@usda.gov with the Quoters name and Moyer Bridge in the subject line.



Government's Contracting Point of Contact:



Susan Kunath



email: susan.j.kunath@usda.gov



6/16/23 Attachment 10 Moyer Creek Bridge Shop Drawings has been added to the list of attachments. As this is for information purposes only, an SF30 is not required.



7/6/23 - Site visit questions and answers, and discussion notes from 6/28/23 were added in the attachments.


Attachments/Links
Attachments
Document File Size Access Updated Date
Q_As Moyer Site Visit_6.28.23_sk.pdf (opens in new window)
241 KB
Public
Jul 06, 2023
Attachment 10 Moyer Creek Bridge Shop Drawings APPROVED.pdf (opens in new window)
3 MB
Public
Jun 16, 2023
Attachment 9 Appendix D Past Performance Questionnaire.pdf (opens in new window)
153 KB
Public
Jun 15, 2023
Attachment 8 DBWage Determination ID20220087.txt (opens in new window)
12 KB
Public
Jun 15, 2023
Attachment 7 MOYER MATERIALS VICINITY MAP.pdf (opens in new window)
665 KB
Public
Jun 15, 2023
Attachment 6 MOYER ACCESS MAP.pdf (opens in new window)
1 MB
Public
Jun 15, 2023
Attachment 5 Project Design Features.pdf (opens in new window)
190 KB
Public
Jun 15, 2023
Attachment 4 G-074 MOYER CREEK FINAL Drawings.pdf (opens in new window)
2 MB
Public
Jun 15, 2023
Attachment 3 PRELIM MOYER CREEK FSSS.pdf (opens in new window)
732 KB
Public
Jun 15, 2023
Attachment 2 Statement of Work.pdf (opens in new window)
264 KB
Public
Jun 15, 2023
Attachment 1 Schedule of Items.pdf (opens in new window)
80 KB
Public
Jun 15, 2023
1282B123R0057.pdf (opens in new window)
1 MB
Public
Jun 15, 2023
file uploads

Contact Information
Contracting Office Address
  • SALMON CHALLIS NATIONAL FOREST 1206 S CHALLIS ST
  • SALMON , ID 83467
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Jun 15, 2023[Solicitation (Original)] Moyer Bridge Installation - Salmon-Challis National Forest
Jun 16, 2023[Solicitation (Updated)] Moyer Bridge Installation - Salmon-Challis National Forest

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >