NREL Flatirons Campus (FC) Water System
Agency: | ENERGY, DEPARTMENT OF |
---|---|
State: | Colorado |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159611998524665 |
Posted Date: | Apr 11, 2023 |
Due Date: | May 12, 2023 |
Solicitation No: | SSN-2023-23045 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-06:00) MOUNTAIN STANDARD TIME, DENVER, USA
- Original Published Date: Apr 11, 2023 10:57 am MDT
- Original Response Date: May 12, 2023 05:00 pm MDT
- Inactive Policy: Manual
- Original Inactive Date: May 12, 2023
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1NE - CONSTRUCTION OF WATER SUPPLY FACILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Arvada , CO 80007USA
Introduction:
The National Renewable Energy Laboratory (NREL) is the U.S. Department of Energy’s primary national laboratory for renewable energy and energy efficiency research and development. NREL develops renewable energy and energy efficiency technologies and practices, advances related to science and engineering, and transfers knowledge and innovations to address the nation’s energy and environmental goals. The campus is managed by the Alliance for Sustainable Energy, LLC.
The Alliance for Sustainable Energy, LLC (hereinafter called “Alliance”) has entered into Contract with the Department of Energy (hereinafter called "DOE"), an agency of the U.S. Government (hereinafter called "Government"), for the management and operation of the National Renewable Energy Laboratory (hereinafter called “NREL”). All references to "NREL" in this Sources Sought shall mean the Alliance for Sustainable Energy, LLC.
Background
The NREL Flatirons Campus (FC) Water System project will provide onsite potable water and fire suppression water facilities to support the planned growth of the research facilities at the site. The scope of the project will be to construct a raw water line, a building containing a potable water treatment system and fire suppression water storage tanks. The project will construct approximately 3 miles of new raw water line from Francis Smart Reservoir across the wildlife refuge north to two 275,00 gallon fire water storage tanks and a water treatment system located on the FC. The project also includes submerged intake pipes and a pump house at Francis Smart Reservoir.
Qualification/Submission Requirements:
The Subcontractor shall provide examples (Qty.: 3 Min.; 5 Max.) as well as past performance within last 3 years of successfully completed projects in civil and water supply line construction (not-to-exceed 20 pages). NREL is seeking information from the Subcontractor that demonstrates the Subcontractor’s capability to manage lower-tier subcontractors with regards to safety, security, schedule, cost and administrative requirements. In addition to the above, the Subcontractor is encouraged to provide project experience working with state or federal agencies.
Please provided details on your socio-economic status.
Subcontractors within a 90-mile radius to NREL is preferred.
Location:
Arvada, Colorado 80007.
- PO BOX 4011 MAILSTOP RSF-041
- Golden , CO 80402
- USA
- Scott Rydwell
- Scott.Rydwell@nrel.gov
- Phone Number 720-362-9898
- Randy Fransua, Senior Subcontract Administrator
- Randy.Fransua@nrel.gov
- Phone Number 303-630-5165
- Apr 11, 2023 10:57 am MDTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.