Fort Peck Toe Drain Outfall Repair and Monitoring System

Agency: DEPT OF DEFENSE
State: Montana
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159613047111048
Posted Date: Oct 20, 2022
Due Date: Dec 6, 2022
Solicitation No: W9128F23B0002
Source: Members Only
Follow
Fort Peck Toe Drain Outfall Repair and Monitoring System
Active
Contract Opportunity
Notice ID
W9128F23B0002
Related Notice
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NWD
Office
W071 ENDIST OMAHA
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Presolicitation (Updated)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Updated Published Date: Oct 20, 2022 09:05 am CDT
  • Original Published Date: Oct 19, 2022 11:08 am CDT
  • Updated Response Date: Dec 06, 2022 12:00 pm CST
  • Original Response Date: Dec 06, 2022 12:00 pm CST
  • Inactive Policy: 15 days after response date
  • Updated Inactive Date:
  • Original Inactive Date:
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: Y1QA - CONSTRUCTION OF RESTORATION OF REAL PROPERTY (PUBLIC OR PRIVATE)
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Fort Peck , MT 59223
    USA
Description View Changes

PRESOLICITATION NOTICE: On or about 3 November 2022, a solicitation will be posted to SAM.GOV for the Fort Peck Toe Drain Outfall Repair and Monitoring System.



The contractor shall provide all personnel, equipment, tools, vehicles, supervision, and other items necessary to remove and replace the existing drain outfall perforated pipe and monitoring system at the downstream toe of the dam. The work will include but not limited to dewatering of the area if required, excavation, demolition, installation of new pipes, placement of new filter material, backfill, installation of manhole, and sodding and seeding.



The Contract Method: 2-Step IFB.



Tentative Site Visit Date and Time: 17-Nov-2022 / 1:00 PM MT Site Visit Location: Fort Peck Project Office Ft. Peck Montana.




Attachments/Links
Contact Information View Changes
Contracting Office Address
  • KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
  • OMAHA , NE 68102-4901
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Oct 19, 2022[Presolicitation (Original)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Nov 15, 2022[Solicitation (Original)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Jan 3, 2023[Solicitation (Updated)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Jan 5, 2023[Solicitation (Updated)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Jan 6, 2023[Solicitation (Updated)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Jan 19, 2023[Solicitation (Updated)] Fort Peck Toe Drain Outfall Repair and Monitoring System
Jan 30, 2023[Solicitation (Updated)] Fort Peck Toe Drain Outfall Repair and Monitoring System

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >