WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge

Agency:
State: Wyoming
Level of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD00159631424816880
Posted Date: Jan 17, 2024
Due Date: Jan 31, 2024
Source: Members Only
Follow
WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge
Active
Contract Opportunity
Notice ID
6982AF24SS0005
Related Notice
Department/Ind. Agency
TRANSPORTATION, DEPARTMENT OF
Sub-tier
FEDERAL HIGHWAY ADMINISTRATION
Office
6982AF CENTRAL FEDERAL LANDS DIVISI
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Sources Sought (Original)
  • All Dates/Times are: (UTC-07:00) MOUNTAIN STANDARD TIME, DENVER, USA
  • Original Published Date: Jan 17, 2024 02:13 pm MST
  • Original Response Date: Jan 31, 2024 02:00 pm MST
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Feb 15, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
  • NAICS Code:
    • 237310 - Highway, Street, and Bridge Construction
  • Place of Performance:
    Buffalo , WY
    USA
Description

THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.



THIS NOTICE IS BEING ISSUED TO DETERMINE IF THERE IS SUFFICIENT INTEREST FROM QUALIFIED PRIME CONTRACTORS who are small businesses, HUBZone small businesses, woman owned small business concerns, 8(a) small businesses, or service disabled veteran-owned small businesses and who intend to submit a bid for this solicitation to allow for a set-aside in one of these programs. Interested businesses must submit the following by e-mail to CFLAcquisitions@dot.gov (Attn: Denise Martinez) for receipt by close of business (2 p.m. local Denver time) on January 31, 2024:



(1) A positive statement of your intention to submit a bid for this solicitation as a Prime Contractor;



(2) A list of all confirmed socioeconomic categories (i.e., 8(a), small disadvantaged business, HUBZone small business, service-disabled veteran-owned small business, EDWOSB, or WOSB status) that apply to your business;



(3) A letter from a bonding agent stating your firm’s capability to bond for a single project of $2 million, and your firm’s aggregate bonding capacity; and



(4) Provide a list of road construction projects of equal or greater value and scope to the WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge project in which you performed bridge removal, placement of structural concrete, placement of prefabricated steel bridge, construction of micropiles. DO NOT SEND INFORMATION ON PROJECTS THAT DO NOT INCLUDE THE ABOVE WORK.



The size of a small business firm includes all parents, subsidiaries, affiliates, etc. Refer to the Code of Federal Regulations 13 CFR 121.103 for information on how the SBA determines affiliation and 13 CFR 121.108 regarding the penalties for misrepresentation of size status. All firms should be certified in the System for Award Management (SAM) located at https://www.sam.gov/



Project Details: WY FLAP JOH 14(1) North Fork Crazy Woman Creek Bridge



The Central Federal Lands Highway Division (CFLHD) of the Federal Highway Administration (FHWA), in cooperation with the U.S. Forest Service (USFS) and Johnson County, Wyoming, is proposing to replace the existing bridge structure on Crazy Woman Canyon Road/Route 33. The project road is classified as a rural recreational local road and is in mountainous terrain. The project scope includes the replacement of North Fork Crazy Woman Creek Bridge on Crazy Woman Canyon Road/Route 33, reconstruction of the roadway approaches on both ends of the bridge, object markers installed on the four corners of the bridge, and pullout improvements. The project consists of replacing an existing bridge structure on Route 33/Crazy Woman Canyon Road. The roadway portion will consist of aggregate surface course approaches required for raising the existing profile as well as reconditioning of a pull-off area near the bridge. The existing bridge removal will include existing superstructure and partial demolition of concrete caps (enough to allow new girder clearance). The proposed structure is a 14 feet wide and 51 feet long (out-out abutment) single span structure, leaving existing concrete/grouted riprap embankments in place and building new concrete caps directly behind existing caps after squaring off existing skew. The prefabricated bridge consists of rolled girders and structural steel decking with gravel deck surface similar to the approaches. New abutments are cast-in-place concrete caps and wingwalls supported by micropile foundations, no additional scour protection is assumed to be required with existing rock grouted embankments.



A temporary bridge or diversion is not required; however, the existing bridge to be replaced is load rated:




  • 2-3 Axles: 11T

  • 4-5 Axles: 12T

  • 6+ Axles: 13T

  • Semi-Truck: 20T

  • Tandem: 21T



Route 33/ Crazy Woman Canyon Road is geometrically tight west of the bridge location, it is not considered feasible to enter the project site from US-16.



PRINCIPAL WORK ITEMS:




  • Bridge Removal: 1 EA

  • Structural Concrete, Class A (AE): 20 CUYD

  • Prefabricated Steel Bridge (14’x49’): 1 EA

  • Micropile, 9-inch diameter: 320 LNFT



Bird surveys for active bird nests are required 14 days prior to vegetation removal if those activities occur between January 2 and August 31.



Potential overlap of construction with USFS planned structure replacements west of our project site. 2 residences located between the projects precluding concurrent closures.



Prefabricated bridge lead time has been considered in the estimated construction schedule.



It is anticipated this project will be advertised in September 2024, Award October 2024 and be under construction May 2025. The project has an estimated completion date of October 2025.



The estimated price range of the project work is between: $700,000 and $2,000,000.


Attachments/Links
Contact Information
Contracting Office Address
  • 12300 W. DAKOTA AVE
  • LAKEWOOD , CO 80228
  • USA
Primary Point of Contact
Secondary Point of Contact
History
  • Jan 17, 2024 02:13 pm MSTSources Sought (Original)

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >