Berlin Lake Sewer Treatment Plant Replacement
Agency: | DEPT OF DEFENSE |
---|---|
State: | Ohio |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159637145377038 |
Posted Date: | Apr 5, 2024 |
Due Date: | Apr 26, 2024 |
Solicitation No: | W911WN24SS8016 |
Source: | Members Only |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
- Contract Opportunity Type: Sources Sought (Original)
- All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
- Original Published Date: Apr 05, 2024 07:53 am EDT
- Original Response Date: Apr 26, 2024 05:00 pm EDT
- Inactive Policy: Manual
- Original Inactive Date: Oct 26, 2024
-
Initiative:
- None
- Original Set Aside:
- Product Service Code: Y1PD - CONSTRUCTION OF WASTE TREATMENT AND STORAGE FACILITIES
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Berlin Center , OH 44401USA
Berlin Lake Mill Creek Recreation Area – Wastewater Treatment Facility Replacement Project
Berlin Lake, Mahoning County, Ohio
The U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project to replace the existing Wastewater Treatment Facility (WWTF) at the location referenced above. Work is to be performed entirely on Government property which consists of a public campground, two USACE field offices, and the existing WWTF. The campground is open annually from mid-May to mid-September, while the two USACE field offices are open year-round. The Government currently operates the existing 30,000 gallon per day (gpd) WWTF year-round and will need continuous access and utility services to do so during the Project. The new prefabricated WWTP is to be constructed adjacent to the existing WWTP. Final conversation to the new prefabricated WWTP is required prior to demolition of the existing WWTP.
Major features and coordination efforts of the Project generally include, but are not limited to, the following:
- Installing a new, prefabricated pump station and force main line.
- Installing a new, prefabricated WWTF with appurtenances. The prefabricated WWTF (rated at 30,000 gpd) will utilize the extended aeration process and may have, among other features, a trash trap, flow equalization/aeration/clarifier/sludge holding/dosing tanks, fixed media and surface sand filtration, and UV disinfection.
- Renovating the existing WWTF control/laboratory building.
- Limited testing has been conducted and it is assumed that additional lead and asbestos testing/remediation may be required.
- Upgrading the existing power supply per local utility requirements and installation of a dedicated automatic emergency power generator.
- Installing gravel driveway for access and parking, lighting, and security fencing/gates.
- Reconfiguring portions of the existing sanitary sewer piping near the headworks and outfall manhole of the existing WWTF to accommodate the new hydraulic flow profile.
- Site grading, including erosion and sediment control, along with final restoration and landscaping at the WWTF.
- An Ohio Environmental Protection Agency (OPEA) Permit-to-Install (PTI) permit is being secured by the Government for the new WWTF and the contractor will have to comply with any OEPA requirements.
- Seamless switchover from the existing WWTF to the new prefabricated WWTF.
- Demolition and proper disposal of the existing WWTF and appurtenances.
- OEPA-licensed-operator startup and operation of the new WWTF for a limited duration, including training of the Government or other operators.
Physical construction and demolition for the Project is currently estimated to take place from May 2025 through October 2026 and campground operations throughout the year are assumed to remain unchanged.
Disposal of construction waste material will be disposed of at commercially permitted facilities licensed to accept waste or recyclable materials as applicable.
INTERESTED SOURCES MUST PROVIDE THE FOLLOWING INFORMATION:
Interested and capable sources are requested to provide complete responses with the following information to Aaron M. Barr, Contract Specialist, no later than 5:00 PM ET on 26 April 2024 by email at Aaron.M.Barr@usace.army.mil.
(1) Company/firm name and address
(2) Company/firm point of contact, telephone number and email address
(3) Company/firm cage code
(4) Company/firm business size, to include designation as large business, small business, HUBZone, 8(a), Service Disabled Veteran Owned Small Business, Small Disadvantaged Business or Women-Owned Business.
(5) All interested contractors should submit a narrative demonstrating their specialized experience in similar type contracts and past performance. Capability statements should include, bonding capacity, bonding availability, details of similar projects and the completion dates, and contract amounts for the similar projects listed.
If you have any questions, please contact me.
- WILLIAM S MOORHEAD FEDERAL BUILDING 1000 LIBERTY AVE
- PITTSBURGH , PA 15222-4198
- USA
- Aaron Barr
- aaron.m.barr@usace.army.mil
- Phone Number 4123957157
- CONNIE FERGUSON
- connie.l.ferguson@usace.army.mil
- Phone Number 4123957551
- Apr 05, 2024 07:53 am EDTSources Sought (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.