DD01-- EHRM Infrastructure Upgrades – Balcones Heights CBOC – Gold/Silver

Agency:
State: Texas
Level of Government: Federal
Category:
  • D - Automatic Data Processing and Telecommunication Services
Opps ID: NBD00159667535416250
Posted Date: May 5, 2023
Due Date: Jun 6, 2023
Solicitation No: 36C24W23Q0028
Source: Members Only
DD01-- EHRM Infrastructure Upgrades – Balcones Heights CBOC – Gold/Silver
Active
Contract Opportunity
Notice ID
36C24W23Q0028
Related Notice
Department/Ind. Agency
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Original Published Date: May 04, 2023 09:28 am CDT
  • Original Response Date: Jun 06, 2023 06:00 am CDT
  • Inactive Policy: Manual
  • Original Inactive Date: Aug 05, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
  • Product Service Code: DD01 - IT AND TELECOM - SERVICE DELIVERY SUPPORT SERVICES: ITSM, OPERATIONS CENTER, PROJECT/PM (LABOR)
  • NAICS Code:
    • 236220 - Commercial and Institutional Building Construction
  • Place of Performance:
    Balcones Heights CBOC Gold/Silver San Antonio , TX 78201
    USA
Description
South Texas Veterans Health Care System
7400 Merton Minter Blvd
San Antonio, TX 78229

LEASE AMENDMENT SCOPE OF WORK
EHRM INFRASTRUCTURE UPGRADES Balcones Heights CBOC Gold/Silver

PROJECT NO: 671-23-705GP1
PROJECT NAME: EHRM Infrastructure Upgrades Balcones Heights CBOC Gold/Silver
A site visit is scheduled for May 17th, 2023, at 10:00 AM CST at Balcones Heights CBOC Gold/Silver located at 4522 Fredericksburg Road, Suites A10-A6 & A88-A38, San Antonio, Texas 78201. Point of Contact: Alejandro Munoz, Healthcare Engineer, Phone: (210) 617-5300 ext.14633, Email: alejandro.munoz1@va.gov
1. GENERAL INTENT:

The Contractor shall provide design and construction work necessary at the Balcones Heights CBOC Gold/Silver located at 4522 Fredericksburg Road, Suites A10-A6 & A88-A38, San Antonio, Texas 78201 to support the Veterans Health Administration s (VHA) change to the new Electronic Health Record Management (EHRM). VHA requests the Contractor provide design and construction services to include all labor, materials, tools, equipment, transportation, supervision, and other services necessary to upgrade the leased property in accordance with this scope of work.

1.1 General Requirements

1.1.1 The Contractor shall provide design services and a complete design package containing drawings and specifications. The design drawings and specifications shall follow all applicable codes, manuals, standards, and guides, including those listed in Paragraph 4.
1.1.2 The Contractor shall provide construction services for the following infrastructure improvements, as necessary to meet listed requirements:
1.1.2.1 Electrical infrastructure including bonding and Building Management (BMS) interfaces to manage and monitor UPS.
1.1.2.2 HVAC infrastructure including temperature and humidity upgrades, rack and space sensors, and BMS interfaces to manage and monitor temperature and humidity.
1.1.2.3 Physical security upgrades including telecommunication room cameras, alarms, and necessary interfaces to existing security system. Location and quantities to be determined and approved during DID drawings review.
1.2 Design Effort

1.2.1 Contractor shall coordinate a Design Intent Drawings (DID) workshop with their respective design and construction team and VHA to develop, review, and complete final DIDs.

1.2.2 Design shall be completed in accordance with the schedule listed in Paragraph 3.

1.2.3 Contractor shall take meeting minutes and distribute meeting minutes to VA COR/LCO within three days of meeting. Meeting minutes shall be submitted by the Contractor and approved by VHA.

1.2.4 Contractor shall provide as-builts 15 days after final inspection approval by COR.

1.3 Clinic Operations
1.3.1 It is the Contractor s responsibility to provide a work plan allowing for continued operations of the CBOC. The VHA COR shall review and approve the work plan. The work plan may require after hours or weekend work.
1.3.2 Execute work to interfere as minimally as possible with normal functioning of the North Bexar OPC Clinic, including operations of utility services, fire protection systems and any existing equipment, and work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied by Veterans or VHA staff, except as approved by COR.
1.3.3 Do not store materials and equipment in other than assigned areas.
1.3.4 Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places as directed by Contractor and approved by VHA COR. All such actions shall be coordinated with the Contractor and VHA COR. Contractor shall submit a request to interrupt any such services to VHA COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption. Interruptions may have to be scheduled outside of normal CBOC operational hours.
1.3.4 The Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in CBOC operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that CBOC operations will continue during the construction period.
1.4 Testing

1.4.1 The Contractor shall provide a written testing plan in accordance with specifications and Building Industry Consulting Service International (BICSI) standards. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing testing. The Contractor shall document testing results and submit to VHA.
1.4.2 Contractor will coordinate final tests with VHA COR and conduct final tests in his/her presence. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.
1.5 Safety During Construction

1.5.1 The Contractor shall designate a minimum of one Site Safety and Health Officer (SSHO) at each project site that will be identified as the SSHO to administer the Contractor s safety program.

1.5.2 The designated SSHO must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State and local requirements are met for the project. As a minimum the SSHO must have completed the OSHA 30-hour Construction Safety class and have five (5) years of construction industry safety experience or three (3) years if he/she possesses a Certified Safety Professional (CSP) or certified Construction Safety and Health Technician (CSHT) certification or have a safety and health degree from an accredited university or college.

1.6 Infection Control

1.6.1 An Accident Hazard Analysis associated with infection control will be performed by the Contractor and VHA COR in accordance with FGI Guidelines (i.e., Infection Control Risk Assessment (ICRA)). The ICRA procedure found on the American Society for Healthcare Engineering (ASHE) website will be utilized. Construction Matrix (ashe.org)

1.6.2 The approved ICRA shall be reviewed and approved by the VHA Infection Prevention service and posted at the work site.

1.6.3 The Contractor shall implement all measures required by the ICRA.

2. STATEMENT OF WORK:

2.1 The Contractor shall ensure all below requirements from the VA Office of Electronic Healthcare Modernization Site Infrastructure and End User Device Requirements are met.

2.2 Local Area Network (LAN)

2.2.1 Reference: Infrastructure Standard for Telecommunications Spaces, Version 3.1, https://www.cfm.va.gov/til/dguide/OIT-InfrastrucStdTelecomSpaces.pdf.

2.2.12 Network Infrastructure devices supported by UPS and Emergency Power / Backup Generator as described below in 2.3.

2.3 Power

2.3.1 UPS Functional Requirements: This Scope of Work includes UPS requirements for OIT equipment only. All OIT equipment in the Telecommunications Room shall be connected to the UPS.

2.3.1.1 All UPS units supporting Information Technology infrastructure shall be functional and maintain a 10-minute run-time. Existing UPS to be reused; capability for remote monitoring to be installed by Contractor under this project.

2.3.1.2 UPS shall be managed and report the following information to a management system.

2.3.1.2.1 Overload
2.3.1.2.2 Battery Temperature High
2.3.1.2.3 Battery Charge Low
2.3.1.2.4 Battery Failure
2.3.1.2.5 Critical Condition (fan failure, low output voltage, etc)

2.3.1.3 UPS shall support both monitoring and remote management to include full compliance with RFC-1628 UPS Management Information Base Support for Simple Network Management Protocol (SNMP) v3.0, BaCnet and Modbus protocols.

2.3.1.4 UPS shall be connected to a monitoring system by Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).

2.3.2 Upstream bonding requirements to the Secondary Bonding Busbar or Primary Bonding Busbar must use two lugs. Bonding for telecommunications equipment must be performed per manufacturer's specifications. All grounding shall comply with ANSI/NECA/BICSI 607-C, Generic Telecommunications Bonding and Grounding (Earthing) for Customer Premises, November 2015.

2.4 Heating, Ventilation, and Air Conditioning (HVAC) Design Requirements

2.4.1 Reference: U.S. Department of Veterans Affairs Office of Construction & Facilities Management HVAC Design Manual, dated May 1, 2019, https://www.cfm.va.gov/til/dManual/dmHVAC.pdf.

2.4.2 Telecommunications Rooms, Class B space temperature range 41°F to 95°F, relative humidity: 8 to 80% noncondensing.

2.4.2.1 Temperature and humidity shall be monitored in proximity to the OIT equipment rack. Place sensors either on populated rack or within 6 feet of rack.

2.4.2.2 Temperature and humidity shall be connected to a monitoring system by Ethernet (wired or wireless) or serial interface (RS-232 or RS-485).

2.5 Physical Security Design Requirements

2.5.1 Reference: Infrastructure Standard for Telecommunications Spaces, https://www.cfm.va.gov/til/dManual/dmTelecomm.pdf.

2.5.2 Provide an electronic Security Management System (SMS) with a Physical Access Control System (PACS). The system shall be compatible with existing PACS, coordinate with COR and obtain approval from STXVHS police.

2.5.3 Doors shall include a mechanical spring loaded deadlocking feature (not separate deadbolt lock), PACS associate electronic Personal Identity Verification (PIV) card access device with keypad, electric strike and digital Closed Caption Television (CCTV) color camera routed to and directly controlled by the facility SMS.

2.5.4 Telecommunication Room security system shall be connected to a UPS or emergency backup power system.

2.5.5 Facility programmable door controller shall be fully functional in a standalone status if connection to the SMS is lost. Once the connection is restored, the local door control system shall update the SMS, regarding all operations that occurred after the connection was interrupted. Then, the SMS shall update the local door control units to current operational function.

2.5.6 The PACS and SMS shall be fully compliant with VA s PII, PIV "Smart" ID Card and at a minimum, FIPS 201-1 and NRTL (i.e., UL) listed and labeled.

2.6 Contractor Provided Equipment

2.6.1 Rack Sensor

2.6.1.1 Manufacturer: APC

2.6.1.2 Model: NetBotz Rack Sensor Pod 150 NBPD0150

2.6.2 IT Equipment Room CheckPoint Wireless Temperature and Humidity Sensor
2.6.2.1 Manufacturer: Medical Resources

2.6.2.2 Model: TEMP125

3. PERIOD OF PERFORMANCE:

3.1 Work timelines and completion progress shall be communicated to the COR for tracking purposes.

3.2 Work shall be completed in accordance with milestones in the following paragraph (project schedule table). Note: Completion date should be 6 months prior to station Go-Live date.
3.3 Work shall meet project milestones as outlined here.
Award
Day 0
Initial meeting with Gov t
Day 10
Schematic Design due to VA
Day 20
AE meeting (Schematic Design)
Day 25
35% Design due to VA
Day 40
AE meeting (35%)
Day 45
95% Design due to VA
Day 60
AE meeting (95%)
Day 65
100% Design due to VA
Day 70
AE meeting (100%)
Day 75
Final CD submission due to VA
Day 78
Gov t approves CD
Day 90
Construction Complete
Day 150

4. MANUALS, STANDARDS AND DESIGN GUIDES: The work will be completed in compliance with the following manuals, standards, and design guides. Where there appear to be contradictions, VA shall make a final determination on applicability of manuals, standards, and design guides.

4.1 VA OEHRM Site Infrastructure and End User Device (EUD) Requirements Version 2.0 (Attachment 1)

4.2 Infrastructure Standards for Telecommunications Spaces Version 3.1 (dated July 1, 2021)

4.3 HVAC Design Manual (dated November 1, 2017 with Rev dated March 1, 2020)

5. GENERAL REQUIREMENTS FOR PRIVACY INFORMATION:

Information Systems Officer, Information Protection: The contractor will not have access to VA Desktop computers, nor will they have access to online resources belonging to the government while conducting services.

Privacy Officer: The contractor will not have access to Patient Health Information (PHI) nor will they have the capability of accessing patient information during the services provided to the VA.

Records Manager:Â There will be no federal records created, maintained, used or dispositioned with this contract; regardless of format [paper, electronic, etc.] or mode of transmission [e-mail, fax, etc.].
Attachments/Links
Attachments

Contact Information
Primary Point of Contact
Secondary Point of Contact


History

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >