Forest Road 10 Culvert Replacements Green Mountain National Forest
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Vermont |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159672412707945 |
Posted Date: | Nov 30, 2022 |
Due Date: | Dec 12, 2022 |
Solicitation No: | 12445523R0001 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Updated Published Date: Nov 30, 2022 10:17 am CST
- Original Published Date: Nov 02, 2022 01:06 pm CDT
- Updated Date Offers Due: Dec 12, 2022 01:00 pm CST
- Original Date Offers Due: Dec 05, 2022 01:00 pm CST
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Dec 27, 2022
- Original Inactive Date: Dec 20, 2022
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Y1LB - CONSTRUCTION OF HIGHWAYS, ROADS, STREETS, BRIDGES, AND RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Rutland , VT 05701USA
The puprpose of amendment 0001 is to add the scope of work and supplemental specifications (both in one document).
Green Mountain National Forest in Bennington and Rutland Counties Vermont. The project will require all transportation, material, labor, supervision, equipment, operators, tools, supplies, licenses, permits and other incidentals as required.a.The Forest Road 10 –8.4 Culvert Replacement work shall include, but is not limited to, the removal/transportation/unloading of temporary bridge and abutments, excavation, removal of existing culvert, layout and construction of the cast-in-place concrete abutments, furnishing, fabricating, preparing, assembling and erecting the new metal culvert, associated backfill and embankment construction, guardrail installation and associated road and site work. b.The Forest Road 10 –11.53 Culvert Replacement work shall include, but is not limited to, excavation, removal of existing culvert, layout, furnishing, fabricating, preparing, assembling and erecting the new precast culvert, associated backfill and embankment construction, guardrail installation and associated road and site work. Interested contractors may view the two locations. Directions to the two locations are:FR 10-8.4FROM THE INTERSECTION OF US-7 AND VT-11 E, TRAVEL EAST ALONG VT-11 E FOR 8.4 MILES. TAKE A SLIGHT LEFT ONTO MAIN ST. FOR .3 MILES. TAKE A SLIGHT LEFT ONTO HAPGOOD POND RD. FOR 3.7 MILES. TURN LEFT ONTO LANDGROVE RD. FOR .6 MILES. TURN LEFT ONTO LITTLE MICHIGAN RD. FOR .4 MILES. TURN RIGHT ONTO FOREST ROAD 10 FOR 4.9 MILES TO REACH THE CULVERT LOCATED AT MILE POST 8.4. 43°20'27" N, 72°52'44" W.FROM THE INTERSECTION OF VT-155 S AND VT-100 S, TRAVEL SOUTH ALONG VT-100 S FOR 3.4 MILES. TURN RIGHT ONTO LAWRENCE HILL ROAD FOR .3 MILES. TURN LEFT ONTO LANDGROVE ROAD FOR 4 MILES. TURN RIGHT ONTO LITTLE MICHIGAN RD. FOR .4 MILES. TURN RIGHT ONTO FOREST ROAD 10 FOR 4.9 MILES TO REACH THE CULVERT LOCATED AT MILE POST 8.4. 43°20'27" N, 72°52'44" W.FR 10-11.53
FROM THE INTERSECTION OF US-7 AND VT-11 E, TRAVEL EAST ALONG VT-11 E FOR 8.4 MILES. TAKE A SLIGHT LEFT ONTO MAIN ST. FOR .3 MILES. TAKE A SLIGHT LEFT ONTO HAPGOOD POND RD. FOR 3.7 MILES. TURN LEFT ONTO LANDGROVE RD. FOR .6 MILES. TURN LEFT ONTO LITTLE MICHIGAN RD. FOR .4 MILES. TURN RIGHT ONTO FOREST ROAD 10 FOR 2.2 MILES TO REACH THE CULVERT LOCATED AT MILE POST 11.53. 43°17'53' N, 72°53'02" W.FROM THE INTERSECTION OF VT-155 S AND VT-100 S, TRAVEL SOUTH ALONG VT-100 S FOR 3.4 MILES. TURN RIGHT ONTO LAWRENCE HILL ROAD FOR .3 MILES. TURN LEFT ONTO LANDGROVE ROAD FOR 4 MILES. TURN RIGHT ONTO LITTLE MICHIGAN RD. FOR .4 MILES. TURN RIGHT ONTO FOREST ROAD 10 FOR 2.2 MILES TO REACH THE CULVERT LOCATED AT MILE POST 11.53. 43°17'53' N, 72°53'02" W.CONTRACTOR QUALIFICATIONS:Interested parties are advised that registration in the System for Award Management (SAM) database is required prior to award of a contract. There is no cost for registration in SAM when registration is completed on the official SAM website (www.sam.gov).SET-ASIDE:This procurement will beset-aside 100% for small business concerns. The NAICS code is NAICS 237310 Highway, Street, and Bridge ConstructionTheSmall Business size standard is $39.5Million.SOLICITATION DOCUMENTS:The solicitation and related documents will only be available on this website. The anticipated contract magnitude is between $500,000 and $1,000,000.All questions regarding this solicitation shall be emailed to the Contracting Officer, Clark Bartelt, clark.a.bartelt@usda.gov
Document | File Size | Access | Updated Date |
|
20 KB
|
Public |
Nov 30, 2022
|
|
42 KB
|
Public |
Nov 28, 2022
|
|
82 KB
|
Public |
Nov 28, 2022
|
|
133 KB
|
Public |
Nov 03, 2022
|
|
18 MB
|
Public |
Nov 02, 2022
|
|
10 MB
|
Public |
Nov 02, 2022
|
|
126 KB
|
Public |
Nov 02, 2022
|
|
96 KB
|
Public |
Nov 02, 2022
|
|
12 KB
|
Public |
Nov 02, 2022
|
|
12 KB
|
Public |
Nov 02, 2022
|
- 1720 Peachtree ST NW STE 876S
- Atlanta , GA 303092449
- USA
- Clark A. Bartelt
- clark.a.bartelt@usda.gov
- Phone Number 2186264353
- Jeremy Krohn
- jeremy.krohn@usda.gov
- Nov 30, 2022 10:17 am CSTSolicitation (Updated)
- Nov 28, 2022 09:58 am CST Solicitation (Updated)
- Nov 03, 2022 07:16 am CDT Solicitation (Updated)
- Nov 02, 2022 01:06 pm CDT Solicitation (Original)
- Oct 17, 2022 10:19 am CDT Presolicitation (Updated)
Related Document
Oct 17, 2022 | [Presolicitation (Updated)] Forest Road 10 Culvert Replacements Green Mountain National Forest |
Nov 2, 2022 | [Solicitation (Original)] Forest Road 10 Culvert Replacements Green Mountain National Forest |
Nov 3, 2022 | [Solicitation (Updated)] Forest Road 10 Culvert Replacements Green Mountain National Forest |
Nov 28, 2022 | [Solicitation (Updated)] Forest Road 10 Culvert Replacements Green Mountain National Forest |
Dec 6, 2022 | [Solicitation (Updated)] Forest Road 10 Culvert Replacements Green Mountain National Forest |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.