Moyer Bridge Installation - Salmon-Challis National Forest
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | Idaho |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159687996495765 |
Posted Date: | Aug 14, 2023 |
Due Date: | Aug 30, 2023 |
Solicitation No: | 1282B123R0077 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Original)
- All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Original Published Date: Aug 14, 2023 01:37 pm CDT
- Original Date Offers Due: Aug 30, 2023 01:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Original Inactive Date: Sep 14, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: Z1LB - MAINTENANCE OF HIGHWAYS/ROADS/STREETS/BRIDGES/RAILWAYS
-
NAICS Code:
- 237310 - Highway, Street, and Bridge Construction
-
Place of Performance:
Salmon , ID 83467USA
This Solicitation replaces Notice ID: 1282B123R0057 under Solicitation No. 1282B123R0057 that was originally a HUBZone set-aside.
This Solicitation is a Total Small Business set-aside.
The Salmon-Challis National Forest has an Aquatic Organism Passage project to replace an existing ford with a bridge. Work includes channel restoration, installation of a government furnished bridge on contractor provided abutments and the construction of bridge approach roadways. Rock and aggregate materials are available from government sources. Alternate (Commercial) sources proposed by the contractor will need to be approved for material suitability and weed free nature of the source. The contractor is responsible for the acquisition of the abutment materials per the attached plans and specifications along with the erection of the abutments.
Government furnished materials are located at 3 locations in the vicinity of the project. The prefabricated bridge will be staged in Salmon, Idaho. The contractor is responsible for transporting the bridge to the work site. An instream work window of 7/15 to 8/15 has been established. All work within the ordinary high-water mark including de-watering, excavation and backfill, channel restoration and re-watering of the channel shall occur within this window.
Refer to the attached Schedule of Items, Statement of work, Prelim Moyer Creek FSSS, Moyer Creek Final Drawings, Project Design features, , Moyer Creek Bridge Shop Drawings, Moyer Access map and Materials vicinity maps for specifications, drawings, requirements and locations.
There is no Pre-Proposal site visit is planned. The location is open to the public and Offers are encouraged to visit the site on thier own. If there are questions, refer to the Q & A Moyer Site Visit_6.28.23 document and any further quesitons shall be addressed to Susan Kunath, Contract Specialist at susan.j.kunath@usda.gov .
Proposals are due: August 30, 2023 at 1:00 p.m. CT. and are to be sent electronically to : Susan Kunath at susan.j.kunath@usda.gov. with the Offers name and Moyer Bridge in the subject line.
Government's Contracting Point of Contact:
Susan Kunath
email: susan.j.kunath@usda.gov
- SPOC Intermountain 1400 INDEPENDENCE AVE SW, MS-1138
- Washington , DC 202500001
- USA
- Susan Kunath
- susan.j.kunath@usda.gov
- Aug 14, 2023 01:37 pm CDTSolicitation (Original)
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.