J046--688-23-4-478-0087 | Storm and Sanitary Sewer Maintenance | DCVAMC Base + 4 Options

Agency: VETERANS AFFAIRS, DEPARTMENT OF
State: Washington
Level of Government: Federal
Category:
  • J - Maintenance, Repair, and Rebuilding of Equipment
Opps ID: NBD00159711669334875
Posted Date: Jul 26, 2023
Due Date: Aug 7, 2023
Solicitation No: 36C24523Q0883
Source: Members Only
Follow
J046--688-23-4-478-0087 | Storm and Sanitary Sewer Maintenance | DCVAMC Base + 4 Options
Active
Contract Opportunity
Notice ID
36C24523Q0883
Related Notice
Department/Ind. Agency
VETERANS AFFAIRS, DEPARTMENT OF
Sub-tier
VETERANS AFFAIRS, DEPARTMENT OF
Office
245-NETWORK CONTRACT OFFICE 5 (36C245)
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information View Changes
  • Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Updated Published Date: Jul 26, 2023 12:15 pm EDT
  • Original Published Date: Jul 17, 2023 08:43 am EDT
  • Updated Date Offers Due: Aug 07, 2023 10:00 am EDT
  • Original Date Offers Due: Jul 28, 2023 10:00 am EDT
  • Inactive Policy: Manual
  • Updated Inactive Date: Sep 06, 2023
  • Original Inactive Date: Aug 27, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: J046 - MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT
  • NAICS Code:
    • 562998 - All Other Miscellaneous Waste Management Services
  • Place of Performance:
    Department of Veterans Affairs VAMC Washington , 20422
Description View Changes
Storm Sewers

Scope: Provide all materials, equipment, supervision, and labor to vacuum and power jet storm sewer sites on an annual basis. Areas included will be all parking lots and roadways including all catch basins and manholes.

Frequency: Annually in November/December. Invoices billed at the end of service.

Hours of Work: Work to be performed during the hours of 7:00 AM to 3:30 PM, Monday thru Friday. Work to be performed annually in late November to early December when all leaves are down. Work will be scheduled in advance through the COR. COR to determine if/when ground conditions are able to support service equipment.

PM Procedures:

Working from a site map of facility, provided by the COR, the Contractor will start from the furthest point at the facility Storm Sewer (unless directed differently) and work towards the main deposit storm sewer area leading off of the facility grounds.

Remove grating or cover to gain access to storm sewer. Vacuum all heavy debris from access point. Power-jet lines to ensure free flow to next access point. Replace cover.

Contractor will review progress and each day finding with Plumbing Shop Foreman or Plumbing Shop Leader.

Debris collected at the end of each day can be deposited at an area designated by Chief, Operations Section, as coordinated by the Plumbing Shop Foreman in advance of scheduled service date.

Contractor will get water for the power jetting truck from designated areas set by the Plumbing Shop COR.

Sanitary Sewers

Scope: Provide all materials, equipment, supervision, and labor to jet and/or snake sewer main discharges on wings B, C, D and E inside and outside and Laterals and Stacks (on a as needed basis) in all buildings. (Bldg. 1, 4 6, 14, 16)
Hours of Work: Work to be performed during the hours of 7:00 AM to 3:30 PM, Monday thru Friday. Unless contacted outside of normal business hours.

PM Procedures:

Working from a site map of facility, provided by the COR, the Contractor will start from the furthest point at the facility Sanitary Sewer (unless directed differently) and work towards the main deposit sanitary sewer areas leading off of the facility grounds.

Reports: Contractor will provide a copy of service report to the COR. Report will include a list of all areas completed, any identified problems and/or deficiencies found and an number of debris removed in cubic yards for the purpose of meeting District of Columbia Water and Sewer Authority requirements for storm water management. Service reports must be signed by both service provider and COR at completion of work. An electronic version of same shall be sent to the COR.
Attachments/Links
Contact Information
Contracting Office Address
  • 8849 International Drive Suite 215
  • LINTHICUM , MD 21090
  • USA
Primary Point of Contact
Secondary Point of Contact


History

Related Document

Jul 17, 2023[Combined Synopsis/Solicitation (Original)] J046--Storm and Sanitary Sewer Maintenance DC VAMC

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >