Stormwater Drainage Pipes Survey
Agency: | |
---|---|
State: | Florida |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159878105561589 |
Posted Date: | May 31, 2023 |
Due Date: | Jun 30, 2023 |
Solicitation No: | FA481923QA037 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Combined Synopsis/Solicitation (Updated)
- All Dates/Times are: (UTC-05:00) CENTRAL STANDARD TIME, CHICAGO, USA
- Updated Published Date: May 31, 2023 12:26 pm CDT
- Original Published Date: May 31, 2023 09:29 am CDT
- Updated Date Offers Due: Jun 30, 2023 01:00 pm CDT
- Original Date Offers Due: Jun 30, 2023 01:00 pm CDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jul 15, 2023
- Original Inactive Date: Jul 15, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5630 - PIPE AND CONDUIT, NONMETALLIC
-
NAICS Code:
- 237110 - Water and Sewer Line and Related Structures Construction
-
Place of Performance:
Panama City , FL 32405USA
The intent of this project is to clean and evaluate for repair approximately 3,400 LF of 48” degraded Reinforced Concrete Pipe(RCP) and approximately 800 LF of 30” degraded RCP on Tyndall AFB. Cleaning/evaluation will also include associated storm manholes and collectors and tributary entry points of miscellaneous lines to the above manholes and collectors. It is suspected that pipe joints and possible fractures are allowing infiltration of ground waters and that these points are a probable cause of localized sink holes. Past drainage studies note several areas where sinkholes and piping are evident, some of the sinkholes may have increased in size and/or may have been temporarily filled with soils as a interim safety measure. In event that collapsed sections are observed, those sections may be replaced under separate contract - this contract does not include full pipe section replacement, nor does it include any repairs. It is unknown if any asbestos containing material (ACM) or if clay pipe was incorporated into this system. Mortar type and quantity is unknown but it is suspected that loose and missing mortar at the joints are a contributing factor to infiltration and exfiltration, which this inspection and evaluation is meant to address. Previous repair status is also unknown. Contractor shall be responsible for verification of all existing conditions and utilities and access protocols prior to execution of the work. Some of the work may require access to the WSEP ramp and field between the WSEP Ramp and Taxiway Papa.
There will be a site visit scheduled June 20, 2023
Questions Due: No later than 1:00 PM CST, 26 June 2023
Quote Due Date: No later than 1:00 PM CST, 30 June 2023
- 2LT Kenneth Lewter
- kenneth.lewter.1@us.af.mil
- Nelson Kraemer
- nelson.kraemer@us.af.mil
- May 31, 2023 12:26 pm CDTCombined Synopsis/Solicitation (Updated)
- May 31, 2023 09:29 am CDT Combined Synopsis/Solicitation (Original)
Related Document
Jun 14, 2023 | [Solicitation (Original)] Stormwater Drainage Pipes Survey-Tyndall AFB |
Jun 15, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
Jun 16, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
Jun 26, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
Jun 29, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
Jul 12, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
Jul 14, 2023 | [Combined Synopsis/Solicitation (Updated)] Stormwater Drainage Pipes Survey |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.