Material and Installation of Data Drops for AAR
Active
Contract Opportunity
Notice ID
70LGLY24QSSB00043
Related Notice
Department/Ind. Agency
HOMELAND SECURITY, DEPARTMENT OF
Sub-tier
FEDERAL LAW ENFORCEMENT TRAINING CENTER
Office
FLETC GLYNCO PROCUREMENT OFFICE
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-04:00) EASTERN STANDARD TIME, NEW YORK, USA
  • Original Published Date: Mar 28, 2024 11:18 am EDT
  • Original Date Offers Due: Apr 15, 2024 10:00 am EDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Apr 30, 2024
  • Initiative:
    • None
Classification
  • Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
  • Product Service Code: N059 - INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS
  • NAICS Code:
    • 238210 - Electrical Contractors and Other Wiring Installation Contractors
  • Place of Performance:
    Brunswick , GA 31524
    USA
Description

Statement of Work



For



Installation of Data Drops to Support AAR Camera



System at Building 381 at Glynco, GA.






  1. Background



This Statement of Work (SOW) establishes and defines the requirements for the engineering, furnishing, installation, testing and documentation of inside and outside plant fiber optic and copper cabling at Glynco, GA.




  1. Scope of Work



The contractor shall provide all personnel, equipment, tools, materials, supervision, and all other components necessary to install, test and document inside and outside plant fiber optic and copper cabling at Glynco, GA. All work performed in the design and installation shall conform to BICSI (Building Industry Consulting Services International) specifications to ensure consistency with current codes, standards, and regulations. The following BICSI publications apply. Outside Plant Design Reference Manual, 4th Edition and Telecommunications Distribution Methods Manual, 12th edition.




  1. General.


    1. Cable Testing. All copper cables will be tested in accordance with BICSI specifications to insure no damage has occurred to the cable during installation. All copper cables shall be tested for cable faults prior to and after installation has been completed. If the cable is damaged during installation, the contractor shall replace the cable with one that is undamaged. All cable terminals and information boxes interface units shall be labeled with machine-generated labels. All cables shall be labeled at all termination points, building entrance terminals, patch panels, manholes, hand holes, and at all splice entrance/exit points.

    2. Site Restoration. All non-paved surfaces (grass, sod, gravel, etc.) must be restored within 7 days. Trenches and splice pits must be mechanically compacted to compensate for future earth settlement. All roads, streets, sidewalks of concrete or asphalt construction must be restored or repaved within 3 days from the time of backfilling and compaction.

    3. Grounding. Contractor shall ensure all equipment are secured and grounded to industry standards.



  2. Description of Tasks

    1. Task 1: Material to Install Data Drops to Support AAR Camera System into Building 381 at Glynco, GA.

      1. List of materials to be provided by the contractor

      2. Approximately 4000’ of CAT 6 Cable (Blue)

      3. One (1) 24 Port Rack Mounted CAT 6 Patch panel

      4. Fourteen (14) RJ-45 Connectors

      5. Cable tags

      6. Other supplies as needed



    2. Task 2: Install 14 Single Data Drops to Support AAR Camera System into Building 381 at Glynco, GA.

      1. Contractor shall provide and install one (1) 24 Port Rack Mounted CAT 6 Patch panel into It closet of building 381.

      2. Contractor shall install four single computer data drops on the 1st floor wall near the HVAC closet at section A of building 381.

      3. Contractor shall provide and install camera data drops between the Cat6 patch panel and into interviewing rooms AA1, AB1, BA1, BB1, CA1, , CA2, CB1, CB2, AA2, AB2, BA2 and BB2 on the ceiling opposite corners, of building 381. (For Cameras). Per attached building drawing.

      4. Contractor shall provide and install RJ-45 connectors onto each of the twelve camera drops in the interview rooms.

      5. Contractor can use vacant existing data cables where available.

      6. Contractor shall test all data drops for cable faults and errors.

      7. Contractor shall label all data drops at the patch panel and outlet boxes





  3. Deliverables

    1. Equipment

    2. All equipment identified in 4.1



  4. Documents



Copper Cable Testing Results from Task 2




  1. Period of Performance.



Period of performance for this contract is not to exceed 15 days from contract award date.






  1. Contract Type



This contract shall be a firm fixed price contract.




  1. Place of Performance



All Tasks work shall be performed at the Federal Law Enforcement Training Centers; US Department of Homeland Security; 1131 Chapel Crossing Road, Brunswick, Ga 31524




  1. Section 508 Requirements (include in the SOW, PWS, or SOO)



Section 508 of the Rehabilitation Act (classified to 29 U.S.C. § 794d) requires that when Federal agencies develop, procure, maintain, or use information and communications technology (ICT), it shall be accessible to people with disabilities. Federal employees and members of the public with disabilities must be afforded access to and use of information and data comparable to that of Federal employees and members of the public without disabilities.



All products, platforms and services delivered as part of this work statement that, by definition, are deemed ICT shall conform to the revised regulatory implementation of Section 508 Standards, which are located at 36 C.F.R. § 1194.1 & Appendixes A, C & D, and available at https://www.ecfr.gov/cgi-bin/text-x?SID=e1c6735e25593339a9db63534259d8ec&mc=true&node=pt36.3.1194&rgn=div5. In the revised regulation, ICT replaced the term electronic and information technology (EIT) used in the original 508 standards. ICT includes IT and other equipment.



Exceptions for this work statement have been determined by DHS and only the exceptions described herein may be applied. Any request for additional exceptions shall be sent to the Contracting Officer and a determination will be made according to DHS Directive 139-05, Office of Accessible Systems and Technology, dated November 12, 2018, and DHS Instruction 139-05-001, Managing the Accessible Systems and Technology Program, dated November 20, 2018, or any successor publication.


Attachments/Links
Contact Information
Contracting Office Address
  • 1131 CHAPEL CROSSING ROAD
  • Brunswick , GA 31524
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Mar 28, 2024 11:18 am EDTSolicitation (Original)

Related Document

Mar 29, 2024[Solicitation (Updated)] Material and Installation of Data Drops for AAR
Apr 2, 2024[Solicitation (Updated)] Material and Installation of Data Drops for AAR
Apr 3, 2024[Solicitation (Updated)] Material and Installation of Data Drops for AAR