Boardwalk Building Materials
Agency: | AGRICULTURE, DEPARTMENT OF |
---|---|
State: | California |
Level of Government: | Federal |
Category: |
|
Opps ID: | NBD00159987397557367 |
Posted Date: | Jun 30, 2023 |
Due Date: | Jul 7, 2023 |
Solicitation No: | 127EAS23Q0077 |
Source: | Members Only |
Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.
- Contract Opportunity Type: Solicitation (Updated)
- All Dates/Times are: (UTC-07:00) PACIFIC STANDARD TIME, LOS ANGELES, USA
- Updated Published Date: Jun 30, 2023 01:19 pm PDT
- Original Published Date: Jun 22, 2023 02:14 pm PDT
- Updated Date Offers Due: Jul 07, 2023 03:00 pm PDT
- Original Date Offers Due: Jul 07, 2023 03:00 pm PDT
- Inactive Policy: 15 days after date offers due
- Updated Inactive Date: Jul 22, 2023
- Original Inactive Date: Jul 22, 2023
-
Initiative:
- None
- Original Set Aside: Total Small Business Set-Aside (FAR 19.5)
- Product Service Code: 5340 - HARDWARE, COMMERCIAL
-
NAICS Code:
- 332510 - Hardware Manufacturing
-
Place of Performance:
Quincy , CA 95971USA
6/30/2023 - Amendment posted with brief Q&A, see Attachments section to download. This amendment does not extend the due date.
Please see the Attachments section to download full solicitation information, including how to submit your quote.
The Plumas National Forest requires the following list of building materials for in-house construction of a boardwalk trail in a wetland area. The Diamond Piers are a brand name requirement as they must interconnect with the existing trail. Other items can be any brand conforming to the listed specifications.
- Diamond Piers (x54)
- Steel Pins (x216)
- Header Beams Doug Fir 4”x10”x4’ (x25)
- Header Beams Doug Fir 4”x10”x7’ (x4)
- ½”x4 ½” Bolt (x108)
- ½” Nut (x108)
- ½” Oversize Washer (x216)
- Pressure Treated Wood Stringers 3”x6”x8.5’ (x88)
- 3/8”x6” Carriage Bolts (x162)
- 3/8” Nut (x162)
- 3/8” Oversize Washer (x324)
- Hurricane Ties (x324)
- 12” Brackets (x20)
- 1 ¼” Cabinet Screws (x14 boxes of 100)
- 4”x7/8” L Brackets (x22)
- 5/8” x 3 ½” Lag Bolt, Hex Head (x22)
- ½”x4 ½” Hex Head (x22)
- ½” Nut (x22)
- ½” Oversize Washer (x22)
- Blocking Doug Fir 2”x6”x8’ (x10)
- 3 ½” Screws (x200)
- Decking Doug Fir 2”x6”x4’ (x364)
- Decking Doug Fir 2”x6”x7’ (x30)
- 5” Heavy Duty Structural Screws (x1400)
- Bull Rail- Doug Fir 4”x4”x10’ (x40)
- Spacers/Scupper Doug Fir 2”x4”x16’(x15)
- Continuous Curb- Doug Fir 2”x4”x16’ (x25)
- ½”x10” Carriage Bolt (x240)
- ½” Nut (x240)
- ½” Washer (x240)
Delivery Date and Delivery Location
Full service delivery (driver unloads with own equipment) is required by August 15, 2023 to:
Attn: Alex Terry
Plumas National Forest
39696 Highway 70
Quincy CA 95971
- 333 Broadway BLVD SE
- Albuquerque , NM 871023498
- USA
- Sarah Hill, Contracting Officer
- sarah.hill@usda.gov
- Phone Number 530.559.4401
- Jun 30, 2023 01:19 pm PDTSolicitation (Updated)
- Jun 22, 2023 02:14 pm PDT Solicitation (Original)
Related Document
Jun 23, 2023 | [Solicitation (Original)] Boardwalk Building Materials |
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.