Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

Agency: DEPT OF DEFENSE
State: Montana
Level of Government: Federal
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD00159999511271795
Posted Date: Feb 27, 2023
Due Date: Mar 30, 2023
Solicitation No: W9128F23R0009
Source: Members Only
Follow
Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Active
Contract Opportunity
Notice ID
W9128F23R0009
Related Notice
W9128F23R0009
Department/Ind. Agency
DEPT OF DEFENSE
Sub-tier
DEPT OF THE ARMY
Major Command
USACE
Sub Command
NWD
Office
W071 ENDIST OMAHA
Looking for contract opportunity help?

Procurement Technical Assistance Centers (PTACs) are an official government contracting resource for small businesses. Find your local PTAC (opens in new window) for free government expertise related to contract opportunities.

General Information
  • Contract Opportunity Type: Solicitation (Original)
  • All Dates/Times are: (UTC-06:00) CENTRAL STANDARD TIME, CHICAGO, USA
  • Original Published Date: Feb 27, 2023 02:54 pm CST
  • Original Date Offers Due: Mar 30, 2023 02:00 pm CDT
  • Inactive Policy: 15 days after date offers due
  • Original Inactive Date: Apr 14, 2023
  • Initiative:
    • None
Classification
  • Original Set Aside:
  • Product Service Code: Z1KA - MAINTENANCE OF DAMS
  • NAICS Code:
    • 237990 - Other Heavy and Civil Engineering Construction
  • Place of Performance:
    Fort Peck , MT 59223
    USA
Description

On 27 February 2023, the U.S. Army Corps of Engineers (USACE), Omaha District (NWO), is pursuing to award a contract to refurbish the eighteen (18} foot diameter spiral case inlet butterfly valves (BFVs) and associated systems for the two (2) generator units for Powerhouse 2 at Fort Peck Dam located near Glasgow, MT. This includes associated equipment such as valve operators (hydraulic cylinder), bypass piping and valves, spiral case and tunnel drain valves, valve access hatches and maintenance platforms, hydraulic power units (HPUs} and BFV controls. Non­destructive examination (NDE) of the penstock tunnels will also be required to assess tunnel wall corrosion.



The BFVs will be refurbished in-place to improve internal bypass leakage on units 4 and 5 valve discs and address component end of life and system reliability. Refurbish existing bronze disc seals with new stainless steel mounting/adjusting hardware and o-rings, address coating deterioration and corrosion by sand blasting and recoating, perform non-destructive examination (NDE) of discs after blast and prior to re-coating, and replace BFV shaft and thrust bearings. Refurbished penstock BFV systems should be functional with limited maintenance required for a 50-year life. This contract may also include optional bid items to conduct paint repairs on the exterior of the penstocks and weld repairs on the valve discs.



The contractor will be required to provide and implement proper PPE as necessary throughout the duration of the project. Contractor will be required to provide all equipment and certifications / licensure necessary to complete this project.

Small Businesses are reminded under FAR 52.219-14, Limitations on Subcontracting that they must perform at least 15% of the cost of the contract, not including cost of materials, with their own employees for general construction-type procurement.



**NOTE** Bidder Inquiry is open when the Solicitation is posted.**


Attachments/Links
Contact Information
Contracting Office Address
  • KO CONTRACTING OFFICE 1616 CAPITOL AVENUE
  • OMAHA , NE 68102-4901
  • USA
Primary Point of Contact
Secondary Point of Contact
History

Related Document

Oct 31, 2022[Special Notice (Original)] Fort Peck Butterfly Valves Virtual Industry Day
Nov 14, 2022[Special Notice (Updated)] Fort Peck Butterfly Valves Virtual Industry Day
Dec 5, 2022[Special Notice (Updated)] Fort Peck Butterfly Valves Virtual Industry Day
Feb 6, 2023[Presolicitation (Original)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Feb 28, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 3, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 15, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 17, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 20, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 24, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Mar 31, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Apr 5, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2
Apr 10, 2023[Solicitation (Updated)] Fort Peck Butterfly Valve Rehabilitation Powerhouse 2

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >