Project 23-601.20 N Roof MSI Building – Replace Air Cooled Chiller
Agency: | State Government of Connecticut |
---|---|
State: | Connecticut |
Level of Government: | State & Local |
Category: |
|
Opps ID: | NBD00170413245269272 |
Posted Date: | Oct 25, 2023 |
Due Date: | Nov 20, 2023 |
Solicitation No: | UCHC4-178521127 |
Source: | Members Only |
This project is located at the UConn Musculoskeletal Institute, 120 Dowling Way, Farmington, CT and involves the removal and installation of an air cooled chiller on the MSI building roof (Building N), replacement of the chilled glycol pumps in the ceiling below and associated VFDs, and replacement of the glycol feed system in the 1st Floor Mechanical Room. Modifications to the controls are anticipated to integrate the replaced equipment as are modifications to the power feeds to serve the replaced equipment. Structural modifications to accommodate the new chiller are needed. A plan to replace the chiller over a set schedule of days should be anticipated. Similarly, a plan to replace the system pumps one at a time to maintain one active should be anticipated. All shutdowns and downtime needs to be carefully coordinated with UHC staff. The chiller has been pre-purchased by UHC. The contractor shall assume delivery and installation of the chiller.
Start Date: Oct 25, 2023
End Date: Nov 20, 2023
UConn Health Center
TRY FOR FREE
Not a USAOPPS Member Yet?
Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.