Engineering and Alternative Analysis of Vault Restroom Systems and Facilities and Construction Ready Documents

Agency: Boulder County
State: Colorado
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD10626589285701515
Posted Date: Oct 20, 2023
Due Date: Nov 14, 2023
Solicitation No: Notes RFP-004-23
Source: Members Only
Engineering and Alternative Analysis of Vault Restroom Systems and Facilities and Construction Ready Documents
Details
Due Date: 11/14/2023 2:00 pm
Bidding Number: Notes RFP-004-23
Bidding Categories: Parks and Open Space
Pre-bid Date and Time: 10/30/2023 10:00 am
Pre-bid Location:

Pella Crossing Open Space Trailhead – 11420 N. 75th Street, Hygiene, Co 80533

Bids from firms not represented and signed in at the mandatory pre-bid meeting will not be accepted.

Other Comments:

Project Description:

The Boulder County Parks & Open Space Department (BCPOS) is seeking proposals from qualified and experienced contractors to secure engineering services for performance and alternative engineering analysis of BCPOS’ public use trailhead no-flush evaporative vault restroom systems. The selected contractor will also conduct research on alternative restroom wastewater systems and provide an analysis of those systems against BCPOS’ existing facilities. Additionally, the selected contractor will provide structural and technical engineering review of BCPOS’ existing restroom plans, incorporate design modifications as needed and stamped final design documents and specifications. The project will be conducted in four (4) phases. In Phase One, the selected contractor shall conduct research and analysis on other proven and reliable no-flush restroom wastewater systems available on the market for BCPOS to consider and provide a recommendation. In Phase Two, the contractor shall provide technical engineering analysis of BCPOS’s current no-flush evaporative vault restroom system and provide recommendations for improved performance with system modifications (structural, mechanical, electrical, etc.) and/or maintenance process improvements. Additionally, the contractor will compare BCPOS’ existing facilities to other systems identified in Phase One and provide a recommendation of the system BCPOS should consider for use. In Phase Three, the contractor shall provide site investigation and structural and technical engineering review, analysis, and recommendations to improve and/or replace four (4) existing vault restroom systems. The potential exists to add one (1) add alternate restroom system, this add alternate is contingent on county funding. The contractor shall provide structural and technical engineering review, design modifications as needed and stamped final design documents and specifications (Final Plans and Specifications) to be used for permitting, bidding, and construction for the four (4) existing vault restroom systems and potentially the add alternate system. In Phase Four, the contractor shall provide as needed permitting and construction phase assistance to BCPOS. The selected Contractor must complete the Phases 1, 2 and 3 tasks of the Project as described in the Specifications section by March 31, 2024. Phase 4 tasks are contingent upon future county funding and would be started and completed after March 31, 2024.

NOTE: Tasks Contingent on County Funding

Phase Three – Tasks 5 and 6 and Add Alternative – Task 7 are optional tasks and are contingent upon on future funding by the County and Project approval.

Tasks 5 and 6 are anticipated to occur in 2024, however this schedule is subject to change. In the event the County proceeds with Phase Three – Tasks 5 and 6 and/or Add Alternative – Task 7; a Notice to Proceed will be issued separately for these tasks.

PAYMENT FOR SERVICES: Contractors are instructed to review the Data Requirements section specifically for all data related deliverables. Payment will be retained until the data submitted is 100% compliant with the County requirements as detailed.

Payments for the Project shall be made in line with the project phasing and the completion of each task per the specifications and bid tab cost proposal. The Contractor shall submit invoices, as applicable, to Boulder County at the completion of each task.

Contractor shall submit, in writing, to Boulder County, a request for payment. Invoices shall be submitted on company letterhead and include, but not limited to, depending on the activity completed, designated project name, date(s), type of work performed. Additionally, all invoices should contain the current date, invoice number, amount due and current return address.

Additionally, payment for Project awarded is subject to the terms and conditions of the Boulder County issued Purchase Order.

Submission Instructions

Showing 1 to 6 of 6 entries

Attachment Preview

Boulder County Purchasing
1325 Pearl Street
Boulder, CO 80302
SUBMISSION INSTRUCTIONS
Reference Number: RFP-004-23
Project Name: Engineering and Alternative Analysis of Vault Restroom Systems and Facilities and
Construction Ready Documents
Background:
Project Description:
The Boulder County Parks & Open Space Department (BCPOS) is seeking proposals from qualified
and experienced contractors to secure engineering services for performance and alternative
engineering analysis of BCPOS’ public use trailhead no-flush evaporative vault restroom systems.
The selected contractor will also conduct research on alternative restroom wastewater systems
and provide an analysis of those systems against BCPOS’ existing facilities. Additionally, the
selected contractor will provide structural and technical engineering review of BCPOS’ existing
restroom plans, incorporate design modifications as needed and stamped final design documents
and specifications. The project will be conducted in four (4) phases. In Phase One, the selected
contractor shall conduct research and analysis on other proven and reliable no-flush restroom
wastewater systems available on the market for BCPOS to consider and provide a
recommendation. In Phase Two, the contractor shall provide technical engineering analysis of
BCPOS’s current no-flush evaporative vault restroom system and provide recommendations for
improved performance with system modifications (structural, mechanical, electrical, etc.) and/or
maintenance process improvements. Additionally, the contractor will compare BCPOS’ existing
facilities to other systems identified in Phase One and provide a recommendation of the system
BCPOS should consider for use. In Phase Three, the contractor shall provide site investigation and
structural and technical engineering review, analysis, and recommendations to improve and/or
replace four (4) existing vault restroom systems. The potential exists to add one (1) add alternate
restroom system, this add alternate is contingent on county funding. The contractor shall provide
structural and technical engineering review, design modifications as needed and stamped final
design documents and specifications (Final Plans and Specifications) to be used for permitting,
bidding, and construction for the four (4) existing vault restroom systems and potentially the add
alternate system. In Phase Four, the contractor shall provide as needed permitting and
1
construction phase assistance to BCPOS. The selected Contractor must complete the Phases 1, 2
and 3 tasks of the Project as described in the Specifications section by March 31, 2024. Phase 4
tasks are contingent upon future county funding and would be started and completed after
March 31, 2024.
NOTE: Tasks Contingent on County Funding
Phase Three - Tasks 5 and 6 and Add Alternative - Task 7 are optional tasks and are contingent
upon on future funding by the County and Project approval.
Tasks 5 and 6 are anticipated to occur in 2024, however this schedule is subject to change. In the
event the County proceeds with Phase Three - Tasks 5 and 6 and/or Add Alternative - Task 7; a
Notice to Proceed will be issued separately for these tasks.
PAYMENT FOR SERVICES: Contractors are instructed to review the Data Requirements section
specifically for all data related deliverables. Payment will be retained until the data submitted is
100% compliant with the County requirements as detailed.
Payments for the Project shall be made in line with the project phasing and the completion of
each task per the specifications and bid tab cost proposal. The Contractor shall submit invoices, as
applicable, to Boulder County at the completion of each task.
Contractor shall submit, in writing, to Boulder County, a request for payment. Invoices shall be
submitted on company letterhead and include, but not limited to, depending on the activity
completed, designated project name, date(s), type of work performed. Additionally, all invoices
should contain the current date, invoice number, amount due and current return address.
Additionally, payment for Project awarded is subject to the terms and conditions of the Boulder
County issued Purchase Order.
Instructions:
Boulder County uses a Bonfire portal https://bouldercounty.bonfirehub.com/ for accepting and
evaluating proposals digitally:
To post the Proposal
To receive any questions or inquiries
To issue any associated addenda
To post award notices
Proposals must be submitted electronically on or before the Close Date at
https://bouldercounty.bonfirehub.com/. Submissions will not be accepted by email, fax or hand-
delivery; unless otherwise noted.
Documents should not be embedded within uploaded files, as the embedded files will not be
accessible or evaluated.
2
Contact:
To contact Boulder County Purchasing or ask questions in relation to this proposal, respondents
must register on https://bouldercounty.bonfirehub.com/ and initiate the communication
electronically through the Vendor Discussions or the Ask a Question feature.
All questions must be received on or before the Deadline for Submission of Clarifications, as
specified in the Schedule of Events. Boulder County will not accept any respondent’s
communications by any other means, except as specifically stated in this proposal.
Addendum:
At any time prior to the Close Date, Boulder County may alter, clarify, amend, delete or add to, in
whole or in part, any terms or provisions of this proposal.
In order to afford the Bidders a reasonable time for taking into account a material amendment
(the materiality of which Boulder County in its own discretion may determine) or for any other
reason, Boulder County may, at its own discretion, extend the Close Date.
For the most up-to-date project information refer to our Bonfire portal.
All vendor submissions may be amended, but only before the Close Date on
https://bouldercounty.bonfirehub.com/.
Need Help:
To assist with registration and submission of responses, learn how to get started with Bonfire,
watch this 5 minute training video. For questions or support when using the platform, access the
Bonfire online knowledge base, search the FAQ or contact the Bonfire support team
at support@gobonfire.com.
Americans with Disabilities Act (ADA): Americans with Disabilities Act: If you need special services
provided for under the Americans with Disabilities Act (ADA), please contact the Boulder County
ADA Coordinator or Human Resources office at (303) 441-3525 as soon as possible to allow
sufficient time for service delivery ahead of applicable due dates.
3
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >