Station 26 Reconstruction Project

Agency: City of Kalamazoo
State: Michigan
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD11717531618906475
Posted Date: Feb 7, 2024
Due Date: Mar 7, 2024
Solicitation No: Reference number: 90900-017.0
Source: Members Only
Station 26 Reconstruction Project

Closing date March 07, 2024, 03:00 PM

  • Reference number 90900-017.0
  • Status Open
  • Summary It is the intent of these plans and specifications to provide for a contractor who shall provide all labor, materials, tools and equipment necessary to perform in a professional manner for the Station 26 Reconstruction Project as described in the specifications and bid document. This contract includes all work as shown on the drawings and described in the specifications for the reconstruction

90900-017.0-Bid Document (PDF, 22MB)

90900-017.0-distribution list (PDF, 76KB)

90900-017.0-Actuated Butterfly Valve Specifications (PDF, 13KB)

90900-017.0-Flow meter specifications (PDF, 2MB)

90900-017.0-Pressure Transmitter Specifications (PDF, 1MB)

90900-017.0-Water Main Standard Specifications (PDF, 2MB)

90900-017.0-Special Provisions (PDF, 61KB)

90900-017.0-Plans (PDF, 17MB)

NON-MANDATORY PRE-BID MEETING/SITE INSPECTIONS

February 21, 2024, at 10:00 a.m.

Location: Markin Glen Park, 5271 N. Westnedge Avenue, Kalamazoo, MI 49004

SCOPE OF WORK

The project involves the removal of existing piping and ancillary equipment; and the installation of new piping, valves, and ancillary equipment located in a below grade vault. Contractor is responsible for providing all materials, labor and equipment necessary to complete the work, including assuring compliance with confined space entry regulations, guidelines and procedures.

A new motor actuated butterfly valve meeting the requirements in the included actuated butterfly valve specifications section shall be provided and installed by the Contractor. Alternative valves and/or actuators shall not be allowed. Electrical work and subsequent connections will be performed by others under separate contract at a later date.

A new magnetic flow meter meeting the requirements in the included flow meter specifications section shall be provided and installed by the contractor. Alternative flow meters and associated equipment shall not be allowed. Electrical work and subsequent connections will be performed by others under separate contract at a later date.

New pressure transmitters meeting the requirements in the included pressure transmitter specifications section shall be provided and installed by the contractor. Alternative pressure transmitters and associated equipment shall not be allowed. Electrical work and subsequent connections will be performed by others under separate contract at a later date.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >