RFQ- Progressive Design-Build Services for Southeast Area Improvements- St. James Water Infrastructure Project

Agency: State Government of North Carolina
State: North Carolina
Level of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD12271365902940400
Posted Date: Dec 3, 2023
Due Date: Jan 8, 2024
Solicitation No: 299-299-RFQ
Source: Members Only
Solicitation Number Project Title Description Opening Date Posted Date Status Department
299-299-RFQ RFQ- Progressive Design-Build Services for Southeast Area Improvements- St. James Water Infrastructure Project Pursuant to N.C.G.S. 143-128.1A, 2 C.F.R. 200.320(b)(2), and S.L. 2021-189 enacted by the North Carolina General Assembly in December 2021, Brunswick County is inviting qualified Design-Builders to submit qualifications statements for the design and construction of essential water infrastructure enhancements in the Town of St. James area of Brunswick County as more fully set forth herein.
The County finalized a Preliminary Engineering Report (PER) that provides recommendations for addressing the project’s objective of alleviating reduced pressure concerns in the Town of St. James and surrounding areas during peak demand periods. This project shall follow the recommendations in the PER, as the basis for this project. The recommendations include the design and construction of the following:
•        St. James 211 Gap Water Line – Approximately 5,920 LF of 16-inch water main, beginning 6,800 feet east E.F. Middleton Boulevard and running to the east to a point approximately 600 feet west of St. James Drive.
•        16-inch Check Valve – Check valve vault, by-pass line and associated piping and valves. Insert into the existing 16-inch water line on E.F. Middleton Boulevard at its intersection with Highway 211.
•        E.F. Middleton Boulevard Transmission Main Extension – Approximately 4,850 LF of 16-inch water line southward along E.F. Middleton Boulevard from Seafield Drive. Then, approximately 1900 LF of 12-inch (nominal I.D. via trenchless installation) water line eastward to Holly Harbor Drive.
•        Design and Construction of Small Interconnections:
o        Somerdale Court to Oceanic Drive – approximately 275 l.f. of 4” water line
o        Worthington Place to Westland Lane – approximately 550 l.f. of 4” water line
o        Medina Court to Member’s Club Boulevard – approximately 350 l.f. of 4” water line

1/8/2024 4:30 PM 12/2/2023 Open COUNTY OF BRUNSWICK

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >