2021-18; South Second Street Interceptor Project

Agency: City of Newark
State: Ohio
Level of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD12765591507304172
Posted Date: Aug 21, 2023
Due Date: Sep 1, 2023
Source: Members Only
Number Deadline
2021-18; South Second Street Interceptor Project
A MANDATORY PRE-BID MEETING IS SCHEDULED FOR AUGUST 15TH, 2023, AT 10:00 AM. SEE SECTION 00 10 00 OF THE BID BOOK FOR MORE DETAILS.

This Project is located in Newark, Ohio and extends on S. 2nd Street between E. Walnut Street and the South Fork Licking River and on National Drive between S. 4th Street and S. 2nd Street. The Work to be performed includes, but is not limited to, separating combined sewers and constructing new sanitary and storm sewers by means of open-cut, with all associated manholes and appurtenances; replacement and consolidation of potable drinking water piping including all associated valves, hydrants, and appurtenances; replacing streets including curbs, sidewalks, and accessories; pedestrian-friendly features; lighting, and associated components as specified in these contract documents. The Work will include trenchless installation of sanitary sewer pipe underneath the Genesee and Wyoming Railroad. The Work will include the demolition of the existing CSO 1013 structure and construction of a new CSO 1013 structure. The Work will include the demolition of the existing Stop Log Storage Building and construction of a new Stop Log Storage Building. - REVISED PER ADDENDUM NO. 2

Engineer's estimate of probable cost is:
$24,122,000 (Base Bid) - REVISED PER ADDENDUM NO. 2
$ 4,256,500 (Alternate Bid) - REVISED PER ADDENDUM NO. 2

09/01/2023 03:00 PM UTC

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >