Request for Qualifications for Architectural Services to Design Physical Barriers for the Skagit County Community Justice Center (Jail)

PROJECT DESCRIPTION

This project consists of designing physical barriers and other measures in vicinity of detention center mezzanine railings that are nearly identical in seven pods. The installed physical deterrents must maintain control room visibility/transparency and consider fire sprinkler head spray patterns. The facility opened in 2017 and is located in Mount Vernon, WA.
The work to be performed by the selected consultant will consist of, but not be limited to design of the project; preparation of project plans and specifications in compliance with local, state, and federal requirements; construction cost estimate; permitting; and potentially construction management.

LETTER OF INTENT

All consultants intending on submitting a Statement of Qualifications in response to this RFQ are required to submit a letter of Intent to Ken Hansen, Facilities Management Director, at khansen@co.skagit.wa.us by April 11, 3:30 pm per the schedule below. The letter can be in form of an email and should identify the following information:

Company Name

RFQ Contact for Company

Address for Company Contact

Phone Number for Company Contact

E-mail address for Company Contact

The Letter of Intent must be electronically mailed with “Letter of Intent” in subject line. The letter does not commit the firm to respond to the RFQ, but insures they will receive any clarifying details and responses to questions submitted by other competitors. Once your letter of intent is received you will receive a confirmation via electronic mail including a few facility drawings to help visualize the scope and scale of this project.

SUBMITTAL

Cover letter shall include the following information: Firm name, phone number, and email address; Name of Principal-in-Charge, Project Manager, and Key Personnel. The submittal package shall be limited to no more than twenty (20) letter size pages.

Submittals will be evaluated and ranked based on the following criteria:

1) Key personnel (15%);

2) Firm’s experience with detention facility standards, specifications, and requirements – include at least three projects (30%);

3) Experience designing climb mitigation measures, preferably a retrofit (35%);

4) Past performance/ references (20%). Selection will be made on qualifications submitted. Highest ranking firms will be interviewed, and results will be shared with all firms that submitted a Statement of Qualifications (SOQ).

No cost proposals are requested at this time, and any questions regarding this project shall be directed to Ken Hansen at (360) 416-1179 or email above by April 11 at 3:30 pm. Please email a PDF copy of your SOQ with the subject line reading “Skagit County Physical Barriers” by April 18, 2024, no later than 3:30 p.m. No submittals will be accepted after that date and time.

RFQ document posted on skagitcounty.net March 26, 2024

Deadline for Submitter Letter of Intent April 11, 2024 3:30 PM (PDT)

Deadline for Submitter Questions April 11, 2024 3:30 PM (PDT)

Deadline for Response to Submitter Questions April 15, 2024 3:30 PM (PDT)

Deadline for receiving Statement of Qualifications April 18, 2024 3:30 PM (PDT)

Anticipated Design Team Selection May 3, 2024

Skagit County reserves the sole right to terminate this process, to not award a contract, and to cancel or modify this solicitation process at any time.
In no event will the County or any of their respective agents, representatives, consultants, directors, officers, or employees be liable for, or otherwise obligated to reimburse, the costs incurred in preparation of this RFQ, or any related costs. The prospective consultant teams shall wholly absorb all costs incurred in the preparation and presentation of the submittals. The RFQ Submittals will become the property of Skagit County.

RFQ DOCUMENTS

Attachment Preview

AIA® Document B103– 2017
Standard Form of Agreement Between Owner and Architect for a
Complex Project
F
AGREEMENT made as of the ____ « » day of __________ « » in the year 2024.« »
(In words, indicate day, month and year.)
BETWEEN the Architect’s client identified as the Owner:
(Name, legal status, address and other information)
Skagit County, a Municipal Corporation
1800 Continental Place
Mount Vernon, WA 98273
« »« »
«»
«»
«»
and the Architect:
(Name, legal status, address and other information)
« »« »
«»
«»
«»
for the following Project:
(Name, location and detailed description)
Skagit County
ADDITIONS AND DELETIONS: The
author of this document has
added information needed for
its completion. The author
may also have revised the
text of the original AIA
standard form. An Additions
and Deletions Report that
notes added information as
well as revisions to the
standard form text is
available from the author and
should be reviewed.
This document has important
legal consequences.
Consultation with an
attorney is encouraged with
respect to its completion or
modification.
«»
«»
«»
The Owner and Architect agree as follows.
ELECTRONIC COPYING of any
portion of this AIA® Document to
another electronic file is
prohibited and constitutes a
violation of copyright laws as
set forth in the footer of this
document.
AIA Document B103 – 2017. Copyright © 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,”
“AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:19:01
ET on 11/03/2023 under Order No.2114484264 which expires on 11/02/2024, is not for resale, is licensed for one-time use only, and may only be
1
used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes:
(1635405394)
TABLE OF ARTICLES
1
INITIAL INFORMATION
2
ARCHITECT’S RESPONSIBILITIES
3
SCOPE OF ARCHITECT’S BASIC SERVICES
4
SUPPLEMENTAL AND ADDITIONAL SERVICES
5
OWNER’S RESPONSIBILITIES
6
COST OF THE WORK
7
COPYRIGHTS AND LICENSES
8
CLAIMS AND DISPUTES
9
TERMINATION OR SUSPENSION
10
MISCELLANEOUS PROVISIONS
11
COMPENSATION
12
SPECIAL TERMS AND CONDITIONS
13
SCOPE OF THE AGREEMENT
ARTICLE 1 INITIAL INFORMATION
§ 1.1 This Agreement is based on the Initial Information set forth in this Section 1.1.
(For each item in this section, insert the information or a statement such as “not applicable” or “unknown at time of
execution.”)
§ 1.1.1 The Owner’s program for the Project:
(Insert the Owner’s program, identify documentation that establishes the Owner’s program, or state the manner in
which the program will be developed.)
The basis of design will be the program as created by Architect and as approved in writing by Owner.
«»
§ 1.1.2 The Project’s physical characteristics:
(Identify or describe pertinent information about the Project’s physical characteristics, such as size; location;
dimensions; geotechnical reports; site boundaries; topographic surveys; traffic and utility studies; availability of
public and private utilities and services; legal description of the site, etc.)
«»
§ 1.1.3 The Owner’s budget for the Cost of the Work, as defined in Section 6.1:
(Provide total and, if known, a line item breakdown.)
Project budget is $_____.
«»
§ 1.1.4 The Owner’s anticipated design and construction milestone dates:
.1 Design phase milestone dates, if any:
AIA Document B103 – 2017. Copyright © 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,”
“AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:19:01
ET on 11/03/2023 under Order No.2114484264 which expires on 11/02/2024, is not for resale, is licensed for one-time use only, and may only be
2
used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes:
(1635405394)
Permit documents no later than <date>.
Bidding documents no later than <date>.
«»
.2 Construction commencement date:
A date set forth in the notice to proceed issued by the Owner, currently anticipated to be no later than
<date>.
«»
.3 Substantial Completion date or dates:
Currently anticipated that Substantial Completion shall be no later than <date>.
«»
.4 Other milestone dates:
NA
«»
§ 1.1.5 The Owner intends the following procurement and delivery method for the Project:
(Identify method such as competitive bid or negotiated contract.)
Competitive bid through the public procurement process with alternatives.
«»
§ 1.1.6 The Owner’s requirements for accelerated or fast-track design and construction, multiple bid packages, or
phased construction are set forth below:
(List number and type of bid/procurement packages.)
The Architect will provide a single bid package to include all drawings and specifications.
«»
§ 1.1.7 The Owner’s anticipated Sustainable Objective for the Project:
(Identify and describe the Owner’s Sustainable Objective for the Project, if any.)
«»
§ 1.1.7.1 If the Owner identifies a Sustainable Objective, the Owner and Architect shall complete and incorporate AIA
Document E204™–2017, Sustainable Projects Exhibit, into this Agreement to define the terms, conditions and
services related to the Owner’s Sustainable Objective. If E204-2017 is incorporated into this agreement, the Owner
and Architect shall incorporate the completed E204–2017 into the agreements with the consultants and contractors
performing services or Work in any way associated with the Sustainable Objective.
§ 1.1.8 The Owner identifies the following representative in accordance with Section 5.4:
(List name, address, and other contact information.)
«»
«»
«»
«»
«»
«»
AIA Document B103 – 2017. Copyright © 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,”
“AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:19:01
ET on 11/03/2023 under Order No.2114484264 which expires on 11/02/2024, is not for resale, is licensed for one-time use only, and may only be
3
used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes:
(1635405394)
§ 1.1.9 The persons or entities, in addition to the Owner’s representative, who are required to review the Architect’s
submittals to the Owner are as follows:
(List name, address, and other contact information.)
Skagit County Facilities Management
1800 Continental Place
Mount Vernon, WA 98273
«»
§ 1.1.10 The Owner shall retain the following consultants and contractors:
(List name, legal status, address, and other contact information.)
.1 Cost Consultant:
NA
« »« »
«»
«»
«»
«»
.2 Scheduling Consultant:
NA
« »« »
«»
«»
«»
«»
.3 Geotechnical Engineer:
NA
« »« »
«»
«»
«»
«»
.4 Civil Engineer:
NA
« »« »
«»
«»
«»
«»
.5 Other, if any:
(List any other consultants and contractors retained by the Owner.)
«»
§ 1.1.11 The Architect identifies the following representative in accordance with Section 2.3:
AIA Document B103 – 2017. Copyright © 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,”
“AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:19:01
ET on 11/03/2023 under Order No.2114484264 which expires on 11/02/2024, is not for resale, is licensed for one-time use only, and may only be
4
used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes:
(1635405394)
(List name, address, and other contact information.)
«»
«»
«»
«»
«»
«»
§ 1.1.12 The Architect shall retain the consultants identified in Sections 1.1.12.1 and 1.1.12.2:
(List name, legal status, address, and other contact information.)
§ 1.1.12.1 Consultants retained under Basic Services:
.1 Structural Engineer:
« »« »
«»
«»
«»
«»
.2 Mechanical/Electrical/Plumbing/Fire Engineer:
« »« »
«»
«»
«»
«»
.3 Civil
Electrical Engineer:
.4 Cost Consultant
« »« »
«»
«»
«»
«»
§ 1.1.12.2 Consultants retained under Supplemental Services:
.1 Landscape Design
.2 Lighting Design
AIA Document B103 – 2017. Copyright © 2007 and 2017. All rights reserved. “The American Institute of Architects,” “American Institute of Architects,”
“AIA,” the AIA Logo, and “AIA Contract Documents” are trademarks of The American Institute of Architects. This draft was produced at 14:19:01
ET on 11/03/2023 under Order No.2114484264 which expires on 11/02/2024, is not for resale, is licensed for one-time use only, and may only be
5
used in accordance with the AIA Contract Documents® Terms of Service. To report copyright violations, e-mail docinfo@aiacontracts.com.
User Notes:
(1635405394)
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >