Air Handling Unit Replacement

Agency: State Government of Wisconsin
State: Wisconsin
Level of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
Opps ID: NBD14016348707520883
Posted Date: Jul 31, 2020
Due Date: Sep 2, 2020
Solicitation No: 19J3Y (Proposal)
Source: Members Only
Project Number: 19J3Y
Project Title: Air Handling Unit Replacement
Bid Date: 09/02/2020
Bid ID: 8648
Notes:
Bid Bond: True
CD Available: False
Bid Documents Available Via: Download

View/Download Files: (Large files may result in long download times)
Document Type View/Download File
A-1, Invitation to Bidders 19J3Y-00-BD A-1 Doc.pdf (103.88 KB)
Specification Table of Contents 19J3Y-00-BD-TOC.pdf (71.58 KB)
Specifications Login Required
Drawings Login Required


Attachment Preview

1 NOTICE OF ADVERTISEMENT FOR BIDS
2 DIVISION OF FACILITIES DEVELOPMENT (Rev 11/2017)
3
4
5
AIR HANDLING UNIT REPLACEMENT
6
VETERINARY DIAGNOSTIC LABORATORY
7
UNIVERSITY OF WISCONSIN - MADISON
8
BARRON, WISCONSIN
9
10
11
DOA/DFD Project No. 19J3Y
12
Project Manager: Casey Coddington
13
14
15
16
17 CLOSING DATE FOR BIDS: September 2, 2020 2:00 PM
18 The Division of Facilities Development, hereinafter termed DFD, hereby announces that it is
19 advertising for bids from certified contractors for the above project.
20
21 NOTICE: All potential bidders must become certified by DOA prior to submitting bids on
22 state construction projects with budgets over $50,000. All bids received from contractors
23 who are not certified will be rejected. These changes take effect January 1, 2014. Contractor
24 certification applications and instructions for completing the form may be obtained from the DOA
25 Website. DFD Contractor Certification page:
26 https://doa.wi.gov/Pages/DoingBusiness/ContractorCertification.aspx or upon request from
27 DFD--email dfdcertification@wisconsin.gov.
28
29 Bids must be received at State of Wisconsin Administration Building, 101 East Wilson Street, 7th
30 Floor Reception Desk, Madison, Wisconsin 53703, on or before the closing date and time
31 indicated above.
32
33 In general, the work consists of: Installation of an outdoor heat recovery type air handling
34 unit system to replace furnaces. Air conditioning will be provided by air cooled
35 condensing unit.
36
37 Construction bidding documents (drawings, specifications and addenda) may be obtained only
38 as downloadable electronic files (in PDF format) from the Division of Facilities Development
39 website. Construction bidding documents may also be available at various Builders’ Exchanges.
40 Additional project construction bidding information, including plan holders list, is available on the
41 DFD website. Please note that a WisBuild login and password are required to download bidding
42 documents. Interested parties may request a WisBuild login and password at the DFD website
43 allow 2 days to process login and password requests.
44
45 The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin’s
46 prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements
47 on state building projects no longer apply. These changes take effect for projects
48 advertised for bid after September 23, 2017. This change does not affect the Federal
49 Davis Bacon Act requirements.
50
51
52
53
DFD Project 19J3Y
Page A-1
1 A pre-bid tour will be held on 8/14/2020 at 9:30AM. Attendance is non-mandatory. Meet at front
2 lobby of building. Jill Fries, Supervisor, 715-637-3151.
3
4
5
6
DFD Project 19J3Y
Page A-2
This is the opportunity summary page. You are currently viewing an overview of this opportunity and a preview of the attached documentation. For more information, please visit the Publication URL Web page.

TRY FOR FREE

Not a USAOPPS Member Yet?

Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

Start Free Trial Today >