King and Queen County School Well System Improveme...

Agency: State Government of Virginia
State: Virginia
Level of Government: State & Local
Category:
  • U - Education and Training Services
Opps ID: NBD14089055069625617
Posted Date: Jun 23, 2023
Due Date: Jul 6, 2023
Solicitation No: QQ 19180
Source: Members Only
Views: Current Version ( 7 ) All Versions ( 7 )
Details


QQ-19180


  • King and Queen County School Well System Improvement
  • Status: Open
  • Time Left:13 days, 20 hours
  • Closing:7/6/23 5:00 PM
  • Issued:6/22/23 4:27 PM
  • Last Updated:
  • Buyer:Tina Ammons

  • tammons@kingandqueenco.net
  • 804-785-5975



QQ-19180


  • King and Queen County School Well System Improvement
  • Status: Open
  • Time Left:13 days, 20 hours
  • Closing:7/6/23 5:00 PM
  • Issued:6/22/23 4:27 PM
  • Last Updated:
  • Buyer:Tina Ammons

  • tammons@kingandqueenco.net
  • 804-785-5975

  • Issued By:King and Queen County
  • Opportunity Type:Quick Quote
  • Category:Construction
  • Work Location:King and Queen County Central High School
    17024 The Trail
    King and Queen Court House, VA 23085
  • Website:
  • Summary:Existing King & Queen County High School waterworks system is over 50 years old and requires modernization to provide increased water capacity and reliability for school and adjacent chiller system. Design/Build contractor (Contractor) will provide and submit design drawings and submittal necessary for Virginia Department of Health Office of Drinking Water (ODW) approval. A new well is currently being drilled and new well data can be requested from the county administrator’s office. Once ODW approval is received, the Contractor will complete scope of work described below; which shall be completed by July 28, 2023.

    The improvements to the water system shall include:
    o        Take 5,000 gallon hydropneumatic tank offline
    o        Create 5,000 gallon of unpressurized ground storage to increase effective storage and allow for trucked water if well is out of service.
            Tank shall have
    •        level sensor rods
    •        Fire Department Connection
    •        Access hatch or viewing port on top of tank.
    •        Inlet & Outlet properly sized for well and school flows
            Clean and disinfect interior of tank
            Field paint exterior of tank
    o        Install duplex booster system capable of 50 gpm @ 55 psi.
    o        Install new 4”well pump end and associated motor capable of 40 gpm @ head to be determined (contact the county administrator’s office for drilling records)
    o        Install pipe and power line between well and existing pump house.
    o        Install new wall/ceiling mount heater.
    o        Clean and paint existing block building.
    o        Clear building drain and dig small swale as necessary.
    o        Install two (2) 119 gallon bladder tanks for pressurized storage

    To ensure single point of contact, the Contractor shall have on staff professional engineers registered in the Commonwealth of Virginia. Furthermore the Contractor shall self perform all mechanical and electrical work as necessary to complete the required scope of work. Upon request contractor shall provide at least 5 examples of similarly scoped design/build projects performed in Virginia. To contact the county administrator’s office, call (804) 785-5975 or email vseay@kingandqueenco.net or buildingofficial@kingandqueenco.net.

Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
  • Grid 1 - Response
    • I1_1. Existing King & Queen County High School waterworks system is over 50 years old and requires modernization to provide increased water capacity and reliability for school and adjacent chiller system. Design/Build contractor (Contractor) will provide and submit design drawings and submittal necessary for Virginia Department of Health Office of Drinking Water (ODW) approval. A new well is currently being drilled and new well data can be requested from the county administrator’s office. Once ODW approval is received, the Contractor will complete scope of work described below; which shall be completed by July 28, 2023. The improvements to the water system shall include: o        Take 5,000 gallon hydropneumatic tank offline o        Create 5,000 gallon of unpressurized ground storage to increase effective storage and allow for trucked water if well is out of service.         Tank shall have •        level sensor rods •        Fire Department Connection •        Access hatch or viewing port on top of tank. •        Inlet & Outlet properly sized for well and school flows         Clean and disinfect interior of tank         Field paint exterior of tank o        Install duplex booster system capable of 50 gpm @ 55 psi. o        Install new 4”well pump end and associated motor capable of 40 gpm @ head to be determined (contact the county administrator’s office for drilling records) o        Install pipe and power line between well and existing pump house. o        Install new wall/ceiling mount heater. o        Clean and paint existing block building. o        Clear building drain and dig small swale as necessary. o        Install two (2) 119 gallon bladder tanks for pressurized storage
    • NIGP Code:
    • Quantity: 1.00000 each
    • Delivery Date:

    B2B Follow ×
    Enter Email Address:
    CloseSubmit
    B2B Unfollow ×
    Enter Email Address:
    CloseSubmit
    Add B2B Posting ×
    Contact Name:
    Company Name:
    Email Address:
    Phone Number:
    SWaM Certifications:

    Micro Business

    Small Business

    Minority Owned Business

    Women Owned Business

    Service Disabled Veteran Owned

    Employment Service Org
    Message:
    CloseSubmit

    TRY FOR FREE

    Not a USAOPPS Member Yet?

    Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

    Start Free Trial Today >