DMA Blackstone Army Airfield Flight Control Tower ...

Agency: State Government of Virginia
State: Virginia
Level of Government: State & Local
Category:
  • 16 - Aircraft Components and Accessories
  • 66 - Instruments and Laboratory Equipment
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Opps ID: NBD14089276917866169
Posted Date: Jul 27, 2023
Due Date: Aug 29, 2023
Solicitation No: IFB 21562
Source: Members Only
Views: Current Version ( 28 ) All Versions ( 28 )
Details


IFB-21562


  • DMA Blackstone Army Airfield Flight Control Tower PC#123-18536-000/511500
  • Status: Open
  • Time Left:32 days
  • Closing:8/29/23 2:30 PM
  • Issued:7/27/23 9:47 AM
  • Last Updated:
  • Buyer:Jacqueline Walker

  • jacqueline.g.walker3.nfg@army.mil
  • 434-292-2664



IFB-21562


  • DMA Blackstone Army Airfield Flight Control Tower PC#123-18536-000/511500
  • Status: Open
  • Time Left:32 days
  • Closing:8/29/23 2:30 PM
  • Issued:7/27/23 9:47 AM
  • Last Updated:
  • Buyer:Jacqueline Walker

  • jacqueline.g.walker3.nfg@army.mil
  • 434-292-2664

Actions
Solicitation only accepts paper responses.
  • Issued By:Department of Military Affairs
  • Opportunity Type:Invitation for Bids (IFB)
  • Category:Construction
  • Work Location:Blackstone Army Airfield, 49 Dominy Corner Road, Blackstone, VA 23824
  • Website:
  • Pre-Bid Conference:See solicitation documents for mandatory prebid/proposal conference/site visit.
  • Open Responses:See solicitation documents Public Opening information.
  • Summary:The project is generally described as the construction of a new five-story flight control tower with emergency back-up generator, fire alarm system, plumbing, and HVAC. The tower will be constructed with a cast-in-place reinforced concrete frame with Concrete Masonry Unit (CMU) infill and finished with an Exterior Insulation and Finish System (EIFS) and will house relocated infrastructure from the existing flight control tower and communications building. Site elements include gravity sanitary sewer, potable water supply, communications and fire alarm infrastructure, power supply, gravel access road, and concrete walks.

    PLEASE SEE ATTACHMENTS FOR COMPLETE IFB INSTRUCTIONS
    POC: BILLY COLE AT 804-814-6510
    William.l.cole.nfg@army.mil

Documents
Document Size Description Posted On Type
A70.1 - IFB Final.pdf (89.04 KB) IFB BAAF Flight Control Tower 7/27/23 RFx Document
dgs-30-384_01-21_eva-regist1.pdf (113.1 KB) eVA Registration Instructions 7/27/23 RFx Document
Follow B2B ActivityUnfollow B2B ActivityAdd B2B Posting
There are no B2B messages to display
  • Grid 1 - Response
    • I1_1. The project is generally described as the construction of a new five-story flight control tower with emergency back-up generator, fire alarm system, plumbing, and HVAC. The tower will be constructed with a cast-in-place reinforced concrete frame with Concrete Masonry Unit (CMU) infill and finished with an Exterior Insulation and Finish System (EIFS) and will house relocated infrastructure from the existing flight control tower and communications building. Site elements include gravity sanitary sewer, potable water supply, communications and fire alarm infrastructure, power supply, gravel access road, and concrete walks.
    • NIGP Code: 90930 Building Construction (Not Otherwise Classified)
    • Quantity: 1.00000 lump sum
    • Delivery Date:

    B2B Follow ×
    Enter Email Address:
    CloseSubmit
    B2B Unfollow ×
    Enter Email Address:
    CloseSubmit
    Add B2B Posting ×
    Contact Name:
    Company Name:
    Email Address:
    Phone Number:
    SWaM Certifications:

    Micro Business

    Small Business

    Minority Owned Business

    Women Owned Business

    Service Disabled Veteran Owned

    Employment Service Org
    Message:
    CloseSubmit

    TRY FOR FREE

    Not a USAOPPS Member Yet?

    Get unlimited access to thousands of active local, state and federal government bids and awards in All 50 States.

    Start Free Trial Today >